Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date2 Jan 2024
Closing Date18 Jan 2024
Tender AmountRefer Documents
Costs
EMD
₹ 75,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
E Tender No 38/edc(kashipur)/2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPCL9_66994_1Bid Award Id
ViewTender No
E Tender No 38/EDC(Kashipur)2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of HT Stay Insulator made of best Quality Pore Line and Without Defeets ISI Standerd. (As per Specification & Drawing of UPCL)
24
-
-
Supply of Nut and bolts off Size.
51
-
-
Supply of Stay Clamp made of M S Flat for ST Pole SP-55 duly Red Oxide Painted with Nut and Bolts and washer.
(As Per Specification & Drawing of UPCL)
28
-
-
Supply of LT Air Circuit Breaker (ACB) Type Complete LT Distribution Board for 250/400 KVA Transformer DTR fitted with short cricuit (Current/Time Delay) 100-1000% of 1ct/50-600 m sec and 1 No 800 Amp CT Including Mircroprocessor release IPR-1 manual Opreated Fixed Type (4 Poles as per IS-13947-2 & IEC 60947-2 with Panel and mounting structure). Make (IS Complied Reputed Company)
14
-
-
Supply of Aluminium Crimping Lug Size 240 sq mm made of best Quality Pore Line and Without Defeets ISI Standerd. (As per Specification of UPCL)
104
-
-
Supply of Aluminium Crimping Lug Size 400 sq mm made of best Quality Pore Line and Without Defeets ISI Standerd. (As per Specification of UPCL)
8
-
-
TF Installation Work
-
-
-
Cartage of the following material by private truck from store centre to work site dump store approx. distance 0 to 20 Km. including loading into truck and unloading at Dump store.
-
-
-
ST Pole SP-55
28
-
-
Other Small Line Material
28.5
-
-
250 KVA T/F
14
-
-
400 KVA T/F
1
-
-
Fixing of M.S. earthing rod 20×2500 mm for earthing of support as per RESPO drawing No. RES-12 including digging earth rod 0.3 m deep below ground level connected to support with earth wire 16 swg fixing of all accessories in all respect as per Specification of UPCL.
28
-
-
Fabrication of Channel/angle to Single/Double pole Structure Straight Cross arm T off Top and Dropper, Brecing Channel of M.S. Channel 100x50 & M S Angle 65x65x6 mm Cutting and Holling in all respect as per Specification of UPCL.
1470
-
-
Excavation of earth for Stay set pit of size 0.6x0.6x1.2 Mtr Length in all type of soil including proper dressing of sides and ramming of bottom including getting out soil and disposal of surplus excavation soil as directed complete work in all respect.
12.1
-
-
Grouting of Stay in size (0.6x0.6x0.3)in CC ratio 1:4:8 (1Cement :4Graded Stone :20 mm nomial size :8 coarse sand) Block Including cost of material complete in all respect as per specification of UPCL.
3.02
-
-
Excavation of Earth for Pole structure of Pole Pit of Size (0.9x0.6x1/6) of pole length in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and diposal of surplus soil as directed complete work.
21.42
-
-
Erection of following Pole structure after digging of pit size 0.6×0.6 mtrs & 1/6 length of support on 300×300×75 mm stone pad including fixing with all accessories complete in all respect as per Specification of UPCL.
-
-
-
Double Pole Structure of STP SP-55
14
-
-
Grouting of Pole in size (0.45x0.45x1/9) length of support in CC ratio 1:4:8 (1Cement :4Graded Stone :20 mm nomial size :8 coarse sand) Block Including cost of material complete in all respect as per specification of UPCL.
5.35
-
-
Muffing of Pole in size (0.45 cm x 0.6 cm) radious with CC ratio 1:3:6 (1Cement : 3core sand : 6 graded stone 10 mm nomial size) Block size 45cm height from ground level Including cost of material complete in all respect as per specification of UPCL.
28
-
-
Construction of Transformer Plinth with size 2x2x1.1 meter above ground level and 0.6 mtr below level including the cost of material such as cement brick, ballast, sand etc complete work and tests as per standard.
-
-
-
Excavation of Earth for DTR Plinth
15.88
-
-
Cement Concreting work on DTR Plinth
15.88
-
-
Brick work in 1:4 Ratio DTR Plinth
6.96
-
-
RR Massonary work for DTR Plinth
7.94
-
-
RCC work of DTR Plinth
1.98
-
-
Cement Plaster on DTR Plinth
30.24
-
-
Mounting and Installation of Following Capacity DTR Transformer/Plinth/Double Pole Structure with the help of Chain Pulley/Crain Depending upon the nature of Job at work complete in all respect and Energisation of Transformer.
-
-
-
250 KVA T/F
14
-
-
400 KVA T/F
1
-
-
Providing and fixing of wire mesh of size 50x35mm around plinth and toe wall duly welded with frame of MS angle iron 35x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter) with the height of 0.5meter above the plinth 2meter above the toe wall with 01No gate and locking arrangement in the toe wall size including grouting of 6Nos, legs in the ratio in block of size 0.25x0.25x0.45 meter including gravilling of single of size 20 to 40 mm and complete painting of wire mesh with aluminium. paint with two coat. (including the cost of cement and all material)
54
-
-
Mounting and Fixing of TPMO including fixing with all accessories complete in all respect as per Specification of UPCL.
14
-
-
Mounting and Fixing of Fuse set on D/P including fixing with all accessories complete in all respect as per Specification of UPCL.
14
-
-
Dismantling of 100 KVA T/F Complete in all respact.
14
-
-
Dismantling of 250 KVA T/F Complete in all respact.
1
-
-
Back Cartage of 100 KVA T/F to Store Center
14
-
-
Back Cartage of 250 KVA T/F to Store Center
1
-
-
Dismantling of PCC Pole complete in all respect.
4
-
-
Laying of LT Cable 150 sq mm Complete in all respect.
720
-
-
Painting of following steel tubular poles with two coats of Aluminum paint Berger Luxol quality over one coat of red oxide primer and P.O. red on top above guarding angle in all respect as per Specification of UPCL.
-
-
-
ST Pole SP-55
28
-
-
Laying of LT Cable 400 sq mm.
40
-
-
Dismantling and Rejumpering of Conductor.
1
-
-
Dismantling of Cable/Neutral Stand.
17
-
-
Fixing and tightening of stay set with pole and stay rod on required tension as per specification of UPCL.
28
-
-
Installation of ACB LT Distribution Box.
28
-
-