Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Eprocure
Opening Date6 Aug 2024
Closing Date20 Aug 2024
Tender Amount₹ 20,03,000
Costs
EMD
₹ 61,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Shifting Of 33 Kv Jhajra To Kaulgarh Line And Associated Ht/lt Line.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_74302_1Bid Award Id
ViewTender No
Tender No. 06/EDC(U)/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Holding Clamp J-I hook for AB cable
70
-
-
E- CLAMP
150
-
-
PG CLAMP 95-95 SQ.mm.
50
-
-
LT Clamp(50x6mm) for SP-72 with N&B
30
-
-
Bottom Bracing clamp 33KV for SP-72- N&B
2
-
-
PP & CLAMP WITH N&B ST POLE SP-55
30
-
-
PG CLAMP ALU ALLOY PANTHER TO PANTHER
100
-
-
SUSPENSION CLAMP EYE HOOK LT ABC CABLE
25
-
-
PP & CLAMP WITH N&B ST POLE SP-72
170
-
-
STAY CLAMP FOR SP-72 WITH N/B
10
-
-
Street Light Clamp For SP55 With N&B
20
-
-
PIERCING CLAMP FOR 120 SQ.mm - 120
SQ.mm
60
-
-
MS CLAMP WITH N&B FOR DISTRIBUTION BOX
50
-
-
DEAD END CLAMP FOR AB CABLE
35
-
-
SHACKLE INSULATOR 100X115 mm WITH N&B
50
-
-
Piercing Connector 16-16sqmm
60
-
-
Piercing Conductor 95-35sqmm
50
-
-
LT Distribution Box 3Phase 4Wire
35
-
-
Top Bracing clamp 33KV for SP-72 withN&B
2
-
-
PG Clamp Dog to Dog
100
-
-
Piercing Connector 120 to 35 sq. mm
120
-
-
INSULATED PIERCING CONNECTOR 16-35 SQ.MM
40
-
-
STUD CLAMP WITH N&B STP SP-33 to SP-23
8
-
-
Connecting Cable XLPE AL. 1x35 sq. mm.
280
-
-
AL CRIMPING TYPE LUGS 35 SQ.mm
280
-
-
LABOUR CHARGES
-
-
-
SPECIAL EARTHING
2
-
-
ERECTION OF EARTHING ROD
29
-
-
FABRICATION OF STEEL
5920
-
-
ERECTION OF 33 KV STAY SET
10
-
-
ERECTION OF SINGLE SP-23 POLE
4
-
-
ERECTION OF SINGLE SP-55 POLE
8
-
-
ERECTION OF SINGLE SP-72 POLE
48
-
-
ERECTION OF SP-55 DOUBLE POLE
2
-
-
ERECTION OF SP-72 DOUBLE POLE
1
-
-
DISMANTLING OF PCC SINGLE POLE
14
-
-
DISMANTLING OF SP-21/SP-23 SINGLE POLE
3
-
-
DISMANTLING OF SP-55 SINGLE POLE
3
-
-
DISMANTLING OF SP-72 SINGLE POLE
7
-
-
DISMANTLING OF RAIL SINGLE POLE
18
-
-
DISMANTLING OF PCC DOUBLE POLE
1
-
-
DISMANTLING OF SP-55 DOUBLE POLE
1
-
-
DISMANTLING OF 11 KV LINE(RABBIT)
0.18
-
-
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
0.46
-
-
DISMANTLING OF LT LINE 3 P 4 W(RACCOON))
0.37
-
-
DISMANTLING OF LT LINE 3 P 5 W(WEASEL)
0.1
-
-
DP.UG2402575
1
-
-
DISMANTLING OF 100 KVA DTR
2
-
-
DISMANTLING OF STAY SET
15
-
-
INSTALLATION OF LT PRMC
1
-
-
PAINTING OF SP-21/23 POLE
4
-
-
PAINTING OF SP-55 POLE
12
-
-
PAINTING OF SP-72 POLE
50
-
-
LAYING OF LT SERVICE CABLE(OVERHEAD)
700
-
-
INST. OF 250 KVA DTR ON POLE STRUCTURE
1
-
-
INST. OF 63 KVA DTR ON POLE STRUCTURE
1
-
-
FIXING OF TPMO
1
-
-
FIXING OF FUSE SET
1
-
-
FIXING OF LIGHTNING ARRESTOR
1
-
-
FIXING OF LT FUSE SET
2
-
-
ERECTION OF BRACKET IN LT LINE
5
-
-
ERECTION OF BRACKET IN 11 KV LINE
4
-
-
ERECTION OF BRACKET IN 33 KV LINE
50
-
-
LAYING OF DOG CONDUCTOR IN HT LINE
1
-
-
LAYING OF PANTHER CONDUCTOR IN HT LINE
0.88
-
-
GUARDING OF 33 KV LINE
50
-
-
CONST.,INST.OF DANGER BOARD/ NUMBER PLATE
50
-
-
MAKING OF SECTION POLE
17
-
-
CARTAGE SP-21/23 POLE, 0-20 KM
4
-
-
CARTAGE SP-55 POLE, 0-20 KM
12
-
-
CARTAGE SP-72 POLE, 0-20 KM
50
-
-
CARTAGE OF PETTY MATERIAL,0-20 KM
140
-
-
CARTAGE OF 100 KVA DTR, 0-20 KM
2
-
-
CARTAGE OF 250 KVA DTR, 0-20 KM
1
-
-
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
4
-
-
HEADLOAD CARTAGE SP-55 POLE(0-1 KM)
12
-
-
HEADLOAD CARTAGE SP-72 POLE(0-1 KM)
50
-
-
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
261
-
-
HEADLOAD CARTAGE OF 100 KVA DTR(0-1 KM)
2
-
-
HEADLOAD CARTAGE OF 250 KVA DTR(0-1 KM)
1
-
-
DISCONNECTION & RECONNECTION
OF CONsumer
210
-
-
DISMANTLE & REINSTALL OF STREETLIGHT
20
-
-
DISMANTLING OF 33 KV LINE(PANTHER/DOG)
1.88
-
-
STRAIGHTNING OF TILTED EXISTING LT POLE
3
-
-
Laying of LTXLPE ABC 3X120+1X95
+1X16 Sq.
1084
-
-
DISMAN LT XLPE ABC 3X120+1X95
+1X16 Sq.mm
240
-
-
SAGGING/RESAGGING OF ACSR/ABC LT LINE
34
-
-
BACK CARTAGE OF PETTY MATERIAL,0-20 KM
121
-
-
PROVIDING FRESH JUMPERS 11KV/LT LINE
2
-
-
Dismantling of 11 KV XLPE Cable
80
-
-
LAYING OF 11 KV CABLE POLE TO POLE
80
-
-
DISMANTLE OF EXITING TPMO/GO/ ISOLATOR
2
-
-
DISMANTELLING OF EXITING FUSE SET
6
-
-
DP.UG2402575
60
-
-
DISMANTLING OF OLD DAMAGE LT PRMC
3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements