Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date24 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 14,95,000
Costs
EMD
₹ 45,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL9_76129_1Bid Award Id
ViewTender No
11/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Holding clamp for SP-23 with N&B
243
-
100
... More
Stay ClampSP-21 with N&B
252
-
100
... More
Bracing clamp for SP-23 with nut & bolt (Top)
100
-
100
... More
Bracing clamp for SP-23 with nut & bolt (Bottom)
100
-
100
... More
Stay clamp for SP-23 with D/E with N&B
120
-
100
... More
LT Clamp SP-21 with N&B
242
-
100
... More
Earth wire clamp for SP-23 with nut & bolt
60
-
100
... More
LABOUR CHARGE
-
-
-
... More
Cartage of STP SP-23 Pole
80
-
100
... More
Cartage of STP SP-21 Pole
40
-
100
... More
Cartage of Small material
90
-
100
... More
Cartage of T/F 11/0.4 KV 25 KVA
12
-
100
... More
Cartage of T/F 11/0.4 KV 63 KVA
2
-
100
... More
Cartage of T/F 11/0.4 KV 100 KVA
1
-
100
... More
Head load Cartage of STP SP-23 Pole
80
-
100
... More
Head load Cartage of STP SP-21 Pole
40
-
100
... More
Head load Cartage of Small material
90
-
100
... More
Head load Cartage T/F 11/0.4 KV 25 KVA
12
-
100
... More
Head load CartageT/F 11/0.4 KV 63 KVA
2
-
100
... More
Head load Cartage T/F 11/0.4 KV 100 KVA
1
-
100
... More
Fabrication of MS Chanel,Angle iron after cutting in required size with drilling of holes upto good finish for top channel,bracing and special type bracket etc as per RESPO schedule & local approved drawing.
2505
-
100
... More
Excavation of earth for pole pit of size 0.9*.06*1/6 of full length of pole STP SP-23 Pole(0.9*0.6*1/6*8.5=0.76 cum per pole
61
-
100
... More
Excavation of earth for pole pit of size 0.9*.06*1/6 of full length of pole STP SP-21 Pole(0.9*0.6*1/6*8.5=0.76 cum per pole
31
-
100
... More
Errection of STP SP-23 Pole in proper level and alingnment alongwith fixing of all accessories, as per RESPO construction manual.
10
-
100
... More
Errection of STP DP-23 Pole in proper level and alingnment alongwith fixing of all accessories, as per RESPO construction manual.
35
-
100
... More
Errection of STP SP-21 Pole in proper level and alingnment alongwith fixing of all accessories, as per RESPO construction manual.
40
-
100
... More
Grouting of STP SP-23 pole in size 0.45*0.45*1/9 of the support in cc ratio 1:4:8(1cement :4 graded stone 20mm nominal size :8 coarse sand) block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment ,leve;ing as per RESPO constuction Manual.(0.45*0.45*1/9*8.5=0.191 cum per pole
15
-
100
... More
Grouting of STP SP-21 pole in size 0.45*0.45*1/9 of the support in cc ratio 1:4:8(1cement :4 graded stone 20mm nominal size :8 coarse sand) block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment ,leve;ing as per RESPO constuction Manual.(0.45*0.45*1/9*8.5=0.191 cum per pole
8
-
100
... More
Muffing of poles size0.45cm*0.60cm radius with CC 1:3:6(1 cement:3 coarse sand :6 graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement ,stone and sand etc.
120
-
100
... More
Excavation of earth for stay of size 0.6*0.6*1.2 mtr in all type of soil including pro[per dressing of sides and ramming of bottom including getting out the excavated soil and disposl of surplus excavated soil as directed complete work. (0.6*0.6*1.2 mtr =0.432 cum per stay )
82
-
100
... More
Fixing tighting and nozzeling of stay with pole and stay rod on required tension as per drawing/RESPO manual
190
-
100
... More
Grouting of stay in size 0.6*0.6*0.3 in CC ratio 1:4:8( 1 cement :4 graded stone 20mm nominal size :8 coarse sand ) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment,leveling as per RESPO manual.(0.6*0.6*0.3=0.108cum per stay )
21
-
100
... More
Earthing of support with M.S .Earth rod of 2.5 mtr long including excavation of pit and digging of M.S. Rod to depth and connecting the earth electrode with the help of G.I. Wire as per construction manual
64
-
100
... More
Mounting of T/F 11/0.4 KV 25 KVA
12
-
100
... More
Mounting of T/F 11/0.4 KV 63 KVA
2
-
100
... More
Mounting of T/F 11/0.4 KV 100 KVA
1
-
100
... More
Fixing of TPMO
15
-
100
... More
Fixing of LA
15
-
100
... More
T-off connection complete 11KV line
15
-
100
... More
Laying, spreading, stinging and sagging of ACSR Rabbit 11 KV complete with binding and jumpering
3
-
100
... More
Laying, spreading, stinging and sagging ofLT 3 Phase 4 Wire complete with binding and jumpering
2
-
100
... More
Laying, spreading, stinging and sagging ofLT 1 Phase 2 Wire complete with binding and jumpering
1
-
100
... More
Route clearance by cutting of Tree braches/lopping and chopping of trees