Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Civil Works Others
Electrical and Electronics
Eprocure
Opening Date4 Aug 2022
Closing Date18 Aug 2022
Tender AmountRefer Documents
Costs
EMD
₹ 57,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPCL9_47583_1Bid Award Id
ViewTender No
EDC(H)/32/2022-23Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
LT bushing complete rod(brass) for 250 and 400 KVA
50
-
10
... More
T/F Breather assembly(.5 kg. complete
60
-
10
... More
T/F Breather assembly(1 kg. complete
60
-
10
... More
L-contect copper metal(500amp)
150
-
10
... More
Cork Sheet 4'x4'x6mm
20
-
10
... More
Arcing Horn
400
-
10
... More
Labour Charge: Opening of HT/LT connections, dismounting of T/F from sub station double pole and shifting of transformer upto reparing site.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
Opening of with top plate cover and conservetrtank of T/F 11 KV bushing complete by opening nut & bolt/or cutting welding & safe stacking at work site.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Draning out T/F oil from the tank of T/F & collecting in drums encluding proper & safe stacking at work site encluding labour & T&P required.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Opening of LT bushings from inside & outside of T/F opening of clamps of core assembley & taking out the core/winding assembling out of T/F tank encluding proper & safe stacking at work site at work site.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
PREPARATION OF LV LEG COILS - All LV leg coils of the T/F will be prepared by New D.P.C L.T Strip.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
MAKING OF HV LEG COILS - HV coils will be prepared by new DPC/SE winding wire of same size and same No. of turns.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Repairing of HT connection leads by jointing with soldering etc. with providing empire sleeve & proper taping encluding replacement of carbonised bushing & replacement of old packing with new rubbersied cork sheet packing work complete in all respect
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Reparing of carbonised/burned LT side connecting strips by way of soldering/tighting with bolt & nut with providing empire sleeve & proper tappiing of leads of all the three phase one neutral of LT side alongwith replacement of carbonised/damage bushing & replacement of old packing with new rubberised cork sheet packing & short circuit the core/winding assembling to remove moisture contents from core stamping encluding labour & T&P required.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Providing skilled labour for testing alongwith welding of Top covers plate/tightening of nuts & bolts of the transformer (Welding rods shall be arranged by the contractor).
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Reparing of T/F tank after removing sludege deposit from the bottom of the tank & cleaning of core/winding assembling with T/F oil cimplete work including labour & T&P required.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Housing of core/winding assembling inside the T/F tank fixing of tighting clamps with core assembly making LT connection with LT bushing & necessary taping of leads etc. complete wotk encluding labour & T&P required.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Provding & fixing on the top of core channel, tape changer specification as per sample & connection with the coils.
-
-
-
... More
250 KVA
12
-
10
... More
400 KVA
15
-
10
... More
Placing of conservator tank with top plate cover of T/F 11 KV bushing providing fresh rubberised cork sheet packing & tighting with the help of but & bolts & washer/by way of welding top plate with T/F tank encluding labour & T&P required.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Fitting & tapping up T/F oil in T/F tank properly & complete testing of T/F by meegar result & open & short circuit test result.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Cleaning of breather assemply encluding replacement of old packing & silica zel with new silica zel encluding with labour & T&P required.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
... More
250 KVA
4
-
10
... More
400 KVA
1
-
10
... More
Shifting of T/F from work site to T/F double pole & mounting of transformer on sub station double pole cleaning of terminal of LT cable removing of carbon by sand pepring etc. & provinding new lugs of terminals fixing & making complete connection with the transformer.
-
-
-
... More
25 KVA
12
-
10
... More
63 KVA
15
-
10
... More
100 KVA
20
-
10
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements