Uttarakhand Jal Vidyut Nigam Limited Tender
View complete overview of Uttarakhand UJVN Tender
Uttarakhand Jal Vidyut Nigam Limited - UJVN Tender
Civil And Construction
Eprocure
Opening Date11 Feb 2020
Closing Date12 Mar 2020
Tender Amount₹ 5,41,80,000
Costs
EMD
₹ 13,55,000Document Cost
₹ 23,600Tender Fee
Refer Documents
Summary
01/dgm (shp)/srikot- Srinagar/2019-20
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UJVN_22626_1Bid Award Id
ViewTender No
01/DGM (SHP)/Srikot- Srinagar/2019-20Tender Authority
Uttarakhand Jal Vidyut Nigam Limited ViewPurchaser Address
-Website
http://https://www.uttarakhandjalvidyut.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Remaining Construction works of Forebay, Switchyard and its allied Works of Kaliganga II (2x2.25 MW) SHP in District-Rudraprayag.
Remaining Construction works of Forebay, Switchyard and its allied Works of Kaliganga-II (2X2.25 MW) SHP in District-Rudraprayag.
Remaining Construction works of Forebay, Switchyard and its allied Works of Kaliganga-II (2X2.25 MW) SHP in District-Rudraprayag.
BOQ Items
... More
P.C.C grade M 10
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size).
179
-
7463.76
... More
P.C.C grade M 15
Providing and laying in position cement concrete of specified grade of 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size). excluding the cost of centring and shuttering--All work upto plinth level stone aggregate 20 mm nominal size).including supply of all materials, labour and T & P etc . Required for proper compelition of the work.
122
-
7643.76
... More
RCC M20 in substructure including all material,labour, T&P and centering or shuttering etc as per direction of Engineer-in-Charge.
371
-
10344
... More
RCC M20 in superstructure including all material,labour, T&P and centering or shuttering etc as per direction of Engineer-in-Charge. Height upto 5m
728
-
11062.92
... More
R.C.C. grade M 25 in substructure including all material,labour, T&P and centering or shuttering etc as per direction of Engineer-in-Charge.
14
-
10892.28
... More
R.C.C M 25 in superstructure including all material,labour, T&P and centering or shuttering etc as per direction of Engineer-in-Charge. Height upto 5m
113
-
11838.12
... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification.
(The reinforcement steel shall be procured from original (primary) steel producers as per specifications.
24
-
73290
... More
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications.
53
-
75056.52
... More
Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting, hoisting, fixing in position for composite girders with shear connectors complete with painting as per drawing and technical specifications Clause 1205.6 -Steel section. in railing, trash rack etc. as per direction of Engineer-in-Charge.
25
-
80985.6
... More
Supply, Fabrication and Erection of Bellmouth for 1400m dia at forebay Hopper as per direction of Engineer-in-Charge.
A:-Supply & Fabrication of Bellmouth as per approved design and drawing @of 70% of quoted rate. B- Erection of Bellmouth including all fitting i.e. Vent pipe etc@ of 30% of quoted rate.
1
-
420000
... More
Painting on Concrete/Steel Surfaces with Epoxy Painting two coats including prime coat with epoxy paint of approved brand on concrete/steel surfaces after through cleaning of surface to give an even shade as per drawing and Technical Specification.
31
-
121.32
... More
Painting on Steel Surfaces-Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification.
135
-
121.68
... More
Supply, Fabrication and erection of Structural work in heavy section Rib support of ISMB 150 mm or as per design requirement including all material, labour, T&P, fittings (i.e. Tie rod, nuts) etc. required for proper completion of the work as per direction of Engineer-in-Charge.
A:-Supply & Fabrication of MS steel Rib on site as per approved design and drawing @of 60% of quoted rate. Supply of rib shall not be more than 50 rib from erected rib
B- Erection of Rib including all fitting @ of 40% of quoted rate.
34
-
108000
... More
Providing and laying 50 mm thick Wet Shotcreting without steel fibres/ wire mesh as per direction of Engineer-in-Charge.
2919
-
1250
... More
Providing and laying 100 mm thick Wet Shotcreting with steel fibres/ wire mesh as per direction of Engineer-in-Charge.
5575
-
1844.4
... More
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P, Centering or shuttering etc. required for proper completion of the work. as per drawings and technical specifications.
90
-
5141.04
... More
Providing and laying, Drilling holes, grouting & rock bolting MS 25 mm dia Resin/Cement capsule type in Tunnel including testing for rock strata and test as per IS 10309, supply of all materials, labour and T & P etc. required for proper completion of the work in the tunnel and portal face.
250
-
1148.4
... More
Switchyard and Allied Works
1
-
1
... More
Earthwork in excavation for structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil- Upto 3 m depth
764
-
358.3
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Hard rock (blasting prohibited) Upto 3 m depth rock.
39
-
659.1
... More
Fillling in foundation trenches as per drawing and technical specification. Earth filling
230
-
230.1
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) filling in required area as per direction of engineer-in-charge.
2178
-
770.7
... More
P.C.C grade M 10
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size).
82
-
6219.8
... More
RCC M20 in substructure including all material,labour, T&P and centering or shuttering etc as per direction of Engineer-in-Charge.
144
-
8620
... More
RCC M20 in superstructure including all material,labour, T&P and centering or shuttering etc as per direction of Engineer-in-Charge. Height upto 5m
260
-
9219.1
... More
RCC M30 in superstructure including all material,labour, T&P and centering or shuttering etc as per direction of Engineer-in-Charge. Height upto 5m
40
-
10142
... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification.
(The reinforcement steel shall be procured from original (primary) steel producers as per specifications.
11
-
61075
... More
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications.
20
-
62547.1
... More
Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting, hoisting, fixing in position for composite girders with shear connectors complete with painting as per drawing and technical specifications.-Steel section in railing,Trash rack etc. as per direction of Engineer-in-Charge
1.5
-
67488
... More
G.I Barbed Wire Fencing 1.8 m high Providing and fixing 1.8 m high GI barbed wire fencing with 2.4 m RCC M15 grade 150 mm x 150 mm concrete post placed every 3 m centre-to-centre founded in M15 grade cement concrete, 0.6 m below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc. complete as per direction of Engineer-in-Charge.
200
-
602.7
... More
Painting on Steel Surfaces-Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification.
360
-
101.4
... More
Providing and laying crushed aggregate (20 to 40 mm) pitching in switchyard surface complete as per drawing and technical specifications. Filling in switchyard area as per direction of Enginner-in-charge.
Note:-Labour cost includes labour required for spreading of aggregate to proper profile and preparation of bed.
875
-
1918.05
... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications.
82
-
3442.3
... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications.
62
-
1915.4
... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge.
113
-
787.5
... More
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P Centering or shuttering etc. required for proper completion of the work. as per drawings and technical specifications.
184
-
4284.2
... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions)
21
-
8049.3
... More
S/F Of Dia.75 mm PVC Pipe For Weep Holes/Drains in concrete including supply of all materials labour and T&p required for proper Completion of work.
50.5
-
164
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements