Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Eprocure
Opening Date3 Sep 2021
Closing Date23 Sep 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Head Load Cartage of Small materials including loading and unloading, lead distance 4 km

14.72

-

650

... More
Excavation of earth of pole pit of size 0.9x0.6x1/6 of full length of pole for errection of pole in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (0.765x13=9.945cum)

11.48

-

250

... More
Erection of following Single Support Pole of SP-23 in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual.

3

-

600

... More
Erection of following Double Support Pole of SP-23 in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual.

6

-

1500

... More
Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual.(0.191*15=2.865)

2.87

-

4800

... More
Muffing of poles size 0.45x0.60 cm radious with cc 1:3:6 block size 45 cm height from ground level including cost of cement, stone and sand etc.

15

-

564

... More
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (0.432x20=11.34 cum) (old & new)

11.34

-

250

... More
Fixing, Tightneing and nozzling of stay with pole and stay rod on required tension as per drawing/RESPO Norms.

20

-

500

... More
Grouting of stay in size 0.6x0.6x0.3 in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual. (0.108X20=2.16)

2.16

-

4800

... More
Fabrication of MS Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESPO shedule and local approved drawing

310

-

20

... More
Earthing of support with MS earth rod of 2.5 mtr long by hammaring of of MS earth rod to proper depth and connecting the earth electrode with the help of GI wire as per RESPO Manual.

4

-

600

... More
Dismentaling of existing HT Line, including disc fitting, insulator, clamps, Nut & Bolts. Single Pole SP-23

1

-

1000

... More
Dismentaling of existing HT Line, including disc fitting, insulator, clamps, Nut & Bolts. Double Pole SP-23

3

-

1800

... More
Lopping/Chopping of Tree Branches for Root Clearence

1

-

1100

... More
Laying, Spreading, Stringing & Sagging of 11KV Line in 3 Phase(3 phase 4 wire) of the following wire as phase wire GI earh wire complete including fixing of all accessories in 3 nos conductor in parallel with binding and jumpering as per profile and sagging chart. ACSR Rabbit

1.2

-

16500

... More
Cartage of ST Pole from store centre to construction site with Loading, Unloading at both points and proper stacking. Lead Distance 42 km ST Pole SP-10

6

-

530

... More
Cartage of ST Pole from store centre to construction site with Loading, Unloading at both points and proper stacking. Lead Distance 42 km ST Pole SP-21

4

-

530

... More
Cartage of other small material by vehicle from store centre to nearest construction site store including Loading and Unloading at both ends.

4.52

-

390

... More
Head load cartage of following Poles from road to site. Lead Distance 4 km ST Pole SP-10

6

-

650

... More
Head load cartage of following Poles from road to site. Lead Distance 4 km ST Pole SP-21

4

-

750

... More
Head Load Cartage of Small materials including loading and unloading. Lead Distance 4 km

4.52

-

650

... More
Excavation of earth of pole pit of size 0.9x0.6x1/6 of full length of pole for errection of pole in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. ST Pole SP-10(0.718x14=10.052)

10.05

-

250

... More
Excavation of earth of pole pit of size 0.9x0.6x1/6 of full length of pole for errection of pole in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. ST Pole SP-21(0.765X9=6.885)

6.89

-

250

... More
Erection of following Single Support Pole in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual. ST Pole SP-10

14

-

500

... More
Erection of following Single Support Pole in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual. ST Pole SP-21

9

-

550

... More
Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual. ST Pole SP-10(0.178x14=2.492)

2.49

-

4800

... More
Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual. ST Pole SP-21(0.191X9=1.719)

1.72

-

4800

... More
Muffing of poles size 0.45x0.60 cm radious with cc 1:3:6 block size 45 cm height from ground level including cost of cement, stone and sand etc.

23

-

564

... More
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (0.432x12=5.184 cum)

5.18

-

250

... More
Fixing, Tightneing and nozzling of stay with pole and stay rod on required tension as per drawing/RESPO Norms.

12

-

500

... More
Grouting of stay in size 0.6x0.6x0.3 in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual.

1.3

-

4800

... More
Earthing of support with MS earth rod of 2.5 mtr long by hammaring of of MS earth rod to proper depth and connecting the earth electrode with the help of GI wire as per RESPO Manual.

4

-

600

... More
Dismentaling of existing LT Line, including insulator, clamps, Nut & Bolts.ST Pole SP-10

8

-

900

... More
Dismentaling of existing LT Line, including insulator, clamps, Nut & Bolts. ST Pole SP-21

5

-

1000

... More
Laying, Spreading, Stringing & Sagging of LT lines of the following wire as phase wire GI earh wire complete with binding and jumpering as per RESPO Norms. 3 phase 4 wire

0.54

-

15500

... More
Laying, Spreading, Stringing & Sagging of LT lines of the following wire as phase wire GI earh wire complete with binding and jumpering as per RESPO Norms. 1 phase 2 wire

0.48

-

7700

... More
Cartage of the following capacity of transformers from store centre to construction site with loading and unloading at both points T/F 11/0.4 KV 63 KVA

1

-

4000

... More
Cartage of other small material by vehicle from store centre to nearest construction site store including Loading and Unloading at both ends. Other small materials

2.58

-

390

... More
Head Load Cartage of Small materials including loading and unloading.

2.58

-

350

... More
Head load cartage of following transformers along with loading/unloading at both points. T/F 11/0.4 KV 63 KVA

1

-

3000

... More
Mounting/Fixing of Fuse set on double pole structure including making of connection complete work

1

-

3000

... More
Mounting/Fixing of Lightning arrestor set (3 nos.) on Double pole structure including making all connections by GI strip size 35x6 mm to earth point(including cost of GI Strip).

1

-

2200

... More
Installation of new transformer on Double pole struture plinth and fixing of channel etc. and making all connection of HT and LT side and its complete commissioning. 63 KVA

1

-

2400

... More
Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contrector), connecting the same with GI strip(to be supplied by contrector) of size 35x6mm for a minium length 6m, treatment of soil with highly conductive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in MB before and after installation of earthing . The earth resistance after earthing should be less then 1 Ohm.

2

-

12500

... More
Earthing of support with MS earth rod of 2.5 mtr long by hammaring of of MS earth rod to proper depth and connecting the earth electrode with the help of GI wire as per RESPO Manual.

5

-

600

... More
Laying and errection of LT PVC Cable including crimping of lugs of size 1x70 sqmm(including cost of material)

60

-

25

... More
Providing and fixing of danger Board complete by providing clamps of MS Flat 50x6mm and nuts & bolts, Danger Boards of MS Sheet 2 mm thick 11''x7'' size (including cost of all material).

1

-

525



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.