Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date24 Dec 2024
Closing Date9 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 3,89,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_79126_1Tender No
34/EDC(K)/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
11 KV Tension Clamp with bail & IPC
480
-
-
... More
11 KV Cable Ties for Pin Insulator.
450
-
-
... More
11 KV IPC for covered to covered connections
270
-
-
... More
11 KV IPC for covered to Bare connections
60
-
-
... More
Cable termination Kit
75
-
-
... More
11 KV Mid Span Jointing Kit
30
-
-
... More
IPC with Aluminium Bail for earthing
85
-
-
... More
PP and Clamp for SP-33with N&B
30
-
-
... More
Stay Clamp for SP-33/23 with N&B
65
-
-
... More
PP and Clamp for SP-55 with N&B
30
-
-
... More
Stay Clamp for SP-55 with N&B
25
-
-
... More
Bracing Clamp Top for SP 33 with N&B
10
-
-
... More
Bracing Clamp Bottom For SP 33 With N&B
10
-
-
... More
LABOUR PORTION
-
-
-
... More
Cartage of following material from ESC to Road site of work dist. Apprx. 160
km Loading/unloading comp.
-
-
-
... More
(a) ST pole SP-55/33
50
-
-
... More
(b) Small Material
42
-
-
... More
Head load cartage of following material from road site to work site dist. Apprx. 0-
2 km Loading/unloading comp.
-
-
-
... More
(a) ST pole SP-55/33
50
-
-
... More
(b) Small Material
42
-
-
... More
Fabrication of steel by cutting and drilling properly
1871
-
-
... More
Digging of pit for Pole as per upcl norms.(0.9*0.6*1/6 Pole Length)*Pole
36
-
-
... More
Erection of new 11 KV S/P Structure on SP-55 as per upcl norms
20
-
-
... More
Erection of new 11 KV D/P on SP-33 Structure as per upcl norms
10
-
-
... More
Grouting of Pole as per norms (0.45*0.45*1/9 of pole length)*Pole
11.03
-
-
... More
Digging of pit for stay as per upcl norms (0.6*0.6*1.20 Mtr)
95
-
-
... More
Grouting of Stay as per norms (0.6*0.6*0.3)*stay
10.26
-
-
... More
Erection of new 11 KV stay as per upcl norms
95
-
-
... More
Removing of old conductor with opening of existing jumpering and making of
bundle. Length of line 9.5 KM
28500
-
-
... More
Laying, spreading, stringing, sagging of 11 KV line of AAAC AL-59 , 70 sq mm Covered Conductor including proper sagging with binding and jumpering as per user manual and sagging comp. work done(Inclusive of cartage and head load cartage at work site).Rollers of the appropriate diameter and quantity have to to be provided for installation.The rollers shall have a smooth clean surface, no sharp edges and shall rotate easily.To prevent the covering from damage any abrasive contact with soil or stone is not permitted. Abrasive contact of the covering with branches or similar shall be avoided.Covered conductor shall be pulled by using appropriate pulling devices ensuring that the pulling force is distributed to the conductor.Recommendations given in EN-50397-3 should be followed for storage, transport and installation of covered conductor.
-
-
-
... More
11 KV AAAC AL-59 , 70 sq mm Covered Conductor (As per EN- 50397- 1:2006)
30.78
-
-
... More
Fixing of MVCC Accessories
-
-
-
... More
11 KV Tension Clamp with bail & IPC
420
-
-
... More
11 KV Cable Ties for Pin Insulator.
450
-
-
... More
11 KV IPC for covered to covered connections
360
-
-
... More
11 KV IPC for covered to Bare connections
60
-
-
... More
Cable termination Kit
75
-
-
... More
11 KV Mid Span Jointing Kit
30
-
-
... More
IPC with Aluminium Bail for earthing
85
-
-
... More
Erection of Earthing of supprots as per UPCL norms.
85
-
-
... More
Painting of Pole .
220
-
-
... More
Back cartage of dismantled material from work site to work road side.Average distance 2 Km
-
-
-
... More
(A) Line material
30
-
-
... More
Back cartage of dismantled material from work road side to Store centre Rishikesh.Average distance 160 Km
-
-
-
... More
(A) Line material
30
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%