Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date19 Sep 2024
Closing Date7 Oct 2024
Tender AmountRefer Documents
Costs
EMD
₹ 75,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Increasing Capacity Of Dtr At Various 11 Kv Feeder Emanating From 33/11 Kv S/s Lalpur Under Edd Kichha
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL3_76058_1Tender No
EDC(USN)22/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bott om including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
20
-
-
Fixing,tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in LT line.
10
-
-
Fixing,tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in 11 KV Line.
10
-
-
Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand) block includ ing cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
20
-
-
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work.
40
-
-
Erection of PCC single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual
22
-
-
Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel& clamps a s per RESPO manual
2
-
-
Erection of PCC double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual
4
-
-
Erection of Sp-55 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual
4
-
-
Excavation of earth of size 2.1x2.1x1.2 meter of DTR Plinth
27
-
-
Cement concreting work in ratio 1:4:8 of DTR Plinth
27
-
-
Brick work in 1:4 ratio of DTR Plinth
27
-
-
RCC Work of 1:2:4 ratio 15 cm thickness of DTR Plinth
27
-
-
Cement Plaster on side walls in 1:4 ratio of DTR Plinth
13.5
-
-
Installation/mounting of new 100 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning.
20
-
-
Installation/mounting of new 63 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
15
-
-
Installation / mounting of new 400 KVA/500 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning.
6
-
-
Installation / mounting of new 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
6
-
-
Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Weasel as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart.
0.5
-
-
Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(3 phase 4 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn
1.2
-
-
Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(2 phase 3 wire) with G.I. earth wire complete with binding and jumpering as per RESSPO Specn
1.35
-
-
Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line.
3
-
-
Cartage of PCC Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21- 50 Km)
30
-
-
Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km)
10
-
-
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km)
50
-
-
Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km)
15
-
-
Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km)
20
-
-
Cartage of the 250 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km)
6
-
-
Cartage of the 400/500 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21 -50 Km)
6
-
-
Headload cartage of PCC Pole from road to site(distance 0-1 Km)
30
-
-
Headload cartage of SP-55 Pole from road to site(distance 0-1 Km)
10
-
-
Head load cartage of small material(distance 0-1 Km)
50
-
-
Headload cartage of 63 KVA transformer from road to site(distance 0-1 Km)
15
-
-
Headload cartage of 100 KVA transformer from road to site(distance 0-1 Km)
20
-
-
Headload cartage of 250 KVA transformer from road to site(distance 1-3 Km)
6
-
-
Headload cartage of 400 KVA transformer from road to site(distance 0-1 Km)
6
-
-
Digging of Pit through Hammer at CC, DAMAR Road
40
-
-
Providing/Supplying and Fixing of FRP Fencing and Fixing at Proper Position with fixing of Door as per Require for CSS with Complete Civil Work.
108
-
-
Laying of 1x120 Sq.mm XLPE Cable
1400
-
-
Laying and erection of L.T. XLPE Cable lx240 mm2 (Al.) including crimping of lugs of size I x240 mm2
480
-
-
Painting of Frame/Ladder/Stair/ Railing as per director of Engineer in Charge
108
-
-
Transportation Charges of 25 KVA from contractor works to UPCL site/Store Center including packing, forwarding, loading, unloading, stacking and transit insurance.
12
-
-
Transportation Charges of 63 KVA from contractor works to UPCL site/Store Center including packing, forwarding, loading, unloading, stacking and transit insurance.
15
-
-
Transportation Charges of 100 KVA from contractor works to UPCL site/Store Center including packing, forwarding, loading, unloading, stacking and transit insurance.
6
-
-
Transportation Charges of 250 KVA from contractor works to UPCL site/Store Center including packing, forwarding, loading, unloading, stacking and transit insurance.
6
-
-
Annexure-B (SUPPLY ITEMS)
-
-
-
Supply of MS Holding Clamps
20
-
-
Supply of LT Clamp for PCC Pole with N&B
104
-
-
Supply of Stay Clamp off size
20
-
-
Supply of M.S. Half Clamps for fixing of Fuse set
24
-
-
Supply of Double Pole Clamps with N&B for PCC Pole
30
-
-
Supply of Double Pole Clamps with N&B for STP SP-55 Pole
10
-
-
Supply of Shackle Insulator 75x90 mm with N&B
120
-
-
Supply of CU strip 45x5 mm
188
-
-
Supply of Al. Crimping Type Lugs 120 Sq.mm
140
-
-
Supply of Al. Crimping Type Lugs 400 Sq.mm
24
-
-
Supply of Al. Crimping Type Lugs 240 Sq.mm
24
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements