Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date22 Mar 2025
Closing Date8 Apr 2025
Tender Amount₹ 1,00,01,000
Costs
EMD
₹ 2,00,500Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPCL4_81799_1Tender No
Tender no.86/EDC(s)/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
3 Phase LT Distribution Box With inbuilt Pannal lock, Al Bus Bar Sz 25x6mm Al Bus Bar N Sz 40x6 mm
150
-
-
... More
MS Half Clamp for LT Distribution Boxes for ST Pole SP- 21 of Size 35x6 sqmm duly red oxide painted with suitable sz Nut and Bolts
550
-
-
... More
Al. Lug of different sizes
2000
-
-
... More
Insulated Piercing connector size 70-70/35-35 sqmm for line to line tapping
800
-
-
... More
Insulated Piercing connector size 70 sqmm to 25 sqmm for energising disribution box
1000
-
-
... More
Dead End Clamp With I Hook
650
-
-
... More
Suspension Clamp With I Hook
850
-
-
... More
LT bare N.Connector PG clamp for Double Bax 25-25 sq.mm
630
-
-
... More
1x25 sq mm XLPE insulated Al. Cable for energising the distribution boxes
1250
-
-
... More
LT AB Cable 3x35+1x25 Sqr. Mm
20800
-
-
... More
LT AB Cable 1x35+1x25 Sqr. Mm
19500
-
-
... More
Labour
-
-
-
... More
Safe Cartage of SP-21/23 pole from Store Central Dehradun/Rishikesh to Work Site with Stacking site in 1Km Distance Including Loading & unloading (distance 100-150 Km.)
-
-
-
... More
ST Pole SP-21/23 (Hot Dip Galvanised)
90
-
-
... More
Head Load Cartage of ST Pole SP-21/23 From Road Site to work site. (Avg distance approx 0-1 km)
-
-
-
... More
ST Pole SP-21/23 (Hot Dip Galvanised)
90
-
-
... More
Cartage of small Line material from Store Central Dehradun/Rishikesh to Work Site with Stacking site in 1 Km Distance Including Loading & unloading (Approx distance 150-200 Km)
353
-
-
... More
Exacavation Pit for Pole of sz 0.9x0.6*1/6 of length of support
68.85
-
-
... More
Erection ST Pole SP-21/23 (Hot dip galvanized)
90
-
-
... More
Grouting of Poles 0.45x0.45x1/9 of full length of support
17.19
-
-
... More
Exacavation Pit for stay of sz 0.6x0.6x1.2m
25.92
-
-
... More
Fixing and erection of LT Stay Set Complete
60
-
-
... More
Grouting of Stay set 0.6x0.6x0.3m
6.48
-
-
... More
Laying of LT XLPE ABC 3x25+25 sq.mm
15800
-
-
... More
Dismantling of Old ACSR weasel Conductor from existing LT line including Re Rolling cartage from worksite to JE Store after Head Load cartage from different site.
-
-
-
... More
LT line 3 Phase 4 Wire
10
-
-
... More
LT line 2 Phase 3 Wire
21
-
-
... More
LT line 1 Phase 2 Wire.
30.7
-
-
... More
Laying stringing and sagging of AB cable including fixing of piercing Connector, dead end clamp with I hook, suspension clamps with I hook in all complete work.
-
-
-
... More
LT AB Cable 3x35+1x25 Sqr. Mm
20800
-
-
... More
LT AB Cable 1x35+1x25 Sqr. Mm
19500
-
-
... More
LT AB Cable 3x120+1x95+1x16 Sq.mm.
500
-
-
... More
LT AB Cable 3x95+1x70 Sq.mm
500
-
-
... More
Laying and fixing of 1x25 sq mm XLPE insulated Al. Cable for energising the distribution boxes
1250
-
-
... More
Installation of LT Distribution Box complete work
550
-
-
... More
Fixing of Al. Lugs
2024
-
-
... More
Fixing of Holding clamp and stay clamp with Nut & Bolt
1150
-
-
... More
Looping chopping of tree Braches
20
-
-
... More
Straightening of Tilted Pole
99
-
-
... More
Back Head load cartage of petty material from work site to road side
353
-
-
... More
Back cartage of dismantled material 100-150 Km.
156
-
-
... More
Fixing of Aluminium Lugs
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%