Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date14 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 1,76,84,135
Costs
EMD
₹ 3,54,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_76964_1Bid Award Id
ViewTender No
37/EDCC/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Technical Specifications
BOQ Items
33 KV Tension Clamp with bail & IPC
165
-
-
33 KV Polymer Pin Insulator With Pin
294
-
-
Disc insulator (B&S) type 90 KN for 33 KV
165
-
-
Disc fitting (B&S) type 70 KN for 33 KV
165
-
-
33 KV Cable Ties for Pin insulator
588
-
-
33 KV IPC for covered to covered connections
9
-
-
33 KV IPC for covered to Bare connections
18
-
-
33 KV Mid Span Jointing Kit
6
-
-
IPC with Aluminium Bail for earthing
6
-
-
Stay Clamp for SP 55 with N&B
56
-
-
Labour
-
-
-
Cartage of following material from ESC to Road site of work dist Apprx 0-200 km Loading/unloading comp
-
-
-
ST pole SP-55
30
-
-
Small Material
14.38
-
-
Head load cartage of following material from road site to work site dist. Apprx. 0 2 km Loading/unloading complete
-
-
-
ST pole SP-55
30
-
-
Small Material
14.38
-
-
Removing of old conducior with opening of existing jumpering and making of bundle with carriage from work site to store including loading/unloading complete
15141
-
-
Laying, spreading, stringing, sagging of 33 KV line in 3 Phase of the following wire as phase wire including proper sagging with binding and jumpering as per user manual and sagging comp. work done Inclusive of cartage and head load cartage at work site), Rollers of the appropriate diameter and quantity have to to be provided for installation. The rollers shall have a smooth clean surface, no sharp edges and shall rotate easily. To prevent the covering from damage any abrasive contact with soil or stone is not permitted. Abrasive contact of the covering with branches or similar shall be avoided. Covered conductor shall be pulled by using appropriate pulling devices ensuring that the pulling force is distributed to the conductor Recommendations.
-
-
-
33 KV AAAC AL-59, 160 sq mm Covered Conductor
15141
-
-
Excavation of earth and erection of ST pole SP 55 single
support with CC Comp
20
-
-
Excavation of earth and erection of ST pole SP 55 double
support with CC Comp
5
-
-
Fabrication of steel by cutting and drilling properly
660
-
-
Erection of earth rod
30
-
-
Muffing of SP 55 old & new pole
236
-
-
Erection of stay set complete
28
-
-
Fixing of MVCC Accessories
-
-
-
33 KV Tension Clamp with barl & IPC
165
-
-
33 KV Cable Ties for Pin Insulator
588
-
-
33 KV IPC for covered to covered connections
9
-
-
33 KV IPC for covered to Bare connections
18
-
-
33 KV Mid Span Jointing Kit
6
-
-
IPC with Aluminium Bail for earthing
6
-
-
painting of old & New Pole
236
-
-
Back carriage of material from site to store (0-100 kms) including manual shifting
30.14
-
-
Erection of 33 KV Polymer Pin Insulator With Pin
294
-
-
Erection of 33 KV Polymer Disc Insulator With Fitting
165
-
-
Back carriage of dismentaled material from work site to work road side Average distance 2 Km
30.14
-
-
Fixing of Aluminium Lugs
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements