Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date28 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 16,55,000
Costs
EMD
₹ 50,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL3_79233_1Tender No
18/EDC(P)/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Steel pole 8.0 mtr. SP-10 (BPHD)
32
-
-
... More
Other material
72.28
-
-
... More
Head load cartage of following material from road to site approx distance 3.00 Km
-
-
-
... More
Steel pole 8.5 mtr. SP-23 (BPHD)
55
-
-
... More
Steel pole 8.5 mtr. SP-21 (BPHD)
14
-
-
... More
T/F 11/0.4 KV 25 KVA
32
-
-
... More
Other material
72.28
-
-
... More
Dismanteling of existing/damage HT/LT line transformer etc including disc fitting, insulator, clamps Nut & Bolts and consumer connection
-
-
-
... More
SP-10 Single pole
5
-
-
... More
SP-21 Single pole
4
-
-
... More
SP-23 double pole
3
-
-
... More
11 KV line 3P 4 WIRE
2.1
-
-
... More
LT line 3P 4 WIRE
1.4
-
-
... More
Stay set
13
-
-
... More
Exavation of earth for pole pit of size 0.9x0.9x1/6 of full lenth of polestay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.
-
-
-
... More
Steel pole 8.5 mtr. SP-23 (BPHD)
42.08
-
-
... More
Steel pole 8.5 mtr. SP-21 (BPHD)
10.71
-
-
... More
Steel pole 8.0 mtr. SP-10 (BPHD)
23.04
-
-
... More
Erection of pole support as per RESSPO specification of the following types of poles in boulder mixed soil, grouting of support in CC 1:4:8 block incuding cost of ballast,cement and sand, back filling of soil and boulders in pit and ramming filling of accessories of the pole, leveling and erection of pole
-
-
-
... More
SP-23 (with CC) Double Pole
18
-
-
... More
SP-23 (with CC) Single Pole
19
-
-
... More
SP-21 (with CC) Single Pole
14
-
-
... More
SP-10 (with CC) Single Pole
32
-
-
... More
Grouting of pole in size 0.45x0.45x1/6 of the supprt in cc ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper allignment leveling as per resspo construction manual
-
-
-
... More
Steel pole 8.5 mtr. SP-23 (BPHD)
14.11
-
-
... More
Steel pole 8.5 mtr. SP-21 (BPHD)
3.71
-
-
... More
Steel pole 8.0 mtr. SP-10 (BPHD)
1.14
-
-
... More
Muffing of poles with CC1;3;6 block and 45 Cm hight from ground level including cost of ballast, cement & sand
101
-
-
... More
fabrication of ms channel and ms angle and complete hole with proper size and all type work complete
1537
-
-
... More
Exavation of earth for stay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.
59.18
-
-
... More
Fixing,tightining and nozzaling of stay with pole and stay rod on required tension as per drawing /resspo manual for 11KV line
91
-
-
... More
Fixing,tightining and nozzaling of stay with pole and stay rod on required tension as per drawing /resspo manual for LT line
46
-
-
... More
Grouting of stay in size 0.6x0.6x0.3 in cc ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper allignment leveling as per resspo construction manual.
14.8
-
-
... More
Erection & earthing of support with MS Earth rod of 2.5 Mtr long incuding exavation of pit and digging of MS rod proper depth and connecting the earth electrode with the GI wire as per instruction manual
9
-
-
... More
Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart
4.93
-
-
... More
Laying, spreading, stringing and sagging of LT line of the following wire as phase wire with G.I. wire complete with binding and jumoering as per RESSPO specn
-
-
-
... More
ACSR Weasel conductor 3 Phase 4 Wire
3.72
-
-
... More
Guarding of LT/11 KV Line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guar ding channel/ angle as per RESSPO manual.
12
-
-
... More
Route clearance by cutting of tree branches/ proning, loping and chopping of trees for 11 KV line
10.54
-
-
... More
LAYING STRINGING AND SAGGING OF LT AB CABLE 3X35+1X25 SQMM
1890
-
-
... More
EXCAVATION IN FOUNDATION FOR RETAINING, BREAST WALLS ETC., IN ALL TYPE OF SOILS AND ROCKS INCLUDING ALL LEAD, LIFT AND DISPOSAL OF SURPLUS MATERIAL AS PER DIRECTION OF ENGINEER-IN-CHARGE AS PER DRAWING AND TECHNICAL SPECIFICATIONS CLAUSE 305.1 OFMORD SP
-
-
-
... More
11KV DOUBLE POLE(12.533X3)
37.6
-
-
... More
PROVIDING AND LAYING IN POSITION CEMENT CONCRETE OF SPECIFIED GRADE EXCLUDING THE COST OF CENTERING AND SHUTTERING - ALL WORKS UPTO PLINTH LEVEL (I) 1:4:8 (1 - CEMENT;4 - COARSE SAND; 8 - GRADED STONE AGGREGATE 40MM NOMINAL SIZE).( FOUNDATION
-
-
-
... More
11KV DOUBLE POLE(3.03X3)
9.09
-
-
... More
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cem ent concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling le
-
-
-
... More
11KV DOUBLE POLE(35.55X3)
106.65
-
-
... More
CEMENT PLASTER WORK
-
-
-
... More
11KV DOUBLE POLE(0.6667X3)
2
-
-
... More
H.P stone filling in back of walls including cost of all materials, royality,T& P etc. Complete
-
-
-
... More
11KV DOUBLE POLE(8.927X3)
26.78
-
-
... More
Back Cartage of other material by road transport by road transport fromwork side to ESSC Pithoragarh approx distance 71-100 Km including loading & unloading and stracking both ends.
-
-
-
... More
Small material
7.6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements