Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date12 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 1,46,66,000
Costs
EMD
₹ 3,50,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Tn 33/2024-25/edc(ch) Replacement Of Bare Conductor By Insulated Covered Conductor (aaac) In 11 Kv Chalthi Feeder
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL3_75279_2Bid Award Id
ViewTender No
33/2024-25/EDC(CH)Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
HT Stay Insulator.
260
-
-
Bracing Clamp top for SP-23 Pole with Nut & Bolt.
230
-
-
Bracing Clamp Bottom for SP-23 Pole with Nut & Bolt.
230
-
-
IPC with Aluminium Bail for Earthing.
225
-
-
11 KV Cable Ties for Pin Insulator.
410
-
-
11 KV IPC for Covered to Coverd Conductor.
330
-
-
11 KV IPC for Covered to bare Conductor.
290
-
-
11 KV Mid Span Jointing Kit.
230
-
-
11 KV Composite Poly, Disc Insulator 70 KN.
280
-
-
Disc Fitting (B&S) type 70 Kn 33 KV.
280
-
-
11 KV AAAC Al-59, 70 sq.mm covered Conductor.
16500
-
-
11 KV Tension Clamp with bail & IPC.
274
-
-
Annexure-B (Following work as per UPCL Norms/Site Requirement /RESPO)
-
-
-
Excavation of pit for stay set.
64.8
-
-
Erection of 11 KV Stay set.
150
-
-
Grouting of Stay Set.
16.2
-
-
Excavation of pit for pole.
91.8
-
-
Erectin of SP-23 Double pole
60
-
-
Grouting of Pole.
22.95
-
-
Muffing of poles
120
-
-
Cartage SP-21/23 pole distance 71 to 100 Km.
120
-
-
Head Load Cartage SP-21/23 pole distance 1-3 Km.
120
-
-
Head Load Cartage material distance 1-3 Km.
102
-
-
Fixing of IPC with Al. Bail for Earthing.
96
-
-
Fixing of 11 KV 90 KN tension Clamp B& IPC.
210
-
-
Fixing of 11 KV Mid Span Jointing Kit.
48
-
-
Fixing of 11 KV IPC for Covered Covered.
70
-
-
Fixing of 11 KV IPC covered to bared Conductor
125
-
-
Supply & Fixing of anti Clmbing Device.
65
-
-
Laying Spreadign, Stringing AAAC Conductur.
14200
-
-
11 KV Cable Ties for Pin Insulator.
380
-
-
Removing Old Conductor by Opending Jumper.
3500
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements