Uttarakhand Jal Vidyut Nigam Limited Tender
View complete overview of Uttarakhand UJVN Tender
Uttarakhand Jal Vidyut Nigam Limited - UJVN Tender
Civil And Construction
Eprocure
Opening Date18 Nov 2020
Closing Date15 Dec 2020
Tender AmountRefer Documents
Costs
EMD
₹ 4,50,500Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UJVN_27582_1Bid Award Id
ViewTender No
08/ EE(Civil) / MB-II / Chinyalisaur / 2020-21Tender Authority
Uttarakhand Jal Vidyut Nigam Limited ViewPurchaser Address
-Website
http://https://www.uttarakhandjalvidyut.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing concrete for plain/ reinforced concrete in open foundations complete Nominal mix 1:2.4 (Hand mixing)
52
-
6883.3
... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete
398
-
1915.4
... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete
318.5
-
3430.9
... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge.
18
-
787.5
... More
Providing concrete for plain/ reinforced concrete in open foundations complete R.C.C. grade M 25
29.25
-
8100.6
... More
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
215
-
279.77
... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
2444.44
-
82.01
... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering
11.73
-
7454.91
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure
500
-
287.63
... More
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work.
50
-
4149.9
... More
Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work.
350
-
28.1
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:
1000
-
84.52
... More
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts,
522
-
279.52
... More
Hiring charges of weldiong machine with single phase with welder,helper and electrodes for repair of gates,doors,window etc for 8 houres in aday
100
-
1594.8
... More
Hiring of One no.Generator 33 KVA
400
-
512.05
... More
Deployment of unskilled Labour for 8 hours in a day inclding all T&P. for miscellaneous work which may be required during One Year
200
-
627.75
... More
Engaging masson/plumber for 8 hours in a day including all T&P.
200
-
763.88
... More
Providing & fixing following Diameter GI pipe medium class ISI marked at site B class Pipe 80 mm
9450
-
952.47
... More
Providing & fixing following Diameter GI pipe medium class ISI marked at site B class Pipe 125 mm
500
-
1767.35
... More
Providing following Diameter GI Tee
-
-
-
... More
80 mm
1
-
743.71
... More
125 mm
1
-
3340.26
... More
Providing following Diameter GI Union
-
-
-
... More
80 mm
100
-
1129.04
... More
125 mm
5
-
3976.06
... More
Providing following Diameter GI Elbow Pipe
-
-
-
... More
80 mm
10
-
619.63
... More
125 mm
10
-
3148.2
... More
Providing following Diameter GI Pipe Socket
-
-
-
... More
80 mm
1000
-
389.07
... More
125 mm
20
-
1588.29
... More
Providing following Diameter GI Pipe Plug 80 mm
20
-
212.3
... More
Providing following Diameter GI Pipe Nipple 6 inch 80 mm
100
-
561
... More
Providing following Diameter GI Pipe Flange
-
-
-
... More
80 mm
1800
-
990
... More
125 mm
160
-
1111
... More
Providing following Diameter GI Pipe Bend 80 mm
100
-
858
... More
Providing following Diameter GI Pipe Gate valve
-
-
-
... More
80 mm
10
-
3960
... More
125 mm
1
-
6336
... More
Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-incharge.
200
-
214.3
... More
Supply and fixing heavy duty corrugated flexible pipe 4" diameter frost resistant including all required connectors ,clamp & clips charges, labour, fixing charges etc. including supply of all material, labour, T & P etc required for proper completion of wor
50
-
1950
... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m
37
-
7867.5
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured
10000
-
12.33
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements