Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Eprocure
Opening Date7 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 16,85,000
Costs
EMD
₹ 51,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Incresing Capacity Of 02 Nos T/f 100 Kva To 250 Kva At Kanda Paraw And Convart Bair Conductor To Abc Of Vijaypur Section Under Edd Bageshwar
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL9_76643_1Bid Award Id
ViewTender No
EDC(R)-32/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
E-CLAMP FOR 11KV
12
-
-
... More
PG CLAMP 70-70 SQ.mm.
6
-
-
... More
STAY CLAMP FOR SP23 DOUBLE END
6
-
-
... More
Holding Clamp For Gaurding
8
-
-
... More
Holding Clamp SP33 wit N&B
30
-
-
... More
PG Line to Distribution Box 25 to 25 mm
20
-
-
... More
PG CLAMP 95-25 SQ.mm.
25
-
-
... More
PG CLAMP 95-95 SQ.mm.
6
-
-
... More
Top Chennel Clamp For SP-23 With N&B
26
-
-
... More
EARTH WIRE CLAMP FOR SP-23 WITH N/B
5
-
-
... More
PG Clamp Rabbit to Rabbit
36
-
-
... More
Suspension Clamp with J Hook
110
-
-
... More
Stay Clamp S/E for SP23 With N&B
6
-
-
... More
Stay Clamp S/E for SP23 With N&B
42
-
-
... More
Stay Clamp D/E for SP23 With N&B
15
-
-
... More
MS CLAMP SP-33 WITH N/B FOR DEAD END
10
-
-
... More
MS CLAMP SP-33 WITH N/B FOR SUSP.CLAMP
110
-
-
... More
Mid Span Insulator J.sleeve for LT ABC
10
-
-
... More
STAY INSULATOR
42
-
-
... More
J-HOOK
8
-
-
... More
Piercing connector for 95 Sqmm-70Sqmm.
20
-
-
... More
Piercing connector for 95 Sqmm-120Sqmm.
180
-
-
... More
BRACING CLAMP TOP FOR SP-23 WITH N/B
6
-
-
... More
BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
6
-
-
... More
Piercing Connector for 120-95 mm2
60
-
-
... More
ACB Type Complete LT DB for 50 KA
2
-
-
... More
LT DISTRUBITON BOX 3 PHASE
55
-
-
... More
LABOUR PART (WORK)
-
-
-
... More
CHEMICAL EARTHING
6
-
-
... More
ERECTION OF EARTHING ROD
20
-
-
... More
FABRICATION OF STEEL
716
-
-
... More
EXCAVATION OF PIT FOR STAY SET
26.35
-
-
... More
ERECTION OF LT STAY SET
42
-
-
... More
ERECTION OF 11KV STAY SET
18
-
-
... More
GROUTING OF STAY SET
6.59
-
-
... More
EXCAVATION OF PIT FOR POLE
51.45
-
-
... More
ERECTION OF SINGLE SP-23 POLE
1
-
-
... More
ERECTION OF SINGLE SP-33 POLE
55
-
-
... More
ERECTION OF SP-23 DOUBLE POLE
4
-
-
... More
GROUTING OF POLE
12.85
-
-
... More
MUFFING OF POLE
64
-
-
... More
DISMANTLING OF SP-10 SINGLE POLE
4
-
-
... More
DISMANTLING OF SP-21/SP-23 SINGLE POLE
8
-
-
... More
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
1.5
-
-
... More
DISMANTLING OF 100 KVA DTR
2
-
-
... More
PAINTING OF SP-21/23 POLE
9
-
-
... More
PAINTING OF SP-33 POLE
55
-
-
... More
LAYING OF LT PVC CABLES(150 SQMM)
120
-
-
... More
EXCAVATION OF EARTH FOR DTR PLAINTH
10.58
-
-
... More
CEMENT CONCRETING WORK DTR PLINTH
10.58
-
-
... More
BRICK WORK IN 1:4 RATIO DTR PLINTH
10.58
-
-
... More
RR MASSONARY WORK FOR DTR PLINTH
10.58
-
-
... More
RCC WORK OF DTR PLINTH.
10.58
-
-
... More
CEMENT PLASTER ON DTR PLINTH
8.82
-
-
... More
FENCING OF DTR
15.18
-
-
... More
INST.OF 250 KVA DTR ON PLINTH
2
-
-
... More
FIXING OF TPMO
2
-
-
... More
FIXING OF FUSE SET
2
-
-
... More
FIXING OF LIGHTNING ARRESTOR
2
-
-
... More
ERECTION OF BRACKET IN LT LINE
15
-
-
... More
LAYING OF RABBIT CONDUCTOR IN HT LINE
0.45
-
-
... More
GUARDING OF LT/11 KV LINE
2
-
-
... More
T-OFF CONNECTION COMPLETE 11 KV LINE
1
-
-
... More
CONST.INST.OF DANGER BOARD/NUMBER PLATE
5
-
-
... More
LAYING OF AB CABLE OF SIZE 120 SQMM
4635
-
-
... More
CARTAGE SP-21/23 POLE,71-100 KM
9
-
-
... More
CARTAGE SP-33 POLE,71-100 KM
55
-
-
... More
CARTAGE OF PETTY MATERIAL,0-20 KM
1.22
-
-
... More
CARTAGE OF PETTY MATERIAL,71-100 KM
50.67
-
-
... More
CARTAGE OF 100 KVA DTR,0-20 KM
2
-
-
... More
CARTAGE OF 250 KVA DTR,71-100 KM
2
-
-
... More
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
9
-
-
... More
HEADLOAD CARTAGE SP-33 POLE(0-1 KM)
55
-
-
... More
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
51.89
-
-
... More
HEADLOAD CARTAGE OF 100 KVA DTR(0-1 KM)
2
-
-
... More
HEADLOAD CARTAGE OF 250 KVA DTR(0-1 KM)
2
-
-
... More
DISMANTLING OF DAM. LT BRACKET FROM POLE
2
-
-