Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Electrical and Electronics
Eprocure
Opening Date15 Apr 2021
Closing Date22 Apr 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of 11 KV sectionizer

1

-

5000

... More
Dismantling of Stay rod

1

-

200

... More
Dismantling of TPMO/fuse set from DP structure

1

-

1000

... More
Dismantling of wire mesh fensing of DTR 630 KVA,400 KVA/250 KVA

1

-

500

... More
Dismantling of existing Line HT/LT line including MS Channel,angle,disc fitting,insulator,clamps,nut and bolts and consumer connections and street light connections etc includng rolling of conductor.

-

-

-

... More
Single Pole

-

-

-

1

-

550

1

-

700

1

-

700

1

-

750

1

-

850

... More
Rail 90 lbs/105 lbs/ Joist

1

-

1000

... More
PCC pole

1

-

600

1

-

950

... More
Double pole

-

-

-

1

-

1300

1

-

1400

1

-

1750

... More
Rail 90 lbs/105 lbs

1

-

1750

... More
PCC pole

1

-

1300

1

-

1950

... More
Four pole

-

-

-

1

-

2600

1

-

2800

1

-

2800

... More
Rail 90 lbs/105 lbs

1

-

2800

1

-

3150

... More
33 KV line with earth wire

-

-

-

... More
ACSR Weasel

1

-

3400

... More
ACSR rabbit

1

-

4000

... More
ACSR Raccoon

1

-

4500

... More
ACSR Dog

1

-

5500

... More
11 KV line with earth wire

-

-

-

... More
ACSR Weasel

1

-

3400

... More
ACSR rabbit

1

-

4000

... More
ACSR Raccoon

1

-

4500

... More
ACSR Dog

1

-

5500

... More
LT line (ACSR Weasel)

-

-

-

... More
3P5W conductor

1

-

3400

... More
3P4W conductor

1

-

2600

... More
2P3W conductor

1

-

2000

... More
1P2W conductor

1

-

1200

... More
ACSR rabbit

-

-

-

... More
3P5W conductor

1

-

4000

... More
3P4W conductor

1

-

3400

... More
2P3W conductor

1

-

2500

... More
1P2W conductor

1

-

1800

... More
ACSR Raccoon

-

-

-

... More
3P5W conductor

1

-

4500

... More
3P4W conductor

1

-

3700

... More
2P3W conductor

1

-

3100

... More
1P2W conductor

1

-

2200

... More
ACSR Dog

-

-

-

... More
3P5W conductor

1

-

5500

... More
3P4W conductor

1

-

4400

... More
2P3W conductor

1

-

3400

... More
1P2W conductor

1

-

2400

... More
Dismantling of guarding of

-

-

-

... More
LT line

1

-

300

... More
11KV line

1

-

600

... More
33 KV line

1

-

850

... More
Dismantling of DTR from DP/Plinth including opening of all connectors circuits and earthig strips, LTDB etc

-

-

-

... More
630 KVA/500 KVA

1

-

3200

... More
400 KVA

1

-

3000

... More
250 KVA

1

-

2500

... More
160 KVA

1

-

2000

... More
100 KVA

1

-

1800

... More
63 KVA

1

-

1500

1

-

1200

... More
Carriage of following material from road site to JE store distance approx 0 Km to 1 Km.

-

-

-

... More
ST Pole 8.5 mtr long SP-10

1

-

220

... More
ST Pole 8.5 mtr long SP-21

1

-

310

... More
ST Pole 8.5 mtr long SP-23

1

-

310

... More
ST Pole 8.5 mtr long SP-33

1

-

360

... More
ST Pole 8.5 mtr long SP-55

1

-

475

... More
ST Pole 8.5 mtr long SP-72

1

-

600

... More
Rail 90 lbs/105 lbs

1

-

1750

... More
Other Stock Material

1

-

250

... More
Carriage of following material from JE store to store center distance approximate 0-20 km. with loading & unloading complete:-

-

-

-

... More
ST Pole 8.5 mtr long SP-10

1

-

360

... More
ST Pole 8.5 mtr long SP-21

1

-

360

... More
ST Pole 8.5 mtr long SP-23

1

-

360

... More
ST Pole 8.5 mtr long SP-33

1

-

370

... More
ST Pole 8.5 mtr long SP-55

1

-

420

... More
ST Pole 8.5 mtr long SP-72

1

-

630

... More
Rail 90 lbs/105 lbs

1

-

1750

... More
Other Stock Material

1

-

300

... More
Carriage of following capacity transformers from site/ JE store to store center distance approximate 0-20 km. With loading & unloading complete:-

-

-

-

... More
630/500 KVA

1

-

4500

... More
400 KVA

1

-

4200

... More
250 KVA

1

-

3800

... More
160/100 KVA

1

-

2600

... More
63/25 KVA

1

-

2200

... More
Excavaton of foundation pit of Size 0.9x0.6x1/5TH length of pole in mixed soil of L.T/HT Support as per UPCL construction manual

-

-

-

... More
STP 11 mtr long SP-55

1

-

550

... More
STP 8.5 mtr long SP-23

1

-

550

... More
STP 8.5 mtr long SP-21

1

-

550

... More
STP 9 mtr long SP-33

1

-

550

... More
STP 13 mtr long SP-72

1

-

550

... More
Shifting and erection of LT/HT Support including excavation and grouting as per UPCL Construction manual.

-

-

-

... More
single ST pole SP-21/SP-23/SP-33

1

-

1850

... More
single ST pole SP-55/SP-72

1

-

2300

... More
double pole SP-23/SP-33

1

-

4200

... More
double pole SP-55/SP-72

1

-

4800

... More
Grouting of S.T pole as per RESPO with UPCL Construction manual.

1

-

1850

... More
Erection of Stay set 16x1800 mm including excavation and grouting of & Stay wire 7/10 SWG

1

-

1250

... More
Remounting of 990 KVA CSS on new angle channel temporary plinth Plinth/Base whole constructed by the contractor incliding loading and unloading with laying of cable and making of all HT and LT circuit connections including earthing complete Job .

1

-

90000

... More
Remounting of T/F on Double pole including making of all connections,mounting of base channel,fuse set ,TPMO,LT fuse also includes manual cartage of TF with loading and unloading

-

-

-

... More
630/500 KVA

1

-

16480

... More
400/250KVA

1

-

16480

... More
100/63/25KVA

1

-

11200

... More
Laying spreading stringing and sagging of 11 KV/33 KV line in 3P4W of following wire as phase wire including fixing of all accessories in 3 No. conductor in parallel with binding and jumpering.

-

-

-

... More
Weasel/Rabbit

1

-

14000

1

-

23000

... More
Laying spreading stringing and sagging of LT lines of the following wire complete with binding and jumpering .

-

-

-

... More
ACSR Rabbit

-

-

-

... More
3P5W conductor

1

-

17500

... More
3P4W conductor

1

-

14000

... More
ACSR Weasel

-

-

-

... More
3P5W conductor

1

-

15600

... More
3P4W conductor

1

-

12500

... More
ACSR Dog

-

-

-

... More
3P5W conductor

1

-

28700

... More
3P4W conductor

1

-

23000

... More
Laying sagging and binding of AB cable of size upto 120 sq mm including mountig of all concerned accessories complete job.

1

-

24

... More
Dismentling of LT cable as per site requirement of line shifting all type of LT cable complete job 4x16,4x25,3.5x70,3.5x95,1x120,1x150,1x240,1x400 sqmm

1

-

50

... More
Remounting/mounting of LT cable including laying sagging and stringing on new location/path as per site requirement of line shifting all type of LT cable complete job 4x16,4x25,3.5x70,3.5x95,1x120,1x150,1x240,1x400 sqmm

1

-

180

... More
Dismentling of HT cable as per site requirement of line shifting complete job .3x35,3x70,3x90,3x120,3x240 sqmm .

1

-

60

... More
Remounting/mounting of HT cable including laying sagging and stringing on new location/path as per site requirement of line shifting complete job .3x35,3x70,3x90,3x120,3x240 sqmm upto 400 sq mm.

1

-

250

... More
Disconnection/dismentling of Service cable from support to consumer end including all type of support per consumer .

1

-

30

... More
Laying of Service cable from support to consumer end including all type of supports per consumer

1

-

40

... More
For under ground job-dismentling of HT/LT from under ground including excavation of land as per site requirement FOR LT 4x16,4x25,3.5x70,3.5x95,1x120,1x150,1x240,1x400 sqmm and for HT.3x35,3x70,3x90,3x120,3x240 upto 400 sq mmsqmm complete job .

1

-

450

... More
For under ground job-relaying/laying of cable including laying sagging on new location/path as per site requirement of line shifting complete job for LT 4x16,4x25,3.5x70,3.5x95,1x120,1x150,1x240,1x400 sqmm and for HT.3x35,3x70,3x90,3x120,3x240 upto 400 sq mmsqmm .

1

-

500

... More
Fabrication of MS Angle/channel

1

-

18

... More
Jointing and fixing of cable jointing kit ID/OD 11 KV

1

-

2500

... More
Jointing and fixing of cable jointing kit ID/OD 33 KV

1

-

3200

... More
Jointing and fixing of Straight through kit 33 KV

1

-

7000

... More
Jointing and fixing of Straight through kit 11 KV

1

-

4000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.