Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date5 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 81,86,288 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,64,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_70061_2Bid Award Id
ViewTender No
61/EDC(K)/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
MS ANGLE 65X65X6 mm
2250
-
-
... More
MS ANGLE 75X75X6 mm
560
-
-
... More
MS CHANNEL 100X50 mm
1720
-
-
... More
11 kV POLYMER DISC INSULATOR (B&S) TYPE
300
-
-
... More
11 kV POLYMER PIN INSULATOR WITH PIN
240
-
-
... More
DISC FIT. B&S TYPE DOG/RACOON 70 KN
300
-
-
... More
EARTHING ROD MS 20X2500mm
28
-
-
... More
GI WIRE 3.15 mm/10mm SWG
120
-
-
... More
GI WIRE 5mm/6 SWG
720
-
-
... More
STAY SET GI 16X1800mm
274
-
-
... More
STAY WIRE GI 7/3.15mm 7/10SWG
1370
-
-
... More
ACSR WEASEL
7828
-
-
... More
ACSR RABBIT
23484
-
-
... More
CABLE AL 3X120 SQ. mm XLPE 11 kV
158
-
-
... More
J/KIT FOR 3X120mm² 11kV XLPE CABLE(I/D)
3
-
-
... More
J/KIT FOR 3X120mm² 11kV XLPE CABLE (O/D)
3
-
-
... More
11 kV PRMC 100/5A
1
-
-
... More
ELECTRONIC STATIC TVM 11 kV RS-232 PORT
1
-
-
... More
GI EARTHING STRIP 35X6
80
-
-
... More
9 kV 5KA LIGHTNING ARRESTER (POLYMER)
12
-
-
... More
11 kV GANG OPERATING SWITCH
4
-
-
... More
MS Nut&Bolts 16x65 MM
20
-
-
... More
MS Nut&Bolts 180x16 MM
20
-
-
... More
Earth wire clamp with N&B
89
-
-
... More
Bracing clamp TOP SP-55 with N&B
32
-
-
... More
Bracing clamp for SP-23 bottom for TPMO
182
-
-
... More
Earth wire clamp for SP-55 with N&B
14
-
-
... More
PP & Clamp with N&B ST Pole SP-55
80
-
-
... More
Stay Clamp for SP-23 with N&B
337
-
-
... More
Stay clamp for SP-55 with N&B
48
-
-
... More
PG Clamp Rabbit to Rabbit
474
-
-
... More
PP & Clamp with N&B ST Pole SP-23
266
-
-
... More
Number Plate with Clamp
60
-
-
... More
Bracing Clamp Bottom with N&B SP-55
32
-
-
... More
Bracing Clamp Bottom for SP-23 with N&B
182
-
-
... More
Danger Board
60
-
-
... More
LABOUR PORTION
-
-
-
... More
4.1.8 (DSR Coad 2014)
30
-
-
... More
Special Earthing
5
-
-
... More
Erection of Earthing ROD
28
-
-
... More
Fabrication of Steel
4530
-
-
... More
Excavation of PIT for stay set
419
-
-
... More
Erection of 11KV Stay set
274
-
-
... More
Excavation of PIT for Pole
124
-
-
... More
Erection of Single SP-23 Pole
8
-
-
... More
Erection of Single SP-55 Pole
4
-
-
... More
Erection of SP-23 Double Pole
38
-
-
... More
Erection of SP-55 Double Piole
6
-
-
... More
Erection of SP-23 Four Pole
4
-
-
... More
Erection of SP-55 (11KV/33KV) Four Pole
2
-
-
... More
Grouting Of Pole
24.96
-
-
... More
Muffing of Pole
124
-
-
... More
Installation of HT PRMC
1
-
-
... More
Painting of SP-21/23 Pole
24
-
-
... More
Painting of SP-55 Pole
100
-
-
... More
Laying of U/G 11 KV cable in Trench
158
-
-
... More
RR Massonary work for DTR Plinth
30
-
-
... More
RCC Work of DTR Plinth
4.5
-
-
... More
Fixing of Fuse set
6
-
-
... More
Fixing of Lighting Arrestor
8
-
-
... More
Laying of Rabbit Conductor in HT Line
7.6
-
-
... More
Guarding of LT/11 KV Line
16
-
-
... More
Lopping & Chopping Tree Branches
7.6
-
-
... More
Making of Section Pole
50
-
-
... More
Fixing of 11 KV XLPE Jointing KIT
6
-
-
... More
Cartage SP-21/23Pole,150-200KM
100
-
-
... More
Cartage SP-55 Pole,150-200 KM
24
-
-
... More
Cartage of Petty Material, 150-200 KM
200
-
-
... More
Head Load cartage SP-21/23 Pole (1-3 KM)
100
-
-
... More
Head Load cartage SP--55 Pole (1-3 KM)
24
-
-
... More
Head Load cartage of Material (1-3KM)
200
-
-
... More
Excavation of Earth for structure erection
30
-
-
... More
Carage Of 11 KV PMRC
1
-
-
... More
Mannual shifting of 11 KV PRMC
1
-
-
... More
Grouting of stay set
29.59
-
-
... More
Installation of LT Distribution Box complete work
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements