Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Energy, Oil and Gas
Electrical and Electronics
Electrical Works
Eprocure
Opening Date4 Mar 2025
Closing Date17 Mar 2025
Tender Amount₹ 2,10,00,000
AI Insights
Technical
Technical
Financial
Class Of Bidder
... View More
Class A Electrical Contractor license is the required class eligibility for bidders to participate.
Bid Capacity
... View More
The bid capacity required in the given tender to bid has multiple values and formulas. 1. Minimum Annual Average Turnover (MAAT): The MAAT of the bidder should not be less than Rs. 4,00,00,000.00.
2. Liquid Assets (LA): LA should not be less than 40% of the estimated cost.
3. Net Worth: The Net Worth of the bidder should be at least 20% of the estimated cost.
4. Bid capacity required = 10% of contract value, which can be broken down into: - Performance security = 5% of contract value - Deduction from bills = 5% of contract value
Technical Capacity
... View More
The required prior work experience for the bidder includes similar works performed as a Turnkey contractor over the previous five years, with details such as Project Name, Name of Employer, Description of work undertaken, Contract No., Length of 33 KV line erected, No. of 33/11kV S/s erected, Value of contract, Date work order issued, Stipulated period of completion, Actual completion date, and Remarks. The bidder must have successfully executed at least one No. LT/11 kV or higher voltage class Works on turnkey basis for any Govt. Department / SEBs /Power Sector Utilities / Govt. Undertaking during the last five years as on the date of bid opening and which must be in satisfactory operation for at least one year as on the date of bid opening. However, specific values or percentages of similar works completed are not mentioned. The bidder should have experience in executing similar turnkey contracts (nature and volume) for each of the last five years. The bidder's financial requirements include a Minimum Annual Average Turnover (MAAT) of 4,00,00,000.00 for the last three financial years, Liquid Assets (LA) of at least 40% of the estimated cost, and Net Worth of at least 20% of the estimated cost. No specific amount or percentage of similar works completed is mentioned, except for the financial requirements.
Costs
EMD
₹ 4,96,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Replace Of Bare Conductor Into Ab Cable At Diff. Village/area In 11 Kv Basot Feeder Under 33/11 Kv S/s Bhikiyasain Under Edd, Bhikiyasain On Turnkey Basis
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPCL9_81014_1Tender No
EDC(R)-68/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthing Rod MS 20x2500 mm
344
-
-
... More
GI wire 5mm/6 SWG
172
-
-
... More
Stay Set GI 16x1800 mm
240
-
-
... More
Stay Wire GI 7/3.15 mm 7/10 SWG
1440
-
-
... More
LT XLPE Cable 1 x 70 Sq.mm
3882
-
-
... More
NON-CENTRALIZED MATERIAL (SUPPLY)
-
-
-
... More
LT Clamp with N&B ST Pole SP-10
1156
-
-
... More
Suspension Clamp EYE Hook LT ABC Cable
694
-
-
... More
Dead end clamp with I Hook
462
-
-
... More
Stay Insulator
240
-
-
... More
Stay Clamp with N&B
240
-
-
... More
PG Clamp
1264
-
-
... More
Piercing Connector 35 Sq.mm-25 Sq.mm
3083
-
-
... More
LT AB Cable 3Cx50 + 1x35 Sq.mm
36970
-
-
... More
LT AB Cable 3x120 + 1x95 + 1x16 Sq.mm
4300
-
-
... More
LT Distribution Box 1 Phase
615
-
-
... More
LT Distribution Box 3 Phase
647
-
-
... More
AL Crimping Type LUGS 25 Sq.mm
2588
-
-
... More
MS Half Clamp for LT Distribution Box
2524
-
-
... More
LABOUR PART
-
-
-
... More
Erection of Earthing Rod
344
-
-
... More
Excavation of Pit for stay set
43.22
-
-
... More
Erection of LT Stay Set
240
-
-
... More
Grouting of Stay set
25.92
-
-
... More
Excavation of Pit for Pole
45.36
-
-
... More
Erection of Single SP-10 Pole
40
-
-
... More
Erection of Single SP-21 Pole
23
-
-
... More
Grouting of Pole
11.34
-
-
... More
Muffing of Pole
63
-
-
... More
Dismantling of LT line 1 P 2 W (Weasel)
25.67
-
-
... More
Dismantling of LT line 2 P 3 W (Weasel)
6.9
-
-
... More
Dismantling of LT line 3 P 4 W (Weasel)
3.4
-
-
... More
Dismantling of LT line 3 P 5 W (Weasel)
5.3
-
-
... More
Painting of SP-10 Pole
60
-
-
... More
Painting of SP-21/23 Pole
48
-
-
... More
Headload Cartage SP-10 Pole (1-3 Km)
45
-
-
... More
Headload Cartage SP-21/23 Pole (1-3 Km)
17
-
-
... More
Laying of LT XLPE ABC 3x120+1x95+1x16 Sq.
4300
-
-
... More
Installation of LT Dist Box 1 Ph for LT AB
615
-
-
... More
Installation of LT Dist Box 3 Ph for LT AB Cab
647
-
-
... More
Disconnection & Reconnection of Consumer
975
-
-
... More
Laying & Fixing LT XLPE Cable
3882
-
-
... More
Fixing of Suspension Clamp with I Hook
694
-
-
... More
Erection of Dead end Clamp
462
-
-
... More
Laying of LT AB Cable 3C x 50 + 1 x 35
36970
-
-
... More
Erection of Stay Clamp
240
-
-
... More
Fixing of Piercing Connector 50-25 Sqmm
3083
-
-
... More
Fixing of PG Clamp 70-25 Sq.mm
1264
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%