Repair And Maintenance Works Of Unit-2 Machine At Pilangad Shp (2 X 1125 Kw) In District Uttarkashi

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repair and Maintenance of Top cover:- Removal of damaged crack portion by deep cutting, grinding, welding by using rod SS 309 MO, complete filling of SS metal by SS 309MO welding rod on the labyrinth ring portion or replacement of new labyrinth ring where the runner to labyrinth ring gap 0.6mm to be maintained ( presently it is 1.86mm) as per OEM Drawings, complete machining of welded portion Complete in all respect including all man & material required for proper completion of work.

1

-

-

... More
BOTTOM COVER:- Dismantling of Bottom Cover, fixing of spare Bottom Cover which shall be provided by UJVNL and testing -complete in all respect including all man & material required

1

-

-

... More
Repair and Maintenance of Bottom Cover:- Removal of damaged crack portion by deep cutting, grinding, welding by using rod SS 309 MO, complete filling of SS metal by SS 309MO welding rod on the labyrinth ring portion OR Replacement of labyrinth ring with new where the runner to labyrinth ring gap 0.6mm to be maintained ( presently it is 1.86mm) as per OEM Drawings, complete machining of welded portion , testing-complete in all respect including all man & material required for proper completion of work.

1

-

-

... More
GUIDE VANE ASSEMBLY:- Cleaning, adjustment, replacement of damaged O rings, Proper Setting of all 24 Nos of guide vanes according to the dimension in drawing ,link & lever drilling, tapping , reaming, replacement of damaged dowel pin & circlip, dry testing and operation- complete in all respect including all man and material required for proper completion of work.

1

-

-

... More
Guide vanes:- Guide vanes (24 nos) repair by welding, grinding & repair of Guide sealing collar of driving and non driving end & machining of collars, complete in all respect including all men, material & all T&P required for proper completion of work.

1

-

-

... More
CompleteTurbine Shaft:- a)Machining of Shaft trust coller and Guide bearing area ( lining to be removed). Removal of run out at shaft seal area by machining. b) Removal of run out at shaft seal area by machining.

1

-

-

... More
Shaft Protection Cover:- Complete Repair, machining , drilling and tapping of Shaft protection cover.

1

-

-

... More
STUFFING BOX:- Complete repairing of stuffing box by welding, grinding and machining of seal seating area for proper function including all man and material required for proper completion of work.

1

-

-

... More
DE BEARING:- Dismantling of top housing, Bottom Housing and inspection of Bearing thrust pads, counter thrust pads, Guide pads, cleaning, scrapping, Proper fixing, adjustment, blue matching of thrust pad with trust collar and guide pad with turbine shaft, complete in all respect including all man and material required for proper completion of work.

1

-

-

... More
Box up, Final Testing & Synchronization of Machine: - Complete reassembly of turbine components, leveling and alignment of complete turbine and generator assembly, checking healthiness of all panel related to Unit-II, after checking of all panel testing of machine in all respect & synchronization of machine with grid.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.