Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Paints and Enamels
Electrical and Electronics
Eprocure
Opening Date21 Nov 2022
Closing Date6 Dec 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Overhauling And Repairing, Painting Of Power T/f

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cartage of 33 KV Outdoor CT Unit Store Center ot Work Site.

7

-

-

... More
Cartage of CT/PT Combined Unit Store Center ot Work Site.

1

-

-

... More
Manual Shifting /Pulling of 33 KV CT PT Combined Unit off Sizes from Existing site to plinth/Nearby place distance uoto 200 Mtr.

1

-

-

... More
(a) Dismentling of all accessories of T/F from top plate including disconnection of HT/LT side cable, bushing connections etc. Taking out of top plate and disconnection of bushings, bushing rod & taking out of the same from T/F (b) Re-assemble of all dismantiling part, bushing rod its connection after tightening of all nuts and bolts, top plate will be related with all accessories and property fitting on its location.(c) Supply & Replacement of Neoprene rubber gaskets of top plates, coilling fins. Buchholz relay, conservator tanks etc. for prevention of oil leakage.

7

-

-

... More
Centrifuging of T/F oil including draining out of old T/F oil & Top up after recleaning & centrifuging of oil with proper BD value of 8 MVA T/F (Approx oil capacity 3600 litre in each in each T/F) & for 5 MVA T/F (Approx oil capacity2805 litre)

27350

-

-

... More
Supply of 11 KV Bushing & Bushing rod.

5

-

-

... More
Supply of 33 KV Bushing & Bushing rod.

2

-

-

... More
Replacement & Commisioning of 11 KV Bushing & Bushing rod.

5

-

-

... More
Replacement & Commisioning of 33 KV Bushing & Bushing rod.

2

-

-

... More
Painting of T/F after clearing and removel of grease/oil, oil paint from surface of T/F with 1 coat of primer & 2 coats of first grade gray enamel paint.

5

-

-

... More
Painting of T/F after clearing and removel of grease/oil, oil paint from surface of T/F with 1 coat of primer & 2 coats of first grade gray enamel paint.

2

-

-

... More
Supply of oil temperature indicator (OTI) with 3 meter capilary and atleast +-5% Accuracy of Meter.

8

-

-

... More
Supply of winding temperature indicator (WTI) with 3 meter capilary and atleast +-5% Accuracy of Meter.

8

-

-

... More
Installation and commissioning of oil temperature indicator (OTI) with 3 meter capilary and atleast +-5% Accuracy of Meter including complete wiring & Connections to the control panel.

8

-

-

... More
Installation and commissioning of winding temperature indicator (WTI) with 3 meter capilary and atleast +-5% Accuracy of Meter including complete wiring & Connections to the control panel.

8

-

-

... More
Supply and fixing of WTI,OTI and Buccholz Indicator Board.

7

-

-

... More
Cleaning of Carbonized contact and minor repairing of Buchholz Relay

3

-

-

... More
Cleaning of Carbonized contact and minor repairing of Buchholz Relay

4

-

-

... More
Fabrication of MS Channel Angle Iron after cutting in Required sizes with Drilling of Holes upto good fnish for Top Channel,Bracing and Special Type Bracket etc.as per RESPO Schedule and Local Aproved Drawing.

125

-

-

... More
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing and ramming of bottom including getting out the excavated soil and disposal of surplus excavated as directed complete work.

0.65

-

-

... More
Erection of MS Channel in Proper Level and Alignment along with fixing of all Accessories,like Top Angels to make structure for Mounting 33 KV Outdoor CT's as per RESPO Construction Manual.

2

-

-

... More
Grouting of Channel in size 0.6x0.6x1 M in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size :8 course sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual.

0.86

-

-

... More
Chemical Earthing of the structure for Mounting of 33 KV CT.

2

-

-

... More
Painting of Structure in yard after cleaning and removal of old paint from in with 1 coat of primer and 2 coats of silver paint. With Yard + Fancing

6

-

-

... More
Installation and Commissing of 33 KV Current Transformer.

3

-

-

... More
Replacement and Commissioning of 33 KV Potential Transformer.

1

-

-

... More
Complete Overhauling and repair of 33 KV VCB(Make BHEL) and the control panel viz oprating mechanism system including closing spring tripping Main Charging Half (Top),Tripping Lever,Closing Lever Etc.with complete Dismentling of spring charging system & device charging gear, holding latches driving latches duction gear device link rachests plungers jack bush assembly remote and local Operation of 33 KV Breckers,WTI/OTI and Bhuchholz Relay alarm and Trip System,CT/PT Connection for Metering and protection etccomplete job i/c Reffiling of SF6 Gas Making complete wiring and Replacement of Burnt Parts.

5

-

-

... More
Complete Overhauling and repair of 33 KV VCB(Make BHEL) and the control panel viz oprating mechanism system including closing spring tripping Main Charging Half (Top),Tripping Lever,Closing Lever Etc.with complete Dismentling of spring charging system & device charging gear, holding latches driving latches duction gear device link rachests plungers jack bush assembly remote and local Operation of 33 KV Breckers,WTI/OTI and Bhuchholz Relay alarm and Trip System,CT/PT Connection for Metering and protection etccomplete job i/c Reffiling of SF6 Gas Making complete wiring and Replacement of Burnt Parts.

3

-

-

... More
Supply and Fixing of LV Site 'L' Contactor

21

-

-

... More
Laying of Control cable in trench from CT,PT,WTI,OTI,Bhuchholz,Breakers etc.to control panel and making all connections.

700

-

-

... More
Supply and Fixing of Copper Belt for Earthing of Transformer Nuetral Point.

1

-

-

... More
Complete overhauling and repair of 33 kv control panel viz operating mechanism system including remote and local operation of 33 KV breakers,wti/oti and buchholz relay alarm and trip system, ct/pt connection for metering and protection etc complete job including making complete wiring and replacement of burnt parts..

3

-

-

... More
Gi plate earthing (delta star) of the control panel

2

-

-

... More
Replacement and commissing of 33 KV current transformer including making all connections

4

-

-

... More
Replacement and commissioning of 33KV CT/PT cobined unit including making all connections

1

-

-

... More
Repairing and overhauling of 33 KV Isolator in Switchyard at 33 /11 KV S/S Kunwarpur Golapar.

16

-

-

... More
Replacement and Commissing of Lightening Arrestor.

6

-

-

... More
Complete Vagitation Clearence On Switchyard Including Wire mesh fencing.

3

-

-

... More
Painting of Wire Mesh Fencing

3

-

-

... More
Supply and Erection of Breather Assembly.

7

-

-

... More
Back cartage of old demeged CTs to store centre haldwani including loading unloading

1

-

-

... More
Back cartage of old demeged CT/PT combine unit to store centre haldwani including loading unloading

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.