Uttarakhand Jal Vidyut Nigam Limited Tender
View complete overview of Uttarakhand UJVN Tender
Uttarakhand Jal Vidyut Nigam Limited - UJVN Tender
Civil And Construction
Energy, Oil and Gas
Building Construction
Water Storage And Supply
Eprocure
Opening Date1 Feb 2025
Closing Date25 Feb 2025
Tender Amount₹ 49,77,00,000
Costs
EMD
₹ 1,25,00,000Document Cost
₹ 1,18,000Tender Fee
Refer Documents
Summary
Construction Of Power House Building Tail Race Channel Switch Yard And Other Associated Work Of Power House
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UJVN_74606_2Tender No
03/UJVNL/DGM/TP/2023-24Tender Authority
Uttarakhand Jal Vidyut Nigam Limited ViewPurchaser Address
-Website
http://https://www.uttarakhandjalvidyut.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
1.3) Underground Excavation //As per Technical Specification (3.8.1/3.8.2/3.15.1/3.15.2)
1500
-
-
... More
2) ROCK SUPPORTS FOR OPEN/SURFACE EXCAVATION & UNDER GROUND EXCAVATION /As per Technical Specification (SECTION B.4 )
-
-
-
... More
2.1)Rock anchors(25 mm dia ) cement grouted including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.2/4.10.1/4.10.2)
-
-
-
... More
2.1.1) Length up to 6 m
1000
-
-
... More
2.1.2) Length more than 6 m
800
-
-
... More
2.2)Rock anchors (32mm dia.) cement grouted including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.2/4.10.1/4.10.2)
-
-
-
... More
2.2.1) Length up to 6 m
1000
-
-
... More
2.2.2) Length more than 6 m
800
-
-
... More
2.3) Rock bolts ( Resin end anchorage and cement grouted) 25mm dia. /As per Technical Specification
(4.5.3/4.10.1/4.10.2)
-
-
-
... More
2.3.1) Length up to 6 m
1200
-
-
... More
2.3.2) Length more than 6 m
600
-
-
... More
2.4) Rock bolts (Resin end anchorage and cement grouted) 32mm dia. /As per Technical Specification
(4.5.3/4.10.1/4.10.2)
-
-
-
... More
2.4.1) Length up to 6 m
1200
-
-
... More
2.4.2) Length more than 6 m
600
-
-
... More
2.5) Rock Bolt / Rock Anchor Extensions into Concrete (4.5.7/4.10.2)
5
-
-
... More
2.6) Self Drilling Anchor R25 including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.8/4.10.1/4.10.2)
-
-
-
... More
2.6.1) Length up to 6 m
400
-
-
... More
2.6.2)Length more than 6 m
200
-
-
... More
2.7 )Self Drilling Anchor R32 including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.8/4.10.1/4.10.2)
-
-
-
... More
2.7.1)Length up to 6 m
400
-
-
... More
2.7.2) Length more than 6 m
200
-
-
... More
2.8) Chain link fabric /As per Technical Specification (4.7.1/4.10.4.1)
500
-
-
... More
2.9) Welded wire mesh /As per Technical Specification (4.7.2/4.10.4.2)
300
-
-
... More
2.10) Permanent Steel support in pressure shaft underground works under scope of power house /As per Technical Specification (4.8/4.10.5.1)-Steel Ribs
30
-
-
... More
2.11 )Lattice Girders in pressure shaft underground works under scope of power house /As per Technical Specification (4.8.2/4.10.5.1)
5
-
-
... More
2.12 )Steel Lagging in pressure shaft underground works under scope of power house/As per Technical Specification (4.8.4/4.10.5.2)
5
-
-
... More
2.13) Precast Reinforced Concrete lagging in pressure shaft underground works under scope of power house /As per Technical Specification (4.8.4/4.10.5.2)
10
-
-
... More
2.14) Forepoling using Reinforcement Bars in pressure shaft underground works under scope of power house/As per Technical Specification (4.9.1/4.10.6)
20
-
-
... More
2.15) Pipe Roofing using Reinforcement Bars and Structural Steel in pressure shaft underground works under scope of power house/As per Technical Specification (4.9.2/4.10.6.3)
-
-
-
... More
2.15.1 ) 50 Dia. Medium MS pipe
50
-
-
... More
2.15.2) 75 Dia. Medium MS pipe
50
-
-
... More
3.SHOTCRETE / GUNITING /As per Technical Specification (B.5)
-
-
-
... More
3.1)Plain shotcrete /As per Technical Specification(5.1 to 5.17)
250
-
-
... More
3.2)Steel fibre reinforced shotcrete (SFRS) including steel fibre /As per Technical Specification (5.1 to 5.17
500
-
-
... More
4.)FILL,BACKFILL,RIPRAP AND PITCHING/As per Technical Specification (SECTION B.6)
-
-
-
... More
4.1)Random backfill including cost of backfill materials,labour and T&P complete in all respect/As per Technical Specification (6.3/6.10/6.11)
5000
-
-
... More
4.2)Compacted backfill including cost of backfill materials,labour and T&P complete in all respect/As per Technical Specification (6.3/6.10/6.11)
25000
-
-
... More
4.3)Graded/ Inverted Filter including cost of backfill materials,labour and T&P complete in all respect/As per Technical Specification (6.5/6.10/6.11)
1200
-
-
... More
4.4)Stone pitching /As per Technical Specification (6.6/6.10/6.11)
100
-
-
... More
5.)DRILLING AND GROUTING /As per Technical Specification (SECTION B.-7)
-
-
-
... More
5.1)Drilling for Contact/consolidation grouting including labour and T&P complete in all respect/As per Technical Specification (7.8.2.1/7.9.1/7.9.2/7.9.3/7.9.4/7.9.5/7.9.6)
700
-
-
... More
5.2)Grouting operation for contact/consolidation grouting including labour and T&P complete in all respect (Shifting of Equipments)/As per Technical Specification (7.8.2.1/7.9.1/7.9.2/7.9.3/7.9.4/7.9.5/7.9.6)
150
-
-
... More
5.3)Grouting materials for consolidation including cost of cement,sand,admixtures,micro/ultra fine cement and bentonite as per design mix/As per Technical Specification (7.6/7.7/7.9.1/7.9.6)
(1 Bag = 50kg of Cement)
4000
-
-
... More
5.4)Drilling for curtain grouting including labour and T&P complete in all respect /As per Technical Specification(7.8.2.1/7.8.4.6/7.9.7)
300
-
-
... More
5.5)Grouting operation for curtain grouting including labour and T&P complete in all respect (Shifting of Equipments)/As per Technical Specification (7.8.2.1/7.8.4.6/7.9.7)
50
-
-
... More
5.6)Grouting materials for Curtain grouting incuding cost cement,sand,admixtures,micro/ultra fine cement and bentonite as per design mix/As per Technical Specification (7.6/7.7/7.9.1/7.9.6)
(1 Bag = 50kg of Cement)
1000
-
-
... More
5.7)Drilling of drainage hole/probe hole 76mm dia. /As per Technical Specification (7.8.2.1/7.9.9)
200
-
-
... More
5.8)Perforated PVC pipes 50mm dia in drainage holes /As per Technical Specification (7.9.9)
200
-
-
... More
5.9)Drilling of Exploratory Holes / Instrumentation/ Check holes etc. /As per Technical Specification (7.8.2.2)
-
-
-
... More
5.9.1)Drilling Nx/Hx size exploratory hole with core recovery /As per Technical Specification (7.8.2.2/7.9.10)
500
-
-
... More
5.9.2)Drilling Nx/Hx size exploratory hole without core recovery /As per Technical Specification (7.8.2.2/7.9.10)
800
-
-
... More
5.10) Embedded pipes & fittings /As per Technical Specification (7.4.4/7.9.13)
100
-
-
... More
5.11)Water pressure test/Lugeon Test as per IS:6066 /As per Technical Specification (7.8.3/7.4.3/7.9.12)
50
-
-
... More
6.)CONCRETE in Powerhouse foundation, slab,beam,column,spiral casing,machine hall,control building,TRC,service bay,transformer etc.(including cost of dewatering,formwork ,cement,sand,admixtures,micro/ultra fine cement, air entraining agent and bentonite as per design mix etc.)/As per Technical Specification (SECTION B.9)
-
-
-
... More
6.1)Concrete of grade M15/A40 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)
150
-
-
... More
6.2)Concrete of grade M15/A20/As per Technical Specification (9.5/9.16.1/9.16.2/9.17)
850
-
-
... More
6.3)Concreting of grade M20/A40 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)
2700
-
-
... More
6.4)Concrete of grade M20/ A20 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)
8200
-
-
... More
6.5)Concrete of grade M25 /A40 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)
8000
-
-
... More
6.6)Concrete of grade M25 /A20 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)
13000
-
-
... More
6.7)Concrete of grade M35 /A20 /As per Technical Specification (9.5/9.16.1/9.16.2/9.16.10/9.17.1)
100
-
-
... More
6.8)Porous concrete /As per Technical Specification (9.16.14/9.17)
50
-
-
... More
6.9)Plums(stone) in concrete including cost of stones,labour and T&P but excluding cost of concrete as per design mix /As per Technical Specification (9.17.15)
100
-
-
... More
6.10)Non shrinkage epoxy grout/As per Technical Specification (9.16.11/9.17.8)
500
-
-
... More
6.11)Non shrinkage pourable cementious grout/As per Technical Specification (9.16.11/9.17.8)
500
-
-
... More
7.REINFORCING STEEL /As per Technical Specification (SECTION B.11)
-
-
-
... More
7.1)Providing, fabricating and placing in position HYSD reinforcement steel for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, binding with 1.25mm diameter annealed steel wire, welding wherever required, including cost of all materials, machinery, labour, complete and as directed with all leads and lifts. /As per Technical Specification (11/11.10)
2000
-
-
... More
7.2)Providing and fixing Couplers of 32mm dia and more including cost of all materials,labour,T&P etc for proper completion of work /As per Technical Specification (11.7/11.12)
2000
-
-
... More
8.WATERSTOPS /As per Technical Specification (SECTION B.12)
-
-
-
... More
8.1)PVC water stops 300mm wide /As per Technical Specification (12.5.1/12.7)
170
-
-
... More
8.2)PVC water stops 150mm wide /As per Technical Specification (12.5.1/12.7)
70
-
-
... More
8.3)Bituminous coating /As per Technical Specification (12.5.5/12.7)
100
-
-
... More
9.)METAL WORKS /As per Technical Specification (SECTION B.13)
-
-
-
... More
9.1)Providing and fixing G.I Pipe up to 100mm dia including cost of all materials,labour,T&P etc for proper completion of work /As per Technical Specification (13.5.2/13.9.2)
10
-
-
... More
9.2)Providing and fixing G.I Pipe above 100mm dia including cost of all materials,labour,T&P etc for proper completion of work/As per Technical Specification (13.5.2/13.9.2)
10
-
-
... More
9.3)Embedded Metal Works, Miscellaneous steel sections including frames, gratings, covers,climbing irons (rungs), etc /As per Technical Specification (13.7.2/13.7.3/13.7.6/13.9.3/13.9.4/13.9.6)
5000
-
-
... More
9.4)Hand rails/Railing /Ladders /As per Technical Specification (13.7.4/13.7.5/13.7.6/13.9.5/13.9.6)
2000
-
-
... More
9.5)Erection of Metal works supplied by others /As per Technical Specification (13.8/13.9.10)
50
-
-
... More
9.6)Supply and Erection of MS Earthing bar/flat and risers /As per Technical Specification (13.7.2/13.7.3/13.7.6/13.9.3/13.9.4/13.9.6)
5
-
-
... More
9.7)Providing, fabricating and placing in position the roof truss and supporting structural steel works for the powerhouse building including cleaning, straightening, cutting, bending, hooking, lapping, binding, welding wherever required, including cost of all materials, machinery, labour, complete and as directed with all leads and lifts. /As per Technical Specification (13.7.8/13.9.8)
42
-
-
... More
9.8)Providing, fabricating and placing in the position special formwork/shuttering for Barrel concreting in Powerhouse building as per GFC drawings including cleaning, straightening, cutting, bending, hooking, lapping, binding, welding wherever required, including cost of all materials, machinery, labour, complete and as directed with all leads and lifts but exclusive the cost of scarp generated after dismanteling.(after dismanteling the scrap of barrel shuttering shall be the property of contractor)/As per Technical Specification (13.7.8/13.9.8)
2
-
-
... More
10.)MISCELLANEOUS AND ANCILLARY WORKS, SLOPE PROTECTION /As per Technical Specification (SECTION B.15 & B16)
-
-
-
... More
10.1)Gabions /wire crate with boulders filling including all materials./As per Technical Specification (16.3/16.8.2/16.8.3)
600
-
-
... More
10.2)PVC pipes including all labour and T&P required for proper completion /As per Technical Specification (15.5/15.7.5)
-
-
-
... More
10.2.1)75mm nominal dia. /As per Technical Specification (15.5/15.7.5)
300
-
-
... More
10.2.2)100mm nominal dia./As per Technical Specification (15.5/15.7.5)
200
-
-
... More
10.2.3)150mm nominal dia./As per Technical Specification (15.5/15.7.5)
100
-
-
... More
10.3)Random rubble masonry (wet) /As per Technical Specification (16.4.1/16.8.4)
1800
-
-
... More
10.4)Random rubble masonry (dry) /As per Technical Specification (16.4.2/16.8.5)
100
-
-
... More
11)PERMEATION GROUTING (SEEPAGE CUT-OFF WORKS) /As per Technical Specification (SECTION B.19)
-
-
-
... More
11.1)Drilling 136-172 mm dia holes by rotary/odex/percussion drilling including cost of all materials,labour,T&P etc for proper completion of work./As per Technical Specification Item (19.4.4/19.5.1)
300
-
-
... More
11.2)Supply and installation of TAM pipe/perforated grout casing pipe of internal dia 45-65 mm including cost of bentonite,materials,labour,T&P etc for proper completion of work. /As per Technical Specification (19.4.8/19.5.1)
250
-
-
... More
11.3)Permeation Grouting to attain the desired lugeon value including cost of cement,sand,ultra fine cement, sodium silicate, Bentonite,admixtures,all labour,equipment,T&P etc but excluding cost of drilling,cost of TAM pipe and shifting operation cost of equipments(1 Bag = 50kg of Cement)./ As per Technical Specification (19.4.7/19.5.1)
1500
-
-
... More
11.4)Grouting operation for permeation grouting (Shifting of Equipments)/As per Technical Specification (19.4.8 & 19.4.9/19.5.1)
15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%