Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date27 Aug 2024
Closing Date9 Sep 2024
Tender Amount₹ 1,95,37,346
Costs
EMD
₹ 3,91,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_74969_1Bid Award Id
ViewTender No
26/EDCC/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing 125 amp 35 KA MF four pole with adjustable micro processor relay with earth fault digitial module case circuit bracker for 63/25 kVa /TF with all assesries (Enclosure) make L&T, Indo Asian, Havell's, C&S)
169
-
-
... More
Al Lug 120 (214x12)
3036
-
-
... More
Al Lug 240 (6x12)
132
-
-
... More
MS Clamp for bottom side for ST Pole SP-23/21/33 for MCCB and 11 KV fuse set
428
-
-
... More
LT XLPE Cable size 1x120 sqmm (214x66 mtr) for 100/63/25 kva Trasnformers
16698
-
-
... More
LT XLPE Cable size 1x240 sqmm (6x64 mtr) for 250 kva Trasnformers
704
-
-
... More
Supply of GI Earthing Strip size 32x5
45
-
-
... More
Earthing Rod 20x2500 mm
253
-
-
... More
Labour
-
-
-
... More
Cartage and Head load Cartage of material ACB, LT Cable, and other including loading and unloading from Je Store to site (0-100 kms)
11
-
-
... More
Cartage of small line material from store centre Dehradun to roadsite including loading & unloading at both ends (0-100 kms)
68.14
-
-
... More
Cartage and Head load Cartage of material MCCB, LT Cable, and other including loading and unloading from Je Store to site (0-100 kms)
253
-
-
... More
Manual shifting of small line material from roadsite to worksite (0-1 kms)
68.14
-
-
... More
Installation of LT ACB Pannel Complete in all respect. i.e disconnection of existing cable from DTR Terminal and metering cubcial, fixing of new additional cable in ACB LT Distribution Board connecting DTR metering complete testing and commissioning of ACB connection using all lugs of proper size lugs will be provided by supplier as per required on site and narrated by Engineer in Charge of Work
11
-
-
... More
Installation of Digital moulded Case Breaker on the pole with fixing of 02 nos MS Angle with the help of MS Clamp in all respect i.e i.e disconnection of existing cable from DTR Terminal, fixing of new additional cable in MCCB connecting DTR complete testing and commissioning of MCCB connection using all lugs of proper size lugs/clamp as per required site and narrated by Engineer in Charge of Work
253
-
-
... More
Earthing and installation of complete chemical earthing and connection with equipment as per specifications
11
-
-
... More
Fixing of Moulded case circuit braker by earth road
253
-
-
... More
Laying and saging of LT XLPE Cable 1x120 sqmm
16698
-
-
... More
Laying and saging of LT XLPE Cable 1x 240 sqmm
704
-
-
... More
AMC in First Year after one year guarantee period on MCCB 3 % on MCCB cost
253
-
-
... More
AMC in 2nd year after one year guarantee period on MCCB 4 % on MCCB cost
253
-
-
... More
AMC in First Year after one year guarantee period on ACB 3 % on MCCB cost
11
-
-
... More
AMC in 2nd year after one year guarantee period on ACB 4 % on MCCB cost
11
-
-
... More
Fixing of Aluminium Lugs
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements