Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Eprocure
Opening Date23 Jul 2024
Closing Date14 Aug 2024
Tender AmountRefer Documents
Costs
EMD
₹ 54,100Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
E Tender No 03/edc(kashipur)/2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL9_73872_1Bid Award Id
ViewTender No
E Tender No 03/EDC(Kashipur)2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of Stay clamp for SP-55 Pole duly Red Oxide Painted with Nut and Bolts and washer. (As per Specification & Drawing of UPCL)
14
-
-
Supply of Suspension Clamps With I Hook. (As Per Specification & Drawing of UPCL)
55
-
-
Supply of M.S Clamp for Distribution Box with nut and bolts and washer. (As Per Specification & Drawing of UPCL)
70
-
-
Supply of M.S Clamp with nut and bolts and washer for Dead End Clamp. (As Per Specification & Drawing of UPCL)
18
-
-
Supply of Dead End Clamps With I Hook. (As Per Specification & Drawing of UPCL)
18
-
-
Supply of Stay Insulator 75x90 mm made of best Quality Pore Line and Without Defeets ISI Standerd. (As per Specification & Drawing of UPCL)
14
-
-
Supply of Shear Head type Insulated Piercing Connector body moulded from high quality mechanical Climate and UV resistant glass reinforced polyamide hot dipped galvanized bolts & contact teeth ABC size 120 Sq mm to 120 sq mm. MAKE- (TYCO/RPG/3M/SICAME/ENSTO)
20
-
-
Supply of M.S Clamp with nut and bolts and washer for Suspension Clamp. (As Per Specification & Drawing of UPCL)
55
-
-
Supply of LT Air Circuit Breaker (ACB) Type Complete LT Distribution Board for 250 KVA Transformer DTR fitted with short cricuit (Current/Time Delay) 100-1000% of 1ct/50-600 m sec and 1 No 800 Amp CT Including Mircroprocessor release IPR-1 manual Opreated Fixed Type (4 Poles as per IS-13947-2 & IEC 60947-2 with Panel and mounting structure). Make (IS Complied Reputed Company)
7
-
-
Supply of SMC Three Phase L.T. Distribution Box for connection of LT consumer With in built Panel Lock with key, Al bus bar RYB 25x6 mm & Al bus bar N 40x6 mm. MAKE- (SINTEX/Other IS Complied Reputed Company)
35
-
-
Supply of Aluminum Lugs 'O' type size 25 mm. (As Per Specification & Drawing of UPCL)
140
-
-
Supply of Aluminium Crimping Lug Size 400 sq mm made of best Quality Pore Line and Without Defeets ISI Standerd. (As per Specification of UPCL)
112
-
-
TF Installation Work
-
-
-
Cartage of Following Material by private truck from store centre Rudrapur /Haldwani/ Kashipur to dump store approx. distance 21 to 50 Km. including loading into truck and unloading at road work site.
-
-
-
ST Pole SP-55
14
-
-
Other Small Line Material
30.2
-
-
250 KVA T/F
7
-
-
Panels
7
-
-
Supply & Installation of Chemical Earthing Completed in direction of Engineer In- Charges Completed works in all respect as per Specification of UPCL.
14
-
-
Fixing of M.S. earthing rod 20×2500 mm for earthing of support as per RESPO drawing No. RES-12 including digging earth rod 0.3 m deep below ground level connected to support with earth wire 16 swg fixing of all accessories in all respect as per Specification of UPCL.
14
-
-
Excavation of earth for Stay set pit of size 0.6x0.6x1.2 Mtr Length in all type of soil including proper dressing of sides and ramming of bottom including getting out soil and disposal of surplus excavation soil as directed complete work in all respect.
6.05
-
-
Erection of 11 KV stay set with pole and stay rod on required tension as per specification of UPCL.
14
-
-
Excavation of Earth for Pole Pit of Size (.9x.6x1/6) of pole length in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and diposal of surplus soil as directed complete work.
19.8
-
-
Erection of Follwing Pole Structure after digging of pit size 0.6×0.6 mtrs & 1/6 length of support on 300×300×75 mm stone pad including fixing with all accessories complete in all respect as per Specification of UPCL.
-
-
-
Double PCC Pole Structure.
7
-
-
Grouting of pole in size (.45x.45x1/9) length of support in CC ratio 1:4:8 (1Cement:4Graded Stone:20mm nomial size:8 coarse sand) Block Including cost of material in all respect.
3.46
-
-
Muffing of pole in size (.45cmx.6cm) radious with CC ratio 1:3:6 (1Cement :3core sand:6 graded stone 10mm nomial size) Block size 45cm height from ground level Including cost of material in all respect.
14
-
-
Installation of New 250 KVA Transformer/Plinth/Double Pole Structure with the help of Chain Pulley/Crain Depending upon the nature of Job at work complete in all respect and Energisation of Transformer.
7
-
-
Laying,Stringing and sagging of LT A.B Cable size (3x120+1x95 sq.mm) complete in all respect as per Specification of UPCL.
7.1
-
-
Fabrication of Channel/angle to Single/Double pole Structure Straight Cross arm T off Top and Dropper, Brecing Channel of M.S. Channel 125x65, 100x50 & M S Angle 65x65x6 mm Cutting and Holling in all respect as per Specification of UPCL.
805
-
-
Labour Charges of Disconnection & Re-Connection of L.T.Consumer Service Connection.as per norms of UPCL.
560
-
-
Installation of ACB with Panel complete work as per specification of UPCL.
7
-
-
Laying of LT XLPE Cable.
672
-
-