Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date23 Sep 2024
Closing Date8 Oct 2024
Tender Amount₹ 12,46,000
Costs
EMD
₹ 38,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
07/2024-25/edd(kh) Replacement Of Old Rusted Bare Conductor By Ab Cable And Installation Of Dtr At Lohiyahead Colony
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL3_76183_1Tender No
07/2024-25/EDD(KH)Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dead End Clamp with I Hook AB Cable PCC
28
-
-
Holding Clamp for SP-55 with N/B
30
-
-
PG Clamp 95-25 sq.mm.
80
-
-
PG Clamp 95-95 Sq.mm.
36
-
-
Top Channel Clamp with N&B.
64
-
-
Stay Clamp with N&B PCC pole 8.5 Mtr.
12
-
-
Earth wire clamp for PCC Pole with N/B.
64
-
-
Earth wire clamp for SP-55 with N/B.
30
-
-
Susmension Clampwith Eye Hook ABC PCC.
162
-
-
Piercing Connector 120-25 sq.mm.
320
-
-
Insulation piercing connector 120-50 Sq.mm.
108
-
-
Stay Clamp for SP-55 with Nut & Bolt.
10
-
-
LT Distribution box 03 Phase.
80
-
-
Aluminium Lugs O type size 120mm
24
-
-
GI Earthing Strip 35x3 mm.
95
-
-
Lugs O type.
320
-
-
ANNEXURE -B (Following work as per UPCL norms……………….
-
-
-
Fabrication of steel.
2260
-
-
Excavation of pit for pole.
65.71
-
-
Erection of single pcc pole.
27
-
-
Erection of Single SP-55 pole
28
-
-
Erection of PCC double pole
5
-
-
Grouting of pole
6.92
-
-
Muffing of pole
28
-
-
Dismantling of LT line 03 Phase 04 Wire (weasel).
2.1
-
-
Installation of 100 KV DTR on Pole structure.
4
-
-
Installation of 63 KVA DTR on ple struccture.
1
-
-
Fixing of TPMO.
5
-
-
Fixing of Lighting arrestor.
5
-
-
Laying of 3P 4W LT line (Weasel).
2.3
-
-
Cartage of PCC pole, 51-70 Km.
37
-
-
Cartage of SP-55 Pole, 51-70 Km.
28
-
-
Cartage of Petty material, 51-70 Km.
85.5
-
-
Cartage of 63 KVA DTR, 51-70 Km.
1
-
-
Cartage of 100 KVA DTR, 51-70 Km.
4
-
-
Head load cartage of PCC pole 0-1 Km.
37
-
-
Head Load cartage of SP-55 Pole, 0-01 Km.
28
-
-
Excavation of earth for structure erection.
56
-
-
Erection & laying LT arm cable 3.5x120.
440
-
-
Supply & Fixing earth wire clamp.
22
-
-
Laying / erection & comm. LT AB 3x120+95Sq..
5830
-
-
Looping and Chopping of tree branches.
0.6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements