Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Jan 2022
Closing Date14 Mar 2022
Tender AmountRefer Documents
Costs
EMD
₹ 14,200Document Cost
₹ 295Tender Fee
Refer Documents
Summary
Construction Of Electricity Lines For Linking 12 Nos. Solar Power Plants With Grid
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UPCL9_40396_2Bid Award Id
ViewTender No
88/2021-22/EDD(A)Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 101-150 Km SP-21
6
-
730
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 0-20 Km Small Material
9.71
-
390
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 21-50 Km Small Material
16.01
-
390
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 51-70 Km Small Material
5.69
-
450
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 101-150 Km Small Material
2.84
-
575
Head load cartage of pole & material from road site to work site distance aprox 0-1 Km SP-21
36
-
425
Head load cartage of pole & material from road site to work site distance aprox 1-3 Km SP-21
14
-
750
Head load cartage of pole & material from road site to work site distance aprox 4-6 Km SP-21
6
-
750
Head load cartage of pole & material from road site to work site distance aprox 0-1 Km small material
23.81
-
350
Head load cartage of pole & material from road site to work site distance aprox 3 Km small material
6.86
-
650
Head load cartage of pole & material from road site to work site distance aprox 6 Km small material
3.58
-
650
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole
42.87
-
250
Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr
21.62
-
250
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21.
56
-
550
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 21 Pole
10.71
-
4800
Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc.
56
-
564
Fixing, tightening and nozzaling of stay with pole as per RESPO
50
-
450
Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3
5.27
-
4800
Errection of Earthing of pole of GI no 6 SWG with Pole & Earth Rod and nuts & Bolts.etc Complete as per specification.
26
-
600
Laying, Sagging & Stringing of LT Line with AB Cable as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 3 phase Ab cable
0.31
-
15500
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 3 phase 4 wire
1.65
-
15500
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing . (Conversion of 1 phase to 3phase)
1.67
-
7700
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing . (Conversion of 2 phase to 3phase)
0.08
-
5000
Route clearance by cutting of tree brances/proning, loping and chopping of tree for LT line
1.71
-
1100
Evaluation Notes How It Works ?