Uttarakhand Jal Vidyut Nigam Limited Tender

View complete overview of Uttarakhand UJVN Tender

Uttarakhand Jal Vidyut Nigam Limited - UJVN Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date27 Feb 2024
Closing Date3 May 2024
Tender Amount₹ 16,95,66,856 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. For Hard rock (blasting prohibited),

1944

-

-

... More
Providing and laying of Empty Cement Bags (Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work.

15000

-

-

... More
Dismantling R.C.C. work on spillway glacis & bucket areas to maintain 50 cm thickness of top surface concrete including cutting of shear keys of size 1.00 mx 0.30 m and 0.45 m deep manually/ by mechanical means with necessary precautions including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.

977

-

-

... More
Drilling 38mm diametre holes and installing of 25mm dia anchor bar including grouting of holes with high performance resin compound for proper anchorage of connecting anchor bar as per drawing and technical specification or as directed by engineer -in-charge including supply of all material, labour, T&P etc required for proper completion of work, excluding cost of anchor bar. (The reinforcement will be paid seperately)

8040

-

-

... More
Supplying, fitting and placing of anchor 25 mm dia bars {(TMT(Fe-500)}, 150 cm into old concrete & 80 cms in fresh concrete with L-Hook to Spillway reinforcement @ 500 mm c/c staggered as per drawing and technical specification or as directed by engineer -in-charge including supply of all material, labour, T&P etc required for proper completion of work.

18492

-

-

... More
Applying solvent free, high potlife & versatile epoxy bonding agent on spillway glacis, bucket area & pier faces as per direction of E/I for bonding of new to old concrete including all cost of material, labour, scaffolding and T&P etc required for proper completion of work.

1723

-

-

... More
Micro Alloyed Cement Concrete (M-40 and above grade) work for repair of RCC work stairs and all old structres including labour, T&P etc for proper completion of work. Including supply of all material, labour etc. required for proper completion of work.

22500

-

-

... More
Application of special mortar for protection of pier faces (about 1.50 m height from bottom) after repair & application of bonding agents (paid separately) as per direction of E/I over micro concrete including all cost of material, labour, shuttering, scaffolding and T&P etc required for proper completion of work.

2040

-

-

... More
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

300

-

-

... More
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.

4500

-

-

... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side of structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge.Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose.(2) The payment will be made once only for execution of all items for such works.

1200

-

-

... More
Plain cement concrete in open foundation complete as per drawing and technical specifications With Batching Plant, Transit Mixer and Concrete Pump for PCC Grade M25 (for cavities/ deep holes in bucket area, CC Block etc.) including all material labour, T&P etc. required for proper completion of work

7080

-

-

... More
Plain/Reinforced cement concrete in open oundation complete as per drawing and technical specifications,With Batching Plant, Transit Mixer and Concrete Pump for RCC Grade M25.

120

-

-

... More
Supplying, fitting and placing TMT(Fe-500) bar reinforcement on spillway glacis (20mm dia @ 20 cm C/C both ways) & bucket area (25 mm dia bars @ 30 cm C/C both ways) as per drawings and technical specifications Clauses 1000 and 1202.

126899

-

-

... More
Attending minor type of repair for full day by engaging and supplying one suitable helper/mali/beldar/mazdoor/labour for carrying simple type of repairing of all work including all T&P etc. complete required for proper completion of the work as per direction of engineer in charge but excluding cost of material. (work like stopping of leakage from spillway gate, cleaning and other misc work).

600

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer for miscellaneous works of catwalk way, approach stair etc. all complete.

3670

-

-

... More
Hire charges of welding machine with single phase with welder, helper and electrodes etc. for cutting Straightening and welding of existing reinforcement as per direction of Engineer in chsrge complete with all material labour, T&P etc. required for proper completion of work.

200

-

-

... More
Providing and laying in position cement concrete of Grade M90 in top 500mm thick layer including shear keys over Spillway glacis & bucket area as per requirement of technical specifications to achieve design profile of the dam spillway glacis including the cost of centering and shuttering complete with all material labour, scaffolding, T&P etc. required for proper completion of work.

1019

-

-

... More
Dewatering of water caused due to seepage of ground water and leakage from gates etc. excluding excavation of foundation but during execution of civil works including supply of pump, operator, khalashi, POL, T&P, accessories required for proper completion of the work.

345600

-

-

... More
Engaging and operation of one no. Hydraulic excavator cum loader machine of bucket size 1 cum with one operator/driver and one helper including cost of the fuel, lubricants and repair maintenance etc. for removal of slip / landslide / excavation earth etc. in dry and wet condition complete in all respect as per direction of Engineer-in-charge. Payment for engaging excavator cum loader shall be made only for actual working hours at site, no idle charges shall be paid. If machine is trapped in slip/earth etc., contractor shall make its own arrangement to haul the machine, for which no extra payment shall be made to contractor, and machine shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor.

1920

-

-

... More
Removal of debris/waste material/ any other material/ waste material by sides of drains/rubbish on road side/park/dust bin and from any other location by full load tractor trolley (Tractor with Trolley, driver, fuel etc.) within the specified colonies as directed by the Engineer-in- charge & includes safe disposal of the same outside the colony area at suitable dumping area including cost of all labour (minimum four nos. labours or more as required), T& P etc. required for proper loading/unloading and safe disposal of waste or any other material etc. required for the proper completion of the work in all respect as per direction of Engineer-in-charge.

282

-

-

... More
Loading and unloading of stone boulder / stone aggregates / sand / kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip)

977

-

-

... More
Cost of Haulage Excluding Loading and Unloading Katcha Track and Track in river bed / nallah bed and choe bed.

30749

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns

2600

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets,kerbs and steps etc.

80

-

-

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. For Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) Item Code.

50

-

-

... More
Cement plum Masonry with 40% plum & 60% (1:2:4) grade M-20 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per direction Engineer-In-charge. as per drawings and technical specifications.

450

-

-

... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh.1-9 opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions).

575

-

-

... More
Random Rubble Masonry Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification.

460

-

-

... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications

144

-

-

... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge.

2040

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment,wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7.12-9

400

-

-

... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203.

480

-

-

... More
Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Rubble stone masonry in cement mortar.

338

-

-

... More
Providing and laying Stone/Boulder Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (excluding cost of stone)

6138

-

-

... More
Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification. Dry rubble masonry

144

-

-

... More
Plastering with cement mortar (1:3),on brickwork in substructure as per technical specification Clauses 613.4 & 1204:-

450

-

-

... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204

3000

-

-

... More
Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.

100

-

-

... More
Providing Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications Grade M15(1:2:4).Including supply of all material, labour and T&P etc. required for proper completion of the work

158

-

-

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

250

-

-

... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work

3000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.