Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Jan 2022
Closing Date14 Mar 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of Electricity Lines For Linking 12 Nos. Solar Power Plants With Grid

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 101-150 Km SP-21

6

-

730

... More
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 0-20 Km Small Material

9.71

-

390

... More
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 21-50 Km Small Material

16.01

-

390

... More
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 51-70 Km Small Material

5.69

-

450

... More
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 101-150 Km Small Material

2.84

-

575

... More
Head load cartage of pole & material from road site to work site distance aprox 0-1 Km SP-21

36

-

425

... More
Head load cartage of pole & material from road site to work site distance aprox 1-3 Km SP-21

14

-

750

... More
Head load cartage of pole & material from road site to work site distance aprox 4-6 Km SP-21

6

-

750

... More
Head load cartage of pole & material from road site to work site distance aprox 0-1 Km small material

23.81

-

350

... More
Head load cartage of pole & material from road site to work site distance aprox 3 Km small material

6.86

-

650

... More
Head load cartage of pole & material from road site to work site distance aprox 6 Km small material

3.58

-

650

... More
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole

42.87

-

250

... More
Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr

21.62

-

250

... More
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21.

56

-

550

... More
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 21 Pole

10.71

-

4800

... More
Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc.

56

-

564

... More
Fixing, tightening and nozzaling of stay with pole as per RESPO

50

-

450

... More
Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3

5.27

-

4800

... More
Errection of Earthing of pole of GI no 6 SWG with Pole & Earth Rod and nuts & Bolts.etc Complete as per specification.

26

-

600

... More
Laying, Sagging & Stringing of LT Line with AB Cable as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 3 phase Ab cable

0.31

-

15500

... More
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 3 phase 4 wire

1.65

-

15500

... More
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing . (Conversion of 1 phase to 3phase)

1.67

-

7700

... More
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing . (Conversion of 2 phase to 3phase)

0.08

-

5000

... More
Route clearance by cutting of tree brances/proning, loping and chopping of tree for LT line

1.71

-

1100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.