Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Eprocure
Opening Date4 Aug 2022
Closing Date18 Aug 2022
Tender AmountRefer Documents
Costs
EMD
₹ 75,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPCL9_47589_1Bid Award Id
ViewTender No
EDC(H)/35/2022-23Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
LT Bushing Complete rod (brass) for 630 KVA
8
-
-
T/F Breather Assembly (0.5 Kg Complete)
32
-
-
T/F Breather Assembly (1 Kg Complete)
32
-
-
L-contact copper Metal (500 AMP)
200
-
-
Cork Sheet 4'X4X6 mm
20
-
-
Arcing Horn
384
-
-
Empire sleeve 8 mm
100
-
-
Cotton Tap
50
-
-
Labour Charge: Opening of HT/LT Connections Dismounting of T/F From S/S D/P/Plangth and shifting of T/Fs upto repairing site.
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Cartage of the following capacity transformers from site to contractor's workshop with loading and unloading at both points
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Back cartage of the following capacity transformers from contractor's workshop to work site with loading and unloading at both points
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Opening of with top plate cover and conserver tank of T/F 11 KV bushing complete by opening nut and bolts/or cutting welding &safe stacking at work site
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Draining of T/F Oil from the tank of T/F & collecting in drums including proper & safe stacking at work site including labour and T&P required
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Opening of LT bushing from inside and outside of T/F opening of clamps of core assembly and taking out the core /winding assembling out of T/F tank including proper and safe stacking at work site.
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Repaing of HT connection leads by jointing with soldering etc. with providiong empire sleeve and proper taping encluding replacements of carbonised bushing and replacement of old packing with new rubbersied cork sheet pakcing work complete in all respect.
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Repairing of carbonised /burned LT side connecting strips by way of soldering /tightening with bolts and nut with providing empire sleeve and proper tappling of leads of all the three phase one Neutral of LT side alongwith replacement carbonised /damage bushing &replacement of old core winding assembling to remove mousture contents from core stamping including Labour and T&P required
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Repairing of T/F tank after removing sludege deposit from the bottom of the tank and cleaning of core/winding addembling with T/F oil complete work including labour and T&P Required
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Housing of core/winding assembling inside the T/F tank fixing of tighting clamps with core asembly making LT Connection with LT bushing & necessary taping of leads etc complete work including labour & T&P repqired.
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Providing and fixing on the tape changer specification as per sample and connection with the coils.
-
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Placing of conservator tank with top plate cover of T/F 11 KV bushing providing fresh rubberised cork sheet pakcing tighting with the help of nut&bolts washer/by way of welding top plate with T/F tank including labour and T&P required.
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Fitting & tapping up T/F oil in T/F tank properly and complete testing of T/F by meegar results and open and short circuit
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Cleaing of breather assembly including replacement of old packing and silica Gel with new Silica Gel including with babour and T&P required
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630 KVA
2
-
-
Installtion/Mounting of new transformer on plith pole structure and fixing of channel /angle etc. and making all connections of HT< side including providing and fixing new lugs and its complete commissioning.
-
-
-
25 KVA
5
-
-
63 KVA
8
-
-
100 KVA
19
-
-
160 KVA
3
-
-
250 KVA
12
-
-
400 KVA
10
-
-
500 KVA
5
-
-
630KVA
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements