Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date29 Dec 2023
Closing Date8 Jan 2024
Tender Amount₹ 57,43,803 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,10,100Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPCL4_66966_1Bid Award Id
ViewTender No
33/EDC(K)/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Stay Set 16X1800 MM
16
-
-
... More
Stay Wire 7/10 SWG
80
-
-
... More
Stay Clamp For ST Pole SP- 21/10 Of Size 50x6 sqmm duly red oxide painted with sitable size with fitted Nut and Bolts and washer as per specification of UPCL
16
-
-
... More
MS Half Clamp For LT DB For ST Pole SP- 21/10 Of Size 35x5 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts and washer as per specification of UPCL
380
-
-
... More
3 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm
110
-
-
... More
1 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm
80
-
-
... More
Insulated piercing connector size 70-70/35-35 sqmm for line to line tapping
350
-
-
... More
Insulated piercing connector size 70/35 sqmm to 25 sqmm for energising disribution box
410
-
-
... More
Dead End Clamp With I Hook & MS Clamp made of MS Flat for ST Pole SP-21/10 of Size 50x6 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts and washer for Dead End Assembly as per UPCL specification
205
-
-
... More
Suspension Clamp With I Hook & MS Clamp made of MS Flat for ST Pole SP-21/10 of Size 50x6 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts and washer for Suspension Clamp as per UPCL specification
370
-
-
... More
LT Wire Neutral Connector PG Clamp 50/25-25sqmm single bolt as per UPCL specificationfor energising distribution box
190
-
-
... More
LT Wire Neutral Connector PG Clamp 50-50/25-25sqmm single bolt as per UPCL specification for line to line tapping
205
-
-
... More
Head shink type end caps suitable for LT ABC
350
-
-
... More
Lug size O type 35 Sqr Mm
600
-
-
... More
1x35 sq mm XLPE insulated Al. Cable for energising the distribution boxes
900
-
-
... More
LT AB Cable 3x70+1x50 Sqr mm
3.1
-
-
... More
LT AB Cable 3x35+1x25 Sqr mm
11.4
-
-
... More
LT AB Cable 1x35+1x25 Sqr mm
6.03
-
-
... More
LABOUR PORTION
-
-
-
... More
Cartage of ST Pole SP-21 pole from Store Centre Dehradun to Work Site with Stacking site in 1Km Distance Including Loading & unloading (distance 5kms-225 kms)
-
-
-
... More
ST Pole SP-21
12
-
-
... More
ST Pole SP-10
12
-
-
... More
Head Load Cartage of ST Pole SP-21 From Road Site to work site distance approx 3.0 km By Man Power
-
-
-
... More
ST Pole SP-21
12
-
-
... More
ST Pole SP-10
12
-
-
... More
Cartage of small line material from Store Centre Dehradun to road Side Including Loading & unloading (distance 5kms-200 kms)
12.2
-
-
... More
Head Load Cartage of road side to work site distance approx. 3 kms by man power
-
-
-
... More
LT AB Cable 3x70+1x50 Sqr mm
3.1
-
-
... More
LT AB Cable 3x35+1x25 Sqr mm
11.4
-
-
... More
LT AB Cable 1x35+1x25 Sqr mm
6.03
-
-
... More
Erection charge of ST Poles SP-21/10 Pole in long Span as per UPCL Norms
-
-
-
... More
ST Pole SP-21
12
-
-
... More
ST Pole SP-10
12
-
-
... More
Fixing and Grouting of stay Complete Work
16
-
-
... More
Removing & Reconnection of Single phase/Three phase LT Consumer Service Connection
331
-
-
... More
Painting of poles on Top Portion
-
-
-
... More
ST Pole SP-21
12
-
-
... More
ST Pole SP-10
12
-
-
... More
Dismantling of Old ACSR weasel Conductor from existing LT line including Re Rolling cartage from worksite to JE Store after Head Load cartage from different site.
-
-
-
... More
LT line 3 Phase 4 Wire
2.5
-
-
... More
LT line 2 Phase 3 Wire
5.5
-
-
... More
LT line 1 Phase 2 Wire.
11
-
-
... More
Head load cartage of dismantled old ACSR Weasel Conductor from work site to road side
30.21
-
-
... More
Back cartage of dismantled old ACSR Weasel Conductor from JE Store to Rishikesh store
30.21
-
-
... More
Laying stringing and sagging of AB cable including fixing of piercing Connector, dead end clamp with I hook, suspension clamps with I hook in all complete work.
-
-
-
... More
LT AB Cable 3x70+1x50 Sqr Mm
3.1
-
-
... More
LT AB Cable 3x35+1x25 Sqr Mm
11.4
-
-
... More
LT AB Cable 1x35+1x25 Sqr Mm
6.03
-
-
... More
Laying and fixing of 1x35 sq mm XLPE insulated Al. Cable for energising the distribution boxes
900
-
-
... More
Installation of LT Distribution Box complete work
190
-
-
... More
Lopping chopping of tree Branches
17
-
-
... More
Grouting & Muffing of pole SP-10 & SP-21
24
-
-
... More
Installation of LT Distribution Box complete work
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements