Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil Works Roads
Eprocure
Opening Date22 Mar 2021
Closing Date6 Apr 2021
Tender AmountRefer Documents
Costs
EMD
₹ 75,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UPCL4_31092_1Bid Award Id
ViewTender No
TENDER NO. 13/EDC(U)2020-21Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
STP SP 23/21
80
-
360
PCC Pole
20
-
400
Cartage of other material from store to site with Loading/unloading at both site & proper staking per Qtl 0-20 Km
120
-
300
Cartage of the following capacity T/F from store to site with Loading/unloading at both site & proper staking (Loading,unloading & Carriage per T/F ) 0-20 Km
-
-
-
63 KVA
5
-
2200
100 KVA
5
-
2400
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil includinf proper dressing of side and ramming of bottom including getting out the excavated soil and disposal of surplus soil
120
-
175
Erection of the following Single support pole in proper level and alighment along with fixing of all accessories , like top channel and clam as per resspo construction manual
-
-
-
PCC Pole
20
-
1000
SP-33
10
-
800
SP-23/21
76
-
500
SP-55
10
-
1000
Erection of the following Doble support pole in proper level and alighment along with fixing of all accessories , like top channel, X bracing and clam as per resspo construction manual
-
-
-
SP-33
5
-
1600
SP-23
2
-
1200
SP-55
10
-
2100
Grouting of pole in size 0.45x0.45x1/6 of the support in cc ratio 1:4:8 including cost of cement proper alignment , leveling as per RESSPO construction manual
40
-
4100
Muffing of poles with CC 1:3:6 block & 45 Cm Hieght from ground level including cost of ballast, cement & sand etc.
130
-
485
Fabrication of M.S. channel & Angle iron after cutting in required sizes with drilling of holes upto good finish for tpo channel, braking and special type bracket etc. as per RESPO shedule and local approved drawing.
4500
-
18
Fixing of D- type bracket for in LT Line.
20
-
400
Fixing of triangular type bracket in 11 KV Line.
10
-
500
Fixing and Installation of LT fuse
10
-
1000
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
22
-
190
Fixing , tightening and nozzaling of stay with pole and stay rod on required tension as per resspo
-
-
-
Stay set 16x1800 mm for LT line
20
-
325
Stay set 16x1800 mm for 11 kv line.
30
-
400
Grouting of stay rod in size 0.6x0.6x0.3 with CC 1:4:8 cement block including cost of ballast, cement and sand, back filling of soil and boulders in pit and ramming of bottom including getting out the excavated soil
6
-
4100
Earthing of support with M.S. Earth rod of 2.5 meter long by hamming of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual
70
-
325
Laying,spreading,Stinging and saging of HT 11 KV Line in three phase (3 phase 4 wire) of the following as phase wire & G.I Earth wire complete including fixing of all accessories in 3 no conductor in parallel with binding and jumpering as per profile and sagging chart .
-
-
-
ACSR weasel Conductor
1
-
12500
ACSR Rabbit conductor
0.5
-
14000
Laying, spreading, Strnging and Sagging of L.T. Lines of the following wire with phase wire & G.I. earth wire complete with binding and jumpering as per RESPO Specn.
-
-
-
Single wire ACSR Weasel
10
-
3120
Single wire ACSR Rabbit
2.5
-
3500
laying sagging and binding of LT AB cable of size 3x120+1x95+1x16 sq mm/3x95+1x70+1x16 sq mm/3x25+1x70+1x16 sq mm
2000
-
24
Fixing of following GI clamps with hooks
-
-
-
Dead End clamps assembly (with bracket, stainless steel strap and Buckle etc.
35
-
86
Suspension Clamp assembly (with bracket, stainless steel strap and Buckle etc.
30
-
86
Fixing of following shear head type insulating piercing connectors Suitable for jumpering and distribution box for line to line tapping
-
-
-
120 Sq.mm - 120 Sq. mm
80
-
80
120 Sq.mm - 35 Sq. mm
60
-
55
95 Sq.mm - 95 Sq. mm
120
-
70
95 Sq.mm - 35 Sq. mm
80
-
50
Erection of Three phase LT distribution boxes………….. incoming & outgoing connection, sealing.
40
-
850
Chemical Earthing of distribution transformer of 25kva,63kva &100 kva T/F Complete of digging of pit f size 2.5 mtr depth and make hole of size 150 mm placing of earthing electrod to be supplied by contractor as per drawing connecting the same with GI strip of size 35x6 mm as per drawing
10
-
9000
Gaurding of line over ( Telephone/Road/Line crossing as per drawing with 6/8 SWG G.I Wire including fixing of gaurding channel/ Angle as per resspo manual LT/11 Kv
20
-
1800
Installation / Monting of new T/f on plinth/ double pole structure and fixing of channel/angle etc and making all connection of HT and LT side and its complete commissioning.
-
-
-
63 KVA
5
-
1850
100 KVA
5
-
2200
Laying of LT service cable from pole to consumer end meter along with supporting GI Wire
400
-
40
Laying and erection of L.T.PVC Cable including crimping of lugs of size 1x70,120.150 Sq. mm.
400
-
25
Laying and erection of L.T.PVC Cable including crimping of lugs of size 1x240, 400, 630 Sq. mm.
200
-
35
Digging of trench of size 0.6x0.15x0.9 mtr and laying of underground LT cable with making of brick housing and filling of sand including filling of earth with ramming & repairing of road including cost of cement sand and stone blast
200
-
200
Digging of trench of size 0.6x0.15x1.5 mtr and laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming & repairing of road including cost of cement sand and stone blast
500
-
325
Mounting and Fixing of TPMO and fuse sets on double pole structures including making of connections for smooth running and operation.
10
-
2200
Mounting and fixing of LT MCCB panel on double pole help of clamp complete work. Clamp shall be provided by the supplier.
10
-
3000
Mounting and fixing of lightning arrestor set (3Nos) on double pole structures including making all connections by G.I. Strip size 35 x6 mm to earth point (including cost of G.I.strip)
15
-
1800
Route clearance by cutting of Tree branches/ proning, loping and chopping of trees for L.T. 11 & 33 KV line.
5
-
750
Fixing of 11 KV i/d jointing kit as per required
25
-
2500
Fixing of 11 KV o/d termination kit as per required
25
-
2500
Cartage of 11 KV metering cubical from store center with safely thought vehicle complete with loading& unloading.
5
-
3200
Installation of 11 KV metering cubical in the metering room with grouting and making all connection
5
-
8000
loading/Unloading & carriage of LT PRMC from store to pit site & installation on the double pole with the help of nut bolt & clamp and making of passing LT cable from T/F to PRMC
10
-
2500
Supply of 1x35 sqmm single core LT XLPE Cable for connecting distribution box
300
-
150
Supply of Suitable lug for energizing LT Distribution box 35 mm
300
-
150
Supply of Holding Clamp for ST/SP -55 pole
100
-
279
Supply of Holding Clamp for ST/SP -PCC pole
20
-
257
Supply of Holding Clamp for ST/SP -23/21 pole
100
-
250
Supply of Holding Clamp for ST/SP -33 pole
40
-
198
Supply of Stay Clamp for ST/SP -55 pole
20
-
265
Supply of Stay Clamp for ST/SP -PCC pole
10
-
241
Supply of Stay Clamp for ST/SP -23/21 pole
15
-
240
Supply of Stay Clamp for ST/SP -33 pole
5
-
231
Supply of ''F'' Clamp for PCC pole
10
-
96
Supply of earth Clamp for PCC pole/ST pole
90
-
218
Supply of LT clamp for PCC pole/ST pole
80
-
237
Supply of LT clamp for ST/SP- 33 pole
50
-
231
Supply of LT clamp for ST/SP- 23/21 pole
250
-
230
Supply of LT clamp for ST/SP- 55 pole
30
-
259
Supply of Aluminium Lug of size 95 sq.mm
400
-
125
Supply of Aluminium Lug of size 70 sq.mm
400
-
100
Supply of Aluminium Lug of size 150 sq.mm
400
-
175
Supply of Piercing connector Suitable for 120-120 MM
80
-
130
Supply of Piercing connector Suitable for 120-35 MM
60
-
120
Supply of Piercing connector Suitable for 95-95 MM
120
-
110
Supply of Piercing connector Suitable for 95-35 MM
80
-
100
Supply of J-Hook with clamp suitable for AB Cable of size 3x120+1x95 sq mm
35
-
220
Supply of Dead end clamp suitable for AB Cable of size 3x120+1x95 sq mm
30
-
180
Supply of Nut & Bolt of size
100
-
215
Supply of Three Phase distribution box with clamp & nut & bolt
40
-
2600
Supply stay insulator 90x65 mm With N&B
50
-
65
Supply of shackle insulator 100x115 mm With N&B
400
-
110
Supply of LT MCCB Microprocessor 200 Amp. 4 pole with panel for 100 KVA DTR
10
-
32000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements