Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date22 Apr 2024
Closing Date2 May 2024
Tender AmountRefer Documents
Costs
EMD
₹ 75,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_71238_2Bid Award Id
ViewTender No
61/EDCT/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
STAY CLAMP FOR SP-23 WITH NUT & BOLT
40
-
-
EARTH WIRE CLAMP FOR SP-23 WITH
N/B
60
-
-
PP & CLAMP WITH N&B ST POLE SP-23
45
-
-
SUSP.CLAMP WITH EYE HOOK ABC FOR SP-21
210
-
-
DIST. BOX WITH N&B ABCABLE 3PH-8WAY
27
-
-
Piercing Connector 35 Sq.mm-35Sq.mm
75
-
-
LT XLPE Cable 1x35 sqmm
280
-
-
LT AB Cable 3x35+1x25 sqmm
6300
-
-
Aluminium Lugs 0 type 25 mm (4x25)
108
-
-
LABOUR (SERVICES)
-
-
-
CONSTRUCTION OF RETURNING WALL & PLINTH
12
-
-
FABRICATION OF STEEL
930
-
-
EXCAVATION OF PIT FOR STAY SET
17.28
-
-
ERECTION OF LT STAY SET
40
-
-
GROUTING OF STAY SET
4.32
-
-
EXCAVATION OF PIT FOR POLE
58.63
-
-
ERECTION OF SINGLE SP-21 POLE
40
-
-
ERECTION OF SINGLE SP-23 POLE
13
-
-
ERECTION OF SP-23 DOUBLE POLE
12
-
-
GROUTING OF POLE
14.7
-
-
MUFFING OF POLE
77
-
-
DISMANTLING OF 16 KVA DTR
7
-
-
INST. OF 25 KVA DTR ON POLE STRUCTURE
7
-
-
FIXING OF FUSE SET
7
-
-
FIXING OF LT FUSE SET
7
-
-
LAYING OF RABBIT CONDUCTOR IN HT LINE
5.4
-
-
LOPPING & CHOPPINGOF TREE BRANCHES
5
-
-
CARTAGE SP-21/23 POLE, 100-150KM
77
-
-
CARTAGE OF PETTY MATERIAL,100-150KM
50.66
-
-
CARTAGE OF 16/25 KVA DTR, 100-150KM
14
-
-
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
77
-
-
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
50.66
-
-
HEADLOAD CARTAGE OF 16 KVA DTR(1-3 KM)
7
-
-
HEADLOAD CARTAGE OF 25 KVA DTR(1-3 KM)
7
-
-
LAYING OF LT AB CABLE 3X35+1X25 SQMM
6300
-
-
Straight of Tilted Poles of STP SP 10
40
-
-
Installation of LT DB 3 Ph for LT AB Cab
27
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements