Uttarakhand Jal Vidyut Nigam Limited Tender
View complete overview of Uttarakhand UJVN Tender
Uttarakhand Jal Vidyut Nigam Limited - UJVN Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date7 Sep 2023
Closing Date30 Sep 2023
Tender AmountRefer Documents
Costs
EMD
₹ 4,81,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
09/ Ee(civil) / Mb-ii / Chinyalisaur / 2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UJVN_62937_1Bid Award Id
ViewTender No
NIT09/EE(Civil)/MB-II/2023-24Tender Authority
Uttarakhand Jal Vidyut Nigam Limited ViewPurchaser Address
-Website
http://https://www.uttarakhandjalvidyut.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work.
240
59736
248.9
... More
Supply Drilling, grouting, of 25 mm Dia Rock bolts by rock drill or wagon drill 90mm Dia including cost of Resin Capsule, all labour, Machinery, T&P etc. Required for proper completion of work as directed by E/I. (Note:- Rate Including 1 mtr. rock bolt extra above Rock surface in per Mtr lenght.)
1440
1902240
1321
... More
Provding and laying in position cement concrete of 1:2:4 excluding cost of centering and shuttering all work up to plinth level
1028.34
6856333
6667.38
... More
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. As per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
1350
6532515
4838.9
... More
Centering and shuttering including strutting ropping etc and removal of form for foundation,footing bases of colums etc for concrete
1215
727080
598.42
... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls,retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
509.7
2085998
4092.6
... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
21.12
50191
2376.5
... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWDUttarakhand specifications)
79.2
83508
1054.4
... More
Reinforced Cement Concrete Work Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering,finishing and reinforcement - All work upto plinth level 1:1.5:3
1.35
12410
9192.86
... More
Reinforcement for R.C.C work using Mild steel & medium tensile steel bar
53.28
4369
82.01
... More
Engaging Labour/Mazdoor for 8 hours in a day inclding all T&P.
50
27915
558.31
... More
Engagment of one number excavator/JCB for excavating & collection of slip & debris including cost of fuel,all material, labour, T&P, driver, operator, maintenance, transportation, insurance, idle charges, taxes and other expenses also required for proper completion of work
120
179532
1496.1
... More
structural steel work riveted,bolted or welded in built up sections,trusses and framed work,including cutting,hoisting,fixing in position and aaplying a priming coat of approoved steel primer all complete.
1494.4
149350
99.94
... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).
20
171718
8585.9
... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
337.5
107365
318.12