Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date14 Oct 2024
Closing Date25 Oct 2024
Tender Amount₹ 97,48,000
Costs
EMD
₹ 1,95,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_77004_1Bid Award Id
ViewTender No
E-Tender no.60/EDC(s)/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
33 KV Tension Clamp with bail & IPC
80
-
-
33 KV Cable Ties for Pin Insulator.
626
-
-
33 KV IPC for covered to covered connections
40
-
-
33 KV IPC for covered to Bare connections
15
-
-
33 KV Mid Span Jointing Kit
8
-
-
IPC with Aluminium Bail for earthing
55
-
-
33 KV Disc insulator for AAAC Covered Conductor
40
-
-
33 KV Pin Insulator 120 KN
40
-
-
Bracing Clamp Top for SP 55 with N&B
18
-
-
Bracing Clamp Bottom For SP 55 With N&B
18
-
-
Labour
-
-
-
Cartage of following material from ESC to Road site of work dist. Apprx. 160 km Loading/unloading comp.
-
-
-
ST pole SP-55
5
-
-
Small Material
38.5
-
-
Head load cartage of following material from road site to work site dist. Apprx. 0-2 km Loading/unloading comp.
-
-
-
ST pole SP-55
5
-
-
Small Material
38.5
-
-
Fabrication of steel by cutting and drilling properly
756
-
-
Digging of pit for Pole as per upcl norms.(0.9*0.6*1/6 Pole Length)*Pole
1.98
-
-
Erection of new 33 KV D/P Structure as per upcl norms
9
-
-
Grouting of Pole as per norms (0.45*0.45*1/9 of pole length)*Pole
1
-
-
Digging of pit for stay as per upcl norms (0.6*0.6*1.20 Mtr)
54
-
-
Grouting of Stay as per norms (0.6*0.6*0.3)*stay
8.55
-
-
Fixing , tightening and Nozzeling of Stay With pole and Stay rod on required Tension as per per drawing
26
-
-
Removing of old conductor with opening of existing jumpering and making of bundle.
5000
-
-
Laying, spreading, stringing, sagging of 33 KV line in 3 Phase of the following wire as phase wire including proper sagging with binding and jumpering as per user manual and sagging comp. work done(Inclusive of cartage and head load cartage at work site).Rollers of the appropriate diameter and quantity have to to be provided for installation.The rollers shall have a smooth clean surface, no sharp edges and shall rotate easily.To prevent the covering from damage any abrasive contact with soil or stone is not permitted. Abrasive contact of the covering with branches or similar shall be avoided.Covered conductor shall be pulled by using appropriate pulling devices ensuring that the pulling force is distributed to the conductor.Recommendations given in EN-50397-3 should be followed for storage, transport and installation of covered conductor.
-
-
-
33 KV AAAC AL-59 , 160 sq mm Covered Conductor
6640
-
-
Excavation of earth and erection of 33 KV single support with CC Comp.
5
-
-
Fixing of MVCC Accessories
-
-
-
33 KV Tension Clamp with bail & IPC
80
-
-
33 KV Cable Ties for Pin Insulator.
626
-
-
33 KV IPC for covered to covered connections
40
-
-
33 KV IPC for covered to Bare connections
15
-
-
33 KV Mid Span Jointing Kit
8
-
-
IPC with Aluminium Bail for earthing
55
-
-
33 KV Disc insulator for AAAC Covered Conductor
40
-
-
33 KV Pin Insulator
40
-
-
Painting of Poles SP 55
5
-
-
Back cartage of dismantled material from work site to work road side.Average distance 2 Km
-
-
-
Line material
33.55
-
-
Back cartage of dismantled material from work road side to Store centre Rishikesh.Average distance 160 Km
-
-
-
Line material
33.55
-
-
Fixing of Aluminium Lugs
-
-
-