Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPCL9_53287_1Bid Award Id
ViewTender No
EDC(H)/51/2022-23Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
LT Bushing Complete rod (brass) for 250 KVA to 400 KVA
100
-
-
... More
LT Bushing Complete rod (brass) for 630 KVA
8
-
-
... More
T/F Breather Assembly (0.5 Kg Complete)
50
-
-
... More
T/F Breather Assembly (1 Kg Complete)
50
-
-
... More
L- Conntect copper metal (500 AMP)
150
-
-
... More
Cork Sheet 4'X4X6 mm
20
-
-
... More
Arcing Horn
400
-
-
... More
Labour Charge: Opening of HT/LT Connections Dismounting of T/F From S/S D/P/Plangth and shifting of T/Fs upto repairing site.
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
Opening of with top plate cover and conserver tank of T/F 11 KV bushing complete by opening nut and bolts/or cutting welding &safe stacking at work site
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Draining out of T/F Oil from the tank of T/F & collecting in drums including proper & safe stacking at work site including labour and T&P required
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Opening of LT bushing from inside and outside of T/F opening of clamps of core assembly and taking out the core /winding assembling out of T/F tank including proper and safe stacking at work site.
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Preparation of LV LEG COILS - All LV leg coils of the T/F will be prrepared by new DPCLT strip
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Making of HV LEG COILS - All HV coils of the T/F will be new DSC/SE winding wire of same size and same no to turns
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Repaing of HT connection leads by jointing with soldering etc. with providiong empire sleeve and proper taping encluding replacements of carbonised bushing and replacement of old packing with new rubbersied cork sheet pakcing work complete in all respect.
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Repairing of carbonised /burned LT side connecting strips by way of soldering /tightening with bolts and nut with providing empire sleeve and proper tappling of leads of all the three phase one Neutral of LT side alongwith replacement carbonised /damage bushing &replacement of old core winding assembling to remove mousture contents from core stamping including Labour and T&P required
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Providing skilled labour for tesing alongwith welding of Top covers plate/tightening of nuts&bolts of T/F (Weilding rods shall be arranged by the contractor)
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Repairng of T/F tank after removing sludege deposit from the bottom of the tank & cleaning of core/winding assembling with T/F oil complete work including labour & T&P required.
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Housing of core/winding assembling inside the T/F tank fixing of tighting clamp with core assembling making LT connectionn with LT bushing & necessary taping of leads etc, complete work including labour & T&P required.
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Providing of fixing on the top of the core channel, tape changer specification as per sample & connection with the coils.
-
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Placing of conservator tank with top plate cover of T/F KV bushing providing fresh rubberished core sheet packing & tighting with the help of nut & bolts & washer/ by way of weilding top plate with t/f tank encluding labour & T&P requried.
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Fitting and tapping up T/F oil in T/F tank properly & complete tesing of T/F by meegar rresult & open & short circuit test result
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Cleaning of breather assemply encluding replacement of old pacing & silica Zel with new silica zel encluding with albour & T&P required
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
... More
250 KVA
10
-
-
... More
400 KVA
6
-
-
... More
630 KVA
1
-
-
... More
Shifting of T/F from work to site to T/F double pole & Mounting of T/F on s/S double pole cleaning of terminal of LT cable removing of carbon by send pepring etc and providing new lugs of terminals fixing and making complete connection with the T/Fs
-
-
-
... More
25 KVA
3
-
-
... More
63 KVA
6
-
-
... More
100 KVA
12
-
-
Evaluation Notes How It Works ?