Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Electrical Cables And Wires
Electrical and Electronics
Electrical Works
Eprocure
Opening Date28 Aug 2024
Closing Date9 Sep 2024
Tender Amount₹ 1,30,67,000 
Notes
Download

Costs

Summary

Replacement Of Bare Conductor Lt Line By Aerial Bunch Cable On 11 Kv Sidhkhal Feeder At Various Villages Under Edd Nainidanda On Semi-turnkey Basis

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm

33

-

-

... More
1 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm

336

-

-

... More
Insulated piercing connector size 70-70/35-35 sqmm for line to line tapping

1350

-

-

... More
Insulated piercing connector size 70/35 sqmm to 25 sqmm for energising disribution box

435

-

-

... More
Dead End Clamp With I Hook.(Insulated)

324

-

-

... More
Suspension Clamp With I Hook.(Insulated)

810

-

-

... More
LT Wire Neutral Connector PG Clamp 50/25-25sqmm single bolt as per UPCL specificationfor energising distribution box

369

-

-

... More
LT Wire Neutral Connector PG Clamp 50-50/25-25sqmm single bolt as per UPCL specification for line to line tapping

949

-

-

... More
Head shink type end caps suitable for LT ABC

350

-

-

... More
Lug size 16 Sqr Mm

672

-

-

... More
Lug size 50 Sqr Mm

135

-

-

... More
1x16 sq mm XLPE insulated Al. Cable for energising the distribution boxes

1344

-

-

... More
1x50 sq mm XLPE insulated Al. Cable for energising the distribution boxes

264

-

-

... More
LT AB Cable 3x35+1x25 Sqr mm

50.1

-

-

... More
Holding clamp for J-hook

1350

-

-

... More
Mid span Joint

250

-

-

... More
Various type Nut and Bolt.

550

-

-

... More
Labour

-

-

-

... More
Cartage of ST Pole SP-21 pole from Store Centre Kotdwar/ Dehradun/ Risikesh to Work Site with Stacking site in 1Km Distance Including Loading & unloading (distance 5kms-275 kms)

-

-

-

... More
ST Pole SP-21

36

-

-

... More
Head Load Cartage of ST Pole SP-21 From Road Site to work site distance approx 3.0 km By Man Power

-

-

-

... More
ST Pole SP-21

36

-

-

... More
Cartage of small Line material from Store Centre Kotdwar Dehradun/ Risikesh to road Side Including loading & unloading (distance 5kms-275 kms)

27

-

-

... More
Head Load Cartage of Road Site to work site distance approx 3.0 km By Man Power

-

-

-

... More
LT AB Cable 3x35+1x25 Sqr Mm

50.1

-

-

... More
Erection charge of ST Pole SP-21/10 pole in long span as per UPCL norms

-

-

-

... More
ST Pole SP-21

36

-

-

... More
Fixing and Grouting of stay Complete Work

36

-

-

... More
Removing & Reconnection of Single phase/Three phase LT Consumer Service Connection

756

-

-

... More
Painting of poles on Top Portion

-

-

-

... More
ST Pole SP-21

325

-

-

... More
Dismantling of Old ACSR weasel Conductor from existing LT line including Re Rolling cartage from worksite to JE Store after Head Load cartage from different site.

-

-

-

... More
LT line 3 Phase 4 Wire

4

-

-

... More
LT line 2 Phase 3 Wire

8

-

-

... More
LT line 1 Phase 2 Wire.

37

-

-

... More
Head load cartage of dismantled old ACSR Weasel Conductor from work site to road side

102.62

-

-

... More
Back cartage of dismantled old ACSR Weasel Conductor from JE Store.

102.62

-

-

... More
Laying stringing and sagging of AB cable including fixing of piercing Connector, dead end clamp with I hook, suspension clamps with I hook in all complete work.

-

-

-

... More
LT AB Cable 3x35+1x25 Sqr Mm

50.1

-

-

... More
Laying and fixing of 1x16/50 sq mm XLPE insulated Al. Cable for energising the distribution boxes

1608

-

-

... More
Installation of LT Distribution Box complete work 3 phase

33

-

-

... More
Installation of LT Distribution Box complete work 1 phase

336

-

-

... More
Lopping chopping of tree Branches

29

-

-

... More
Fixing of Holding clamp and stay clamp

1386

-

-

... More
Fixing of Nuts and Bolts

550

-

-

... More
Straightening of tilted pole

48

-

-

... More
Fixing of Al. Lugs

807

-

-

... More
Fixing of Aluminium Lugs

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.