Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date27 Jul 2024
Closing Date13 Aug 2024
Tender AmountRefer Documents
Costs
EMD
₹ 75,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Electrification Of Kasturi Vatika, Phase-5
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL3_73988_1Bid Award Id
ViewTender No
EDC(USN)03/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General instruction for bidder
BOQ Items
Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel ,bracing and spec ial type bracket etc. as per RESPO schedule and local approced drawing.
550
-
-
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bott om including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
11.66
-
-
Fixing,tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in LT line.
18
-
-
Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block includ ing cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
1.94
-
-
Charges of Excavation of Earth for Pole Pit size 0.9x0.6x1/6 of pole length for erection of ST SP-33 and SP-55 Pole (94 Nos.) in all type of soil as per direction of Engineer in charge.
85.85
-
-
Erection of SP-33 single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps a s per RESPO manual.
80
-
-
Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps a s per RESPO manual.
6
-
-
Erection of Sp-55 double support pole in proper level and alignment along with fixing of all accessories like top channel,X bracings ,& clamps as per RESPO manual.
4
-
-
Muffing of poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm heigh t from ground level including cost of cement,stone and sand etc.
94
-
-
Charges of painting of SP-33 poles after removing of Rust by embry paper 1 coat of primer & 2 coat of al. paint as per direction of Engineer in charge.
80
-
-
Charges of painting of SP-55 poles after removing of Rust by embry paper 1 coat of primer & 2 coat of al. paint as per direction of Engineer in charge.
14
-
-
Excavation of earth of size 2.1x2.1x1.2 meter for DTR Plinth.
21.17
-
-
Brick work in 1:4 ratio for DTR Plinth.
21.17
-
-
RCC Work of 1:2:4 ratio 15 cm thickness of DTR Plinth.
2.68
-
-
Cement Plaster on side walls in 1:4 ratio on DTR Plinth.
57.96
-
-
Erection, providing and fixing of wire mesh of size 50x35 mm around plinth and toe wall duly welded with frame of M.S angle iron 35 x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter ) with the height of 0.5 meter above the plinth and 2 meter above the toe wall with 1 No. gate and locking arrangment in the toe wall size including grouting of 6 Nos. legs in the ratio in block of size 0.25x0.25x0.45 meter including gravlling of shingle of size 20 to 40 mm and complete painting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material).
48
-
-
Installation / mounting of new 400 KVA/500 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all conn ections of Ht and LT side and its complete commissioning.
4
-
-
Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Dog as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and pro file and sagging chart.
0.3
-
-
Guarding of LT/11 KV Line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guar ding channel/ angle as per RESSPO manual.
7
-
-
Cartage of ST pole SP-33 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km)
80
-
-
Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km)
14
-
-
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km)
35
-
-
Cartage of the 400/500 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21 -50 Km)
4
-
-
Headload cartage of SP-33 Pole from road to site(distance 1-3 Km)
80
-
-
Erection of LT ACB 800 A CT including microprocessor release IPR (3 pole with NCT as per IS 13947-2 & IEC 69047-2 ) with panel (IP 5 4 protection level) and mounting structure including CC works (0.3 mtr. x0.3 mtr. x0.75 mtr. x4 no.) as per UPCL specification.
4
-
-
Laying,Sagging & binding of AB cable of size 3x120+1x95+1x16 sqmm.(Only for cable, additional provisions to be made for matching accessories installation, case of any network modification i.e additionalpole etc. and for actual connection,disonnection as per site condition.
5900
-
-
Charges of Installation & Fixing of SMC three phase L.T.Distribution Box with inbuilt pannel lock, AI bus bar RYB 25x6 mm AI bus bar size including all complete work as per drawing, upcl specification and direction of Engineer-In-Charge.
180
-
-
Annexure-B (SUPPLY ITEMS)
-
-
-
Supply of MS Nut & Bolt off Size
35
-
-
Supply of Stay clamp for PCC Pole with N/B.
18
-
-
Supply of Suspension Clamp with Eye Hook.
180
-
-
Supply of MS Clamp with N&B for Distribution Box.
360
-
-
Supply of MS Clamp for Dead End Clamp with N&B
30
-
-
Supply of Dead End Clamp with I Hook
30
-
-
Supply of Insulated PRC (IPC 95-95 SQ mm)
20
-
-
Supply of LT BARE N. CONNECTOR PG CLAMP 95-25mm²
180
-
-
Supply of IPC for 120sq. mm to 120 sq mm
60
-
-
Supply of MS Clamp with N&B for Suspension Clamp
180
-
-
Supply of LT Bare N Con.PG Clamp For L-L 95-95sqmm
20
-
-
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120sq.mm to 35sq.mm jumpering for Line to DB taping (Tyco/RPG/3M. make) as per UPCL Specification.
540
-
-
Supply of LT XLPE Cable 1x35 sqmm
960
-
-
Supply of LT ACB outdoor Panel 800A with Metering CT & Box
4
-
-
Supply of SMC Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer (Sintex make or other ISI mark reputed company ) with Panel Lock with key) (As per drawing attached)
180
-
-
Supply of AL CRIMPING TYPE LUGS 630 Sq.mm
16
-
-
Supply of AL CRIMPING TYPE LUGS 35 Sq.mm
720
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements