Uttarakhand Jal Vidyut Nigam Limited Tender
View complete overview of Uttarakhand UJVN Tender
Uttarakhand Jal Vidyut Nigam Limited - UJVN Tender
Machinery and Tools
Eprocure
Opening Date7 Mar 2024
Closing Date8 Apr 2024
Tender Amount₹ 1,16,78,500
Costs
EMD
₹ 2,33,570Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UJWB1_71097_1Bid Award Id
ViewTender No
09/EE(E and M)/Assan Barrage/23-24Tender Authority
Uttarakhand Jal Vidyut Nigam Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling all worn out damaged drum gear & pulley from super structure after removing steel wire ropes from H.R. gates & balance box by chain pulley blocks & gas cuttings & other T&P from both side of Head Regulator Gate No. 1 to 5 of Asan Barrage including all cost of material, labour and T&P required
10
-
-
... More
Manufacturing & fittings new pinion in place of old & worn out pinion from Head Regulator Gate No. 1, to 5 of Asan Barrage as per drawing including all cost of material, labour and T&P required.
10
-
-
... More
Manufacturing &fitting new drum gear in place of old & worn out gears dia. 740mm width 125mm 80 teeth of Head Regulator Gate No. 01 to 05 of Asan Barrage as per drawing including all cost of material, labour and T&P required.
10
-
-
... More
Manufacturing & fitting new Plummer block (75mmф & 70mmф) and their bushes as per sample in place of old & worn out Plummer block and bushes with new nut bolts from Head Regulator Gate No. 1 to 5 of Asan Barrage including all cost of material, labour and T&P required.
30
-
-
... More
Replacing drum gear shaft 75mmф x 800mm long in place of old & worn out shaft of Head Regulator Gate No. 1 to 5 of Asan Barrage as per drawing including all cost of material, labour and T&P required.
10
-
-
... More
Replacing driving pinion shaft 70mm ф x 800 mm long in place of old worn out & damaged shaft of H.R Gate no. 1 to 5 of Asan Barrage as per drawing including all cost of material , labour and T&P required .
10
-
-
... More
Manufacturing new housing flange size 280ф O.D & 95 I.D &36 mm thick with nut bolt fitting on the reduction unit both side for pinion drive shaft of H.R gate 1to5 including all cost of material, labour and T&P required.
10
-
-
... More
Repairing rope drum pulley by changing its 2 no. bronze bushes & 1 no. new pin & welding by hard C.I electrodes in worn out grooves & turning & machining of H.R gate 01 to 05 including all cost of material, labour and T&P required.
10
-
-
... More
Complete overhauling of hand drive unit and gear box (Radicon) by oiling greasing and changing oil seals and its worn out parts including all cost of material , labour and T&P required for proper completion of job.
5
-
-
... More
Complete overhauling of end reduction unit assembly by oiling greasing and changing 02 nos. of damaged and worn out shafts (62mm ф x 390 mm long & 54mm ф x 490 mm long) and bushes and other worn out parts including all cost of material, labour and T&P required for proper completion of job.
10
-
-
... More
Dismantling the old and damaged shaft couplings and replacing these couplings by new one (50%) including all cost of material, labour and T&P required for proper completion of job.
20
-
-
... More
Complete assembling & alignment of rope drum, end reduction unit & rope drum pulley & steel wire rope & balance box of H.R Gate 1 to 5 of Asan Barrage.
10
-
-
... More
Overhauling of Head Regulator Gates
-
-
-
... More
Repairing Back Guide Roller after dismantling from head regulator gate No 01 to 05 of Asan Barrage by Replacing Bearing No. 22315- E1 (FAG/SKF make) by Hydraulic Press and Replacing 02 No lock G.M. Bush and making new eccentric steel Roller shaft and 02 No M.S. lock plate and fitted in to gate at site. Including all cost of material & labour.
40
-
-
... More
Mfg. New side sway roller Assembly and fitting in Head regulator gate 01 to 05 of Asan Barrage by welding after Dismantling old damaged side sway roller from Head regulator gate by gas cutting, Including all cost of material & labour.
20
-
-
... More
Dismantling all damaged rubber seals Nut, Bolts & Clamping Plate & fitted new rubber seals with new S.S. Nut, Bolts after repairing seal seats by welding and grinding gate No 01 to 05 of Head regulator of Asan Barrage. Including all cost of material & labour.
5
-
-