Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Eprocure
Opening Date8 Dec 2023
Closing Date4 Jan 2024
Tender Amount₹ 12,97,000
Costs
EMD
₹ 45,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPCL9_66211_1Bid Award Id
ViewTender No
25/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
STAY CLAMP FOR SP-23 DOUBLE END
8
-
-
EARTH WIRE CLAMP FOR SP-23 WITH N&B
44
-
-
E-CLAMP FOR 11KV
15
-
-
TPMO LT DB HOLDING CLAMP FOR SP-23 WITH N&B
4
-
-
BRACING CLAMP FOR SP-23 TOP FOR TPMO
35
-
-
BRACING CLAMP FOR SP-23 BOTTOM FOR TPMO
27
-
-
AL. CRIMPING TYPE LUGS 70SQ. MM.
36
-
-
AL. CRIMPING TYPE LUGS 120SQ. MM.
9
-
-
M.S. HOLDING CLAMPS
12
-
-
P.G. CLAMP 70-70 SQMM.
48
-
-
SHCAKLE INSULATOR CLAMP
74
-
-
STAY INSULATOR
37
-
-
EARTH WIRE CLAMP FOR SP-10 WITH N&B
35
-
-
STAY CLAMP FOR SP-10/21 WITH N&B
53
-
-
SHCAKLE INSULATOR
92
-
-
PP & CLAMP WITH N&B ST POLE SP-23
104
-
-
LABOUR :-
-
-
-
CARTAGE OF SP-10 POLE 100-150 KM
35
-
-
CARTAGE OF SP-21/23 POLE 71-100 KM
63
-
-
CARTAGE OF PETTY MATERIAL 71-100 KM
56.47
-
-
CARTAGE OF PETTY MATERIAL 100-150 KM
14.59
-
-
HEAD LOAD CARTAGE OF SP-10 POLE (0-1 KM.)
12
-
-
HEAD LOAD CARTAGE OF SP-10 POLE (1-3 KM.)
23
-
-
HEAD LOAD CARTAGE OF SP-21/23 POLE (0-1 KM.)
33
-
-
HEAD LOAD CARTAGE OF SP-21/23 POLE (1-3 KM.)
30
-
-
HEAD LOAD CARTAGE OF PETTY MATERIAL (0-1 KM.)
29.54
-
-
HEAD LOAD CARTAGE OF PETTY MATERIAL (1-3 KM.)
41.52
-
-
EXCAVATION OF PIT FOR POLE FOR SP-10
25.14
-
-
EXCAVATION OF PIT FOR POLE FOR SP-21/23
48.04
-
-
ERECTION OF SINGLE SP-10 POLE
35
-
-
ERECTION OF SINGLE SP-21/23 POLE
17
-
-
ERECTION OF DP SP-21/23 POLE
23
-
-
GROUTING OF POLES FOR SP-10
6.31
-
-
GROUTING OF POLES FOR SP-21/23
11.98
-
-
MUFFING OF POLES
98
-
-
FABRICATION OF STEEL
1240
-
-
EXCAVATION OF PIT FOR STAY SET
51.82
-
-
ERECTION OF LT STAY SET
37
-
-
ERECTION OF 11 KV STAY SET
96
-
-
GROUTING OF STAY SET
14.37
-
-
LAYING OF 1P2W LT LINE (WEASEL)
0.53
-
-
LAYING OF 2P3W LT LINE (WEASEL)
1.35
-
-
LAYING OF 3P4W LT LINE (RABBIT)
1.03
-
-
LAYING OF WEASEL HT LINE
1.46
-
-
PAINTING OF SP-10 POLE
35
-
-
PAINTING OF SP-21/23 POLE
63
-
-
ERECTION IF EARTHING ROD
22
-
-
INST. OF DANGER BOARD/NUMBER PLATE
12
-
-
CARTAGE OF 16/25 KVA DTR 71-100 KM
1
-
-
CARTAGE OF 63 KVA DTR 71-100 KM
5
-
-
CARTAGE OF 100 KVA DTR 71-100 KM
1
-
-
CARTAGE OF PETTY MATERIAL 71-100 KM
9
-
-
HEAD LOAD CARTAGE OF 25 KVA DT (0-1KM)
1
-
-
HEAD LOAD CARTAGE OF 63 KVA DT (0-1KM)
3
-
-
HEAD LOAD CARTAGE OF 63 KVA DT (1-3KM)
2
-
-
HEAD LOAD CARTAGE OF 100 KVA DT (1-3KM)
1
-
-
HEAD LOAD CARTAGE OF MATERIAL (0-1 KM)
3
-
-
HEAD LOAD CARTAGE OF MATERIAL (1-3 KM)
6
-
-
INST. OF 25 KVA DTR ON POLE STRUCTURE
1
-
-
INST. OF 63 KVA DTR ON POLE STRUCTURE
5
-
-
INST. OF 100 KVA DTR ON POLE STRUCTURE
1
-
-
FABRICATION OF STEEL
497
-
-
LAYING OF LT PVC CABLES (UPTO 150 SQMM)
120
-
-
FIXING OF TPMO
7
-
-
FIXING OF FUSE SET
7
-
-
FIXING OF LIGHTING ARRESTOR
7
-
-
CHEMICAL EARTHING
18
-
-
GUARDING OF LT/11KV LINE
1
-
-
T-OFF CONNECTION COMPLETE 11KV LINE
4
-
-
CARTAGE SP-10 POLE 21-50 KM.
6
-
-
CARTAGE OF PETTY MATERIAL 21-50 KM.
2.55
-
-