Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date24 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 14,95,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Holding clamp for SP-23 with N&B

243

-

100

... More
Stay ClampSP-21 with N&B

252

-

100

... More
Bracing clamp for SP-23 with nut & bolt (Top)

100

-

100

... More
Bracing clamp for SP-23 with nut & bolt (Bottom)

100

-

100

... More
Stay clamp for SP-23 with D/E with N&B

120

-

100

... More
LT Clamp SP-21 with N&B

242

-

100

... More
Earth wire clamp for SP-23 with nut & bolt

60

-

100

... More
LABOUR CHARGE

-

-

-

... More
Cartage of STP SP-23 Pole

80

-

100

... More
Cartage of STP SP-21 Pole

40

-

100

... More
Cartage of Small material

90

-

100

... More
Cartage of T/F 11/0.4 KV 25 KVA

12

-

100

... More
Cartage of T/F 11/0.4 KV 63 KVA

2

-

100

... More
Cartage of T/F 11/0.4 KV 100 KVA

1

-

100

... More
Head load Cartage of STP SP-23 Pole

80

-

100

... More
Head load Cartage of STP SP-21 Pole

40

-

100

... More
Head load Cartage of Small material

90

-

100

... More
Head load Cartage T/F 11/0.4 KV 25 KVA

12

-

100

... More
Head load CartageT/F 11/0.4 KV 63 KVA

2

-

100

... More
Head load Cartage T/F 11/0.4 KV 100 KVA

1

-

100

... More
Fabrication of MS Chanel,Angle iron after cutting in required size with drilling of holes upto good finish for top channel,bracing and special type bracket etc as per RESPO schedule & local approved drawing.

2505

-

100

... More
Excavation of earth for pole pit of size 0.9*.06*1/6 of full length of pole STP SP-23 Pole(0.9*0.6*1/6*8.5=0.76 cum per pole

61

-

100

... More
Excavation of earth for pole pit of size 0.9*.06*1/6 of full length of pole STP SP-21 Pole(0.9*0.6*1/6*8.5=0.76 cum per pole

31

-

100

... More
Errection of STP SP-23 Pole in proper level and alingnment alongwith fixing of all accessories, as per RESPO construction manual.

10

-

100

... More
Errection of STP DP-23 Pole in proper level and alingnment alongwith fixing of all accessories, as per RESPO construction manual.

35

-

100

... More
Errection of STP SP-21 Pole in proper level and alingnment alongwith fixing of all accessories, as per RESPO construction manual.

40

-

100

... More
Grouting of STP SP-23 pole in size 0.45*0.45*1/9 of the support in cc ratio 1:4:8(1cement :4 graded stone 20mm nominal size :8 coarse sand) block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment ,leve;ing as per RESPO constuction Manual.(0.45*0.45*1/9*8.5=0.191 cum per pole

15

-

100

... More
Grouting of STP SP-21 pole in size 0.45*0.45*1/9 of the support in cc ratio 1:4:8(1cement :4 graded stone 20mm nominal size :8 coarse sand) block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment ,leve;ing as per RESPO constuction Manual.(0.45*0.45*1/9*8.5=0.191 cum per pole

8

-

100

... More
Muffing of poles size0.45cm*0.60cm radius with CC 1:3:6(1 cement:3 coarse sand :6 graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement ,stone and sand etc.

120

-

100

... More
Excavation of earth for stay of size 0.6*0.6*1.2 mtr in all type of soil including pro[per dressing of sides and ramming of bottom including getting out the excavated soil and disposl of surplus excavated soil as directed complete work. (0.6*0.6*1.2 mtr =0.432 cum per stay )

82

-

100

... More
Fixing tighting and nozzeling of stay with pole and stay rod on required tension as per drawing/RESPO manual

190

-

100

... More
Grouting of stay in size 0.6*0.6*0.3 in CC ratio 1:4:8( 1 cement :4 graded stone 20mm nominal size :8 coarse sand ) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment,leveling as per RESPO manual.(0.6*0.6*0.3=0.108cum per stay )

21

-

100

... More
Earthing of support with M.S .Earth rod of 2.5 mtr long including excavation of pit and digging of M.S. Rod to depth and connecting the earth electrode with the help of G.I. Wire as per construction manual

64

-

100

... More
Mounting of T/F 11/0.4 KV 25 KVA

12

-

100

... More
Mounting of T/F 11/0.4 KV 63 KVA

2

-

100

... More
Mounting of T/F 11/0.4 KV 100 KVA

1

-

100

... More
Fixing of TPMO

15

-

100

... More
Fixing of LA

15

-

100

... More
T-off connection complete 11KV line

15

-

100

... More
Laying, spreading, stinging and sagging of ACSR Rabbit 11 KV complete with binding and jumpering

3

-

100

... More
Laying, spreading, stinging and sagging ofLT 3 Phase 4 Wire complete with binding and jumpering

2

-

100

... More
Laying, spreading, stinging and sagging ofLT 1 Phase 2 Wire complete with binding and jumpering

1

-

100

... More
Route clearance by cutting of Tree braches/lopping and chopping of trees

2

-

100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.