Uttarakhand Jal Vidyut Nigam Limited Tender

View complete overview of Uttarakhand UJVN Tender

Uttarakhand Jal Vidyut Nigam Limited - UJVN Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date7 Sep 2023
Closing Date30 Sep 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

09/ Ee(civil) / Mb-ii / Chinyalisaur / 2023-24

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work.

240

59736

248.9

... More
Supply Drilling, grouting, of 25 mm Dia Rock bolts by rock drill or wagon drill 90mm Dia including cost of Resin Capsule, all labour, Machinery, T&P etc. Required for proper completion of work as directed by E/I. (Note:- Rate Including 1 mtr. rock bolt extra above Rock surface in per Mtr lenght.)

1440

1902240

1321

... More
Provding and laying in position cement concrete of 1:2:4 excluding cost of centering and shuttering all work up to plinth level

1028.34

6856333

6667.38

... More
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. As per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction

1350

6532515

4838.9

... More
Centering and shuttering including strutting ropping etc and removal of form for foundation,footing bases of colums etc for concrete

1215

727080

598.42

... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls,retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction

509.7

2085998

4092.6

... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction

21.12

50191

2376.5

... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWDUttarakhand specifications)

79.2

83508

1054.4

... More
Reinforced Cement Concrete Work Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering,finishing and reinforcement - All work upto plinth level 1:1.5:3

1.35

12410

9192.86

... More
Reinforcement for R.C.C work using Mild steel & medium tensile steel bar

53.28

4369

82.01

... More
Engaging Labour/Mazdoor for 8 hours in a day inclding all T&P.

50

27915

558.31

... More
Engagment of one number excavator/JCB for excavating & collection of slip & debris including cost of fuel,all material, labour, T&P, driver, operator, maintenance, transportation, insurance, idle charges, taxes and other expenses also required for proper completion of work

120

179532

1496.1

... More
structural steel work riveted,bolted or welded in built up sections,trusses and framed work,including cutting,hoisting,fixing in position and aaplying a priming coat of approoved steel primer all complete.

1494.4

149350

99.94

... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).

20

171718

8585.9

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

337.5

107365

318.12



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.