Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date4 Sep 2024
Closing DateCancelled
Tender Amount₹ 1,85,29,000
Costs
EMD
₹ 3,71,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Replacement Of Acsr Conductor Of Lt Line By Ab Cable In Different Villages And Locations Under 33 11 Kv Ss Srinagar Edsd Srinagar Under Edd Srinagar On Semi Turnkey Basis
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_75336_1Tender No
E-Tender no.34/EDC(s)/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
3 Phase LT Distribution Box With inbuilt Pannal lock, Al Bus Bar Sz 25x6mm Al Bus Bar N Sz 40x6 mm
548
-
-
MS Half Clamp for LT Distribution Boxes for ST Pole SP- 21 of Size 35x6 sqmm duly red oxide painted with suitable sz Nut and Bolts
943
-
-
Lug size 16 Sq mm
790
-
-
Lug size 50 Sq mm
2192
-
-
Insulated Piercing connector size 70-70/35-35 sqmm for line to line tapping
1734
-
-
Insulated Piercing connector size 70/35 sqmm to 16/50 sqmm for energising disribution box
2039
-
-
Dead End Clamp With I Hook
900
-
-
Suspension Clamp With I Hook
1380
-
-
Holding clamp with suitable Sz Bolt & Nut for J-hook
2280
-
-
Head shink type end suitable for LT ABC
1734
-
-
1x16 sq mm XLPE insulated Al. Cable for energising the distribution boxes
1185
-
-
1x35 sq mm XLPE insulated Al. Cable for energising the distribution boxes
3288
-
-
LT AB Cable 3x70+1x50 Sqr. Mm
7
-
-
LT AB Cable 3x35+1x25 Sqr. Mm
43
-
-
LT AB Cable 1x35+1x25 Sqr. Mm
10
-
-
Labour
-
-
-
Safe Cartage of SP-21 pole from Store Central Dehradun/Rishikesh to Work Site with Stacking site in 1Km Distance Including Loading & unloading (distance 150-200 Km.)
-
-
-
ST Pole SP-21 (Hot Dip Galvanised)
70
-
-
Head Load Cartage of ST Pole SP-21 From Road Site to work site. (Avg distance approx 0-1 km)
-
-
-
ST Pole SP-21 (Hot Dip Galvanised)
70
-
-
Cartage of small Line material from Store Central Dehradun/Rishikesh to Work Site with Stacking site in 1 Km Distance Including Loading & unloading (Approx distance 150-200 Km)
159.89
-
-
Head Load Cartage of Small Line material from road site to work site distance (Avg distance approx 0-1 Km)
159.89
-
-
Head Load Cartage of following cables from road site to work site distance (Avg distance approx 1-3 Km)
-
-
-
LT AB Cable 3x70+1x50 Sqr. Mm
7
-
-
LT AB Cable 3x35+1x25 Sqr. Mm
43
-
-
LT AB Cable 1x35+1x25 Sqr. Mm
10
-
-
Erection charge of ST Pole SP-21 in long span as per UPCL norms
-
-
-
Exacavation Pit for Pole of sz 0.9x0.6*1/6 of length of support
53.55
-
-
Erection ST Pole SP-21 (Hot dip galvanized)
70
-
-
Grouting of Poles 0.45x0.45x1/9 of full length of support
13.39
-
-
Fixing Charges of following stay
-
-
-
Exacavation Pit for stay of sz 0.6x0.6x1.2m
25.92
-
-
Fixing and erection of LT Stay Set Complete
60
-
-
Grouting of Stay set 0.6x0.6x0.3m
6.48
-
-
Removing & Reconnection of Single phase/Three phase LT Consumer Service Connection
1500
-
-
Dismantling of Old ACSR weasel Conductor from existing LT line including Re Rolling cartage from worksite to JE Store after Head Load cartage from different site.
-
-
-
LT line 3 Phase 4 Wire
20
-
-
LT line 2 Phase 3 Wire
25.4
-
-
LT line 1 Phase 2 Wire.
17
-
-
Laying stringing and sagging of AB cable including fixing of piercing Connector, dead end clamp with I hook, suspension clamps with I hook in all complete work.
-
-
-
LT AB Cable 3x70+1x50 Sqr. Mm
7
-
-
LT AB Cable 3x35+1x25 Sqr. Mm
43
-
-
LT AB Cable 1x35+1x25 Sqr. Mm
10
-
-
LT AB Cable 3x120+1x95+1x16 Sq.mm.
2.1
-
-
LT AB Cable 3x95+1x70 Sq.mm
1.95
-
-
Laying and fixing of 1x16/35 sq mm XLPE insulated Al. Cable for energising the distribution boxes
4473
-
-
Installation of LT Distribution Box complete work 3 phase
548
-
-
Installation of LT Distribution Box complete work 1 phase
395
-
-
Fixing of Al. Lugs
2982
-
-
Fixing of Holding clamp and stay clamp with Nut & Bolt
2340
-
-
Looping chopping of tree Braches
8
-
-
Straightening of Tilted Pole
15
-
-
Head load cartage of dismantled old ACSR Weasel Conductor from work site to road side
32.59
-
-
Back cartage of dismantled old ACSR Weasel Conductor from JE Store to Rishikesh store
32.59
-
-
Fixing of Aluminium Lugs
-
-
-