Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Eprocure
Opening Date8 Dec 2023
Closing Date4 Jan 2024
Tender Amount₹ 12,97,000
Costs
EMD
₹ 45,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPCL9_66211_1Bid Award Id
ViewTender No
25/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
STAY CLAMP FOR SP-23 DOUBLE END
8
-
-
... More
EARTH WIRE CLAMP FOR SP-23 WITH N&B
44
-
-
... More
E-CLAMP FOR 11KV
15
-
-
... More
TPMO LT DB HOLDING CLAMP FOR SP-23 WITH N&B
4
-
-
... More
BRACING CLAMP FOR SP-23 TOP FOR TPMO
35
-
-
... More
BRACING CLAMP FOR SP-23 BOTTOM FOR TPMO
27
-
-
... More
AL. CRIMPING TYPE LUGS 70SQ. MM.
36
-
-
... More
AL. CRIMPING TYPE LUGS 120SQ. MM.
9
-
-
... More
M.S. HOLDING CLAMPS
12
-
-
... More
P.G. CLAMP 70-70 SQMM.
48
-
-
... More
SHCAKLE INSULATOR CLAMP
74
-
-
... More
STAY INSULATOR
37
-
-
... More
EARTH WIRE CLAMP FOR SP-10 WITH N&B
35
-
-
... More
STAY CLAMP FOR SP-10/21 WITH N&B
53
-
-
... More
SHCAKLE INSULATOR
92
-
-
... More
PP & CLAMP WITH N&B ST POLE SP-23
104
-
-
... More
LABOUR :-
-
-
-
... More
CARTAGE OF SP-10 POLE 100-150 KM
35
-
-
... More
CARTAGE OF SP-21/23 POLE 71-100 KM
63
-
-
... More
CARTAGE OF PETTY MATERIAL 71-100 KM
56.47
-
-
... More
CARTAGE OF PETTY MATERIAL 100-150 KM
14.59
-
-
... More
HEAD LOAD CARTAGE OF SP-10 POLE (0-1 KM.)
12
-
-
... More
HEAD LOAD CARTAGE OF SP-10 POLE (1-3 KM.)
23
-
-
... More
HEAD LOAD CARTAGE OF SP-21/23 POLE (0-1 KM.)
33
-
-
... More
HEAD LOAD CARTAGE OF SP-21/23 POLE (1-3 KM.)
30
-
-
... More
HEAD LOAD CARTAGE OF PETTY MATERIAL (0-1 KM.)
29.54
-
-
... More
HEAD LOAD CARTAGE OF PETTY MATERIAL (1-3 KM.)
41.52
-
-
... More
EXCAVATION OF PIT FOR POLE FOR SP-10
25.14
-
-
... More
EXCAVATION OF PIT FOR POLE FOR SP-21/23
48.04
-
-
... More
ERECTION OF SINGLE SP-10 POLE
35
-
-
... More
ERECTION OF SINGLE SP-21/23 POLE
17
-
-
... More
ERECTION OF DP SP-21/23 POLE
23
-
-
... More
GROUTING OF POLES FOR SP-10
6.31
-
-
... More
GROUTING OF POLES FOR SP-21/23
11.98
-
-
... More
MUFFING OF POLES
98
-
-
... More
FABRICATION OF STEEL
1240
-
-
... More
EXCAVATION OF PIT FOR STAY SET
51.82
-
-
... More
ERECTION OF LT STAY SET
37
-
-
... More
ERECTION OF 11 KV STAY SET
96
-
-
... More
GROUTING OF STAY SET
14.37
-
-
... More
LAYING OF 1P2W LT LINE (WEASEL)
0.53
-
-
... More
LAYING OF 2P3W LT LINE (WEASEL)
1.35
-
-
... More
LAYING OF 3P4W LT LINE (RABBIT)
1.03
-
-
... More
LAYING OF WEASEL HT LINE
1.46
-
-
... More
PAINTING OF SP-10 POLE
35
-
-
... More
PAINTING OF SP-21/23 POLE
63
-
-
... More
ERECTION IF EARTHING ROD
22
-
-
... More
INST. OF DANGER BOARD/NUMBER PLATE
12
-
-
... More
CARTAGE OF 16/25 KVA DTR 71-100 KM
1
-
-
... More
CARTAGE OF 63 KVA DTR 71-100 KM
5
-
-
... More
CARTAGE OF 100 KVA DTR 71-100 KM
1
-
-
... More
CARTAGE OF PETTY MATERIAL 71-100 KM
9
-
-
... More
HEAD LOAD CARTAGE OF 25 KVA DT (0-1KM)
1
-
-
... More
HEAD LOAD CARTAGE OF 63 KVA DT (0-1KM)
3
-
-
... More
HEAD LOAD CARTAGE OF 63 KVA DT (1-3KM)
2
-
-
... More
HEAD LOAD CARTAGE OF 100 KVA DT (1-3KM)
1
-
-
... More
HEAD LOAD CARTAGE OF MATERIAL (0-1 KM)
3
-
-
... More
HEAD LOAD CARTAGE OF MATERIAL (1-3 KM)
6
-
-
... More
INST. OF 25 KVA DTR ON POLE STRUCTURE
1
-
-
... More
INST. OF 63 KVA DTR ON POLE STRUCTURE
5
-
-
... More
INST. OF 100 KVA DTR ON POLE STRUCTURE
1
-
-
... More
FABRICATION OF STEEL
497
-
-
... More
LAYING OF LT PVC CABLES (UPTO 150 SQMM)
120
-
-
... More
FIXING OF TPMO
7
-
-
... More
FIXING OF FUSE SET
7
-
-
... More
FIXING OF LIGHTING ARRESTOR
7
-
-
... More
CHEMICAL EARTHING
18
-
-
... More
GUARDING OF LT/11KV LINE
1
-
-
... More
T-OFF CONNECTION COMPLETE 11KV LINE
4
-
-
... More
CARTAGE SP-10 POLE 21-50 KM.
6
-
-
... More
CARTAGE OF PETTY MATERIAL 21-50 KM.
2.55
-
-