Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Energy, Oil and Gas
Eprocure
Opening Date19 Sep 2024
Closing Date28 Oct 2024
Tender Amount₹ 2,32,00,000
Costs
EMD
₹ 2,32,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Replacement Of Acsr Weasel Bare Conductor By Insulated Covered Conductor (aaac) In 11 Kv Lalkuan Feeder Emanating From 33/11 Kv S/s Pantnagar Under Edd, Kichha
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL3_76055_1Bid Award Id
ViewTender No
EDC(USN)21/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
25
-
-
Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in 11 KV Line
25
-
-
Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand) block including cost of Cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
25
-
-
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work.
18
-
-
Erection of SP-33 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps a s per RESPO manual.
8
-
-
Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps a s per RESPO manual.
2
-
-
Erection of SP-33 double support pole in proper level and alignment along with fixing of all accessories like top channel,X bracings & clamps as per RESPO manual
2
-
-
Erection of Sp-55 double support pole in proper level and alignment along with fixing of all accessories like top channel,X bracings & clamps as per RESPO manual
2
-
-
Muffing of poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc.
90
-
-
Dismantling of existing HT line including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store(ACSR Weasel)
2.5
-
-
Painting of SP-55 pole with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level.
32
-
-
T-off Connection Complete 11 KV line as per direction of Engineer in charge.
120
-
-
Making of section pole for existing LT/HT/33KV line complete in all respect.
10
-
-
Cartage of ST pole SP-33 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km)
12
-
-
Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km)
6
-
-
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km)
195
-
-
Headload cartage of SP-33 Pole from road to site (distance 0-1 Km)
12
-
-
Headload cartage of SP-55 Pole from road to site(distance 0-1 Km)
6
-
-
Headload cartage of small material(distance 0-1 Km)
195
-
-
Straightning of Tilted STP Poles as per direction of Engineer in charge.
44
-
-
Tightening of Stay Set as per direction of Engineer in charge.
61
-
-
Laying G.S. Earth wire 7/16 SWG for providing Earth Wire on 11 KV Line.
2.9
-
-
Fixing of IPC with AL. Bail for Earthing as per direction of Engineer in charge.
72
-
-
Removing Heavy Tree Branches from line as per direction of Engineer in charge.
78
-
-
Fixing of 11 KV 90KN Tension Clamp B&IPC as per direction of Engineer in charge.
162
-
-
Fixing of 11 KV Suspension Ties as per direction of Engineer in charge.
660
-
-
Fixing of 11 KV IPC for CC to CC Conductor as per direction of Engineer in charge.
190
-
-
Fixing of 11 KV IPC for CC to Bare Conductor as per direction of Engineer in charge.
120
-
-
Fixing of 11 KV Mid Span Jointing Kit as per direction of Engineer in charge.
42
-
-
Opening of 11 KV Jumper and Making again of section pole as per direction of Engineer in charge.
150
-
-
Laying Spreading, Stringing AAAC Conductor as per direction of Engineer in charge.
8700
-
-
Back Carriage of scrap material
1
-
-
Annexure-B (SUPPLY ITEMS)
-
-
-
Supply of MS NUT & BOLT Off size
50
-
-
Supply of Earth wire Clamp with N&B
50
-
-
Supply of Holding Clamp for SP-55 with N/B
186
-
-
Supply of Stay Clamp for SP-55 with Nut & Bolt
25
-
-
Supply of 11 KV Cable Ties for Pin Insulator
653
-
-
Supply of 11 KV IPC for Covered to Covered Conductor.
190
-
-
Supply of 11 KV IPC for Covered to Bare Conductor.
120
-
-
Supply of 11 KV mid span Jointing Kit
42
-
-
Supply of IPC with Al. BAIL for Earthing 11 KV
72
-
-
Supply of 11 KV AAAC Covered Conductor AL-59, 99 Sq.mm.
8700
-
-
Supply of ACE Chemrod DIA60MM Length 3000MM
45
-
-
Supply of Fluid Compound for Chemical Earthing Rod.
2250
-
-
Supply of 11 KV Tension Clamp with BAIL & IPC.
162
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements