Uttarakhand Jal Vidyut Nigam Limited Tender

View complete overview of Uttarakhand UJVN Tender

Uttarakhand Jal Vidyut Nigam Limited - UJVN Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date16 Aug 2024
Closing Date26 Dec 2024
Tender Amount₹ 1,31,76,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Normal Excavation for all type of Soil without blasting (upto 1.0 cum size boulders)/ As per Technical Specification (SECTION 2.1.1)

27737

-

-

... More
Normal Excavation for all type of Soil with blasting (upto 1.0 cum size boulders)/ As per Technical Specification (SECTION 2.1.2)

27737

-

-

... More
Rock Excavation including dewatering / As per Technical Specification(SECTION 2.2)

-

-

-

... More
Normal Excavation for all type of Rock without blasting / As per Technical Specification(SECTION 2.2.1)

3082

-

-

... More
Excavation for all type of Rock with blasting including surge shaft excavation / As per Technical Specification(SECTION 2.2.2)

3082

-

-

... More
Underground Excavation (Including Dewatering)/ As per Technical Specification(SECTION B.3)

-

-

-

... More
Excavation of Tunnels i.e HRT, Adits & Pressure Shafts/As per Technical Specification(SECTION B.3.1)

-

-

-

... More
Class I, II, & III/ As per Technical Specification(SECTION 3.1.1)

152415

-

-

... More
Class IV and V / As per Technical Specification(SECTION 3.1.2)

126127

-

-

... More
By Multiple drifting due to geological reasons / As per Technical Specification(SECTION 3.1.3)

500

-

-

... More
Removal of material arising from overbreak accepted due to geological conditions/ As per Technical Specification(SECTION 3.4)

26600

-

-

... More
Extra for haulage of excavated materials/ As per Technical Specification(SECTION 3.5)

-

-

-

... More
Beyond 6 km and up to 9 km / As per Technical Specification(SECTION 3.5.1)

1000

-

-

... More
Line drilling / As per Technical Specification(SECTION 3.6)

1945

-

-

... More
Dental excavation / As per Technical Specification(SECTION 3.7)

3000

-

-

... More
Rock stabilization and Supports/ As per Technical Specification(SECTION B.4)

-

-

-

... More
Resin grouted rockbolts 25 mm dia/ As per Technical Specification(SECTION B.4.1)

-

-

-

... More
Rock Anchors / Rock Bolts 25 mm dia As per Technical Specification(SECTION 4.1)

-

-

-

... More
Length upto 4.0 m/ As per Technical Specification(SECTION 4.1.1)

66157

-

-

... More
Length more than 4.0 m and upto 6.0 m/ As per Technical Specification(SECTION 4.1.2)

2000

-

-

... More
Resin grouted rockbolts 32 mm dia/As per Technical Specification(SECTION 4.2)

-

-

-

... More
Length upto 6.0 m/ As per Technical Specification(SECTION 4.2.1)

1000

-

-

... More
Length more than 6.0 m and upto 9.0 m/ As per Technical Specification(SECTION 4.2.2)

475

-

-

... More
Length more than 9.0 m and upto 12.0 m/ As per Technical Specification(SECTION 4.2.3)

475

-

-

... More
Resin grouted rockbolts 36 mm dia/As per Technical Specification(SECTION 4.3)

-

-

-

... More
Length upto 6.0 m/ As per Technical Specification(SECTION 4.3.1)

360

-

-

... More
Length more than 6.0 m and upto 9.0 m/ As per Technical Specification(SECTION 4.3.2)

360

-

-

... More
Length more than 9.0 m and upto 12.0 m/ As per Technical Specification(SECTION 4.3.3)

360

-

-

... More
Rock bolt testing/As per Technical Specification(SECTION 4.4)

-

-

-

... More
Rockbolts 25 mm dia/ As per Technical Specification(SECTION 4.4.1)

873

-

-

... More
Rockbolts 32 mm dia/ As per Technical Specification(SECTION 4.4.2)

38

-

-

... More
Rockbolts 36 mm dia/ As per Technical Specification(SECTION 4.4.3)

18

-

-

... More
Rock Anchor Extension / embedding into concrete where required/ As per Technical Specification(SECTION 4.5.)

2150

-

-

... More
Grouted anchor bar/As per Technical Specification(SECTION 4.6)

-

-

-

... More
25 mm dia/ As per Technical Specification(SECTION 4.6.1)

66157

-

-

... More
32 mm dia/ As per Technical Specification(SECTION 4.6.2)

936

-

-

... More
Water expandable friction anchor/As per Technical Specification(SECTION 4.7)

-

-

-

... More
Length up to 6.0 m/ As per Technical Specification(SECTION 4.7.1)

302

-

-

... More
Self Drilling Hollow Core Anchor/As per Technical Specification(SECTION 4.8)

-

-

-

... More
25 mm dia/ As per Technical Specification(SECTION 4.7.1)

400

-

-

... More
32 mm dia/ As per Technical Specification(SECTION 4.7.1)

330

-

-

... More
Self Drilling Fibre Glass rockbolt 25 mm dia/ As per Technical Specification(SECTION 4.9)

-

-

-

... More
Length upto 6.0 m/ As per Technical Specification(SECTION 4.9.1)

500

-

-

... More
Mesh reinforcement/ As per Technical Specification(SECTION 4.10)

-

-

-

... More
Chain link fabric/ As per Technical Specification(SECTION 4.10.1)

10

-

-

... More
Welded wiremesh/ As per Technical Specification(SECTION 4.10.2)

200

-

-

... More
Lattice Girder / As per Technical Specification(SECTION 4.11)

213

-

-

... More
Steel ribs, supply and installation (including accessories)/As per Technical Specification(SECTION 4.11.1)

781

-

-

... More
Steel lagging supply and installation / As per Technical Specification(SECTION 4.12)

10

-

-

... More
Precast concrete lagging/ As per Technical Specification(SECTION 4.13)

1489

-

-

... More
Drilling for Pregrouting As per Technical Specification(SECTION 4.14)

-

-

-

... More
45 mm dia holes/ As per Technical Specification(SECTION 4.14.1)

2000

-

-

... More
57 mm dia holes/ As per Technical Specification(SECTION 4.14.2)

406

-

-

... More
Grouting Operations / As per Technical Specification(SECTION 4.15)

-

-

-

... More
45 mm dia holes / As per Technical Specification(SECTION 4.15.1)

180

-

-

... More
57 mm dia holes/As per Technical Specification(SECTION 4.15.2)

185

-

-

... More
Fore poling / As per Technical Specification(SECTION 4.16)

-

-

-

... More
Fore poling (Drilling & Installation)/ As per Technical Specification(SECTION 4.16.1)

10

-

-

... More
Grouting Operations / As per Technical Specification(SECTION 4.16.1)

500

-

-

... More
Pipe Roofing / As per Technical Specification(SECTION 4.17)

500

-

-

... More
Pre-drainage holes 45 mm dia / As per Technical Specification(SECTION 4.18)

500

-

-

... More
Shotcrete (M-35)/ As per Technical Specification(SECTION B.5)

-

-

-

... More
Plain Shotcrete(M-35) / As per Technical Specification(SECTION 5.1)

2327

-

-

... More
SFR (M-35) Shotcrete excluding steel fibre / As per Technical Specification(SECTION 5.2)

3089

-

-

... More
Embankment Construction & Backfill / As per Technical Specification(SECTION B.6)

1000

-

-

... More
Drilling, Grouting and Pressure Relief Holes/ As per Technical Specification(SECTION B.7)

-

-

-

... More
Contact Grouting/ As per Technical Specification(SECTION B.7.1)

-

-

-

... More
Drilling of 45 mm dia holes for contact grouting As per Technical Specification(SECTION B.7.2)

-

-

-

... More
For tunnel/ As per Technical Specification(SECTION 7.1.1)

1000

-

-

... More
For tunnel plug/ As per Technical Specification(SECTION 7.1.2)

300

-

-

... More
Grouting Operations / As per Technical Specification(SECTION 7.1.3)

-

-

-

... More
For tunnel/ As per Technical Specification(SECTION 7.1.4)

200

-

-

... More
For tunnel plug/ As per Technical Specification(SECTION 7.1.5)

100

-

-

... More
Drilling of 45 dia holes for Consolidation grouting / As per Technical Specification(SECTION 7.2)

-

-

-

... More
In tunnels & tunnel plug/ As per Technical Specification(SECTION 7.1.2)

500

-

-

... More
Redrilling of holes/ As per Technical Specification(SECTION 7.1.3)

300

-

-

... More
For tunnel plug (50% rate of item no. 7.1.2)/ As per Technical Specification(SECTION 7.1.4)

190

-

-

... More
Drilling for curtain grouting for tunnel plugs / As per Technical Specification(SECTION B.7.3)

-

-

-

... More
Grouting operations/ As per Technical Specification(SECTION 7.3.1)

210

-

-

... More
Redrilling for Curtain Grouting (50% rate of 7.3.1)/ As per Technical Specification(SECTION 7.3.2)

105

-

-

... More
45 mm dia pressure relief holes in the tunnels/ As per Technical Specification(SECTION 7.4)

-

-

-

... More
Drilling of 45 dia holes/ As per Technical Specification(SECTION 7.4.1)

200

-

-

... More
Supply and installation of 36 mm dia perforated PVC pipes As per Technical Specification(SECTION 7.4.2)

170

-

-

... More
Supply and installation of drain outlet devices/ As per Technical Specification(SECTION 7.5)

90

-

-

... More
Non Return Valves (NRV)/ As per Technical Specification(SECTION 7.6)

20

-

-

... More
Drilling of exploratory holes, check holes and holes for instrumentation / As per Technical Specification(SECTION 7.7)

-

-

-

... More
Drilling of 45 dia holes/ As per Technical Specification(SECTION 7.7.1)

130

-

-

... More
Drilling of 76 dia holes/ As per Technical Specification(SECTION 7.7.2)

100

-

-

... More
Drilling of 98 dia holes/ As per Technical Specification(SECTION 7.7.3)

80

-

-

... More
Extra for core recovery/ As per Technical Specification(SECTION 7.7.4)

50

-

-

... More
Water pressure testing - simple water test/ As per Technical Specification(SECTION 7.8)

80

-

-

... More
Embedded pipes and fittings for grouting left permanently in place/ As per Technical Specification(SECTION 7.9)

220

-

-

... More
Placing grout (Excluding cement)/ As per Technical Specification(SECTION 7.10)

1000

-

-

... More
Contact grouting ordered by the Engineer-in-Charge/ As per Technical Specification(SECTION 7.11)

5793

-

-

... More
Fill grouting/ As per Technical Specification(SECTION 7.12)

-

-

-

... More
In Temporary drainage system/ As per Technical Specification(SECTION 7.12.1)

90

-

-

... More
In exploratory holes/ As per Technical Specification(SECTION 7.12.2)

80

-

-

... More
Consolidation grouting including grouting for tunnel plug/ As per Technical Specification(SECTION 7.13)

-

-

-

... More
-Single stage grouting/ As per Technical Specification(SECTION 7.13.1)

140

-

-

... More
-Multiple stage grouting/ As per Technical Specification(SECTION 7.13.2)

80

-

-

... More
Consolidation Grouting materials/ As per Technical Specification(SECTION 7.14)

-

-

-

... More
Cement/ As per Technical Specification(SECTION 7.14.1)

500

-

-

... More
Sand/ As per Technical Specification(SECTION 7.14.2)

15

-

-

... More
Bentonite/ As per Technical Specification(SECTION 7.14.3)

15

-

-

... More
Microfine cement/ As per Technical Specification(SECTION 7.14.4)

29

-

-

... More
Super Plasticizer/ As per Technical Specification(SECTION 7.14.5)

23

-

-

... More
Admixtures/ As per Technical Specification(SECTION 7.14.6)

1000

-

-

... More
Colloidal Silica/ As per Technical Specification(SECTION 7.14.7)

18

-

-

... More
Permeation Grouting including Material/ As per Technical Specification(SECTION B.8)

50

-

-

... More
Concrete (including formwork)/ As per Technical Specification(SECTION B.9)

-

-

-

... More
Plain Cement Concrete lining in Invert including formwork in all tunnels & Shafts / As per Technical Specification(SECTION 9.1)

-

-

-

... More
-M 25/ A20 / As per Technical Specification(SECTION 9.1.1)

6237

-

-

... More
-M 20/ A20 / As per Technical Specification(SECTION 9.1.2)

430

-

-

... More
-M 15/ A20 / As per Technical Specification(SECTION 9.1.3)

1059

-

-

... More
Plain Cement Concrete lining in Overt including formwork in all tunnels & Shafts / As per Technical Specification(SECTION 9.2)

-

-

-

... More
-M 25/ A20 / As per Technical Specification(SECTION 9.2.1)

16000

-

-

... More
-M 20/ A20 / As per Technical Specification(SECTION 9.2.2)

125

-

-

... More
-M 15/ A20 / As per Technical Specification(SECTION 9.2.3)

3000

-

-

... More
Reinforced Cement Concrete in Tunnels/ As per Technical Specification(SECTION 9.3)

-

-

-

... More
-M 25/ A20 / As per Technical Specification(SECTION 9.3.1)

2922

-

-

... More
-M20/ A20 in Geological Approved Overbreaks (75% of rate in 9.3.1)/ As per Technical Specification(SECTION 9.3.2)

628

-

-

... More
Tunnel plugs - M20/ A40 / As per Technical Specification(SECTION 9.4)

2920

-

-

... More
M15/A40 backfill concrete behind steel ribs in geologically approved overbreaks in tunnels/ As per Technical Specification(SECTION 9.5)

24070

-

-

... More
M25/A20 precast concrete including formwork/ As per Technical Specification(SECTION 9.6)

205

-

-

... More
Form Work (included in concrete lining work )/ As per Technical Specification(SECTION B.10)

-

-

-

... More
Reinforcing Steel/ As per Technical Specification(SECTION B.11)

-

-

-

... More
Deformed Reinforcing bars - Grade Fe 500/ As per Technical Specification(SECTION 11.1)

513

-

-

... More
Plain reinforcing bars/ As per Technical Specification(SECTION 11.2)

15

-

-

... More
Couplers/ As per Technical Specification(SECTION 11.3)

-

-

-

... More
32 mm dia/ As per Technical Specification(SECTION 11.3.1)

500

-

-

... More
36 mm dia/ As per Technical Specification(SECTION 11.3.2)

500

-

-

... More
Waterstops and joints (not used)/ As per Technical Specification(SECTION B.12)

-

-

-

... More
Metalworks/ As per Technical Specification(SECTION B.13)

-

-

-

... More
Protective net on top / As per Technical Specification(SECTION 13.1)

1

-

-

... More
Stainless steel Railing/ As per Technical Specification(SECTION 13.2)

276

-

-

... More
GI railing/ As per Technical Specification(SECTION 13.3)

200

-

-

... More
MS Metal works (Ladders, Gratings, Climbing Iron, Frame works, bearing plates, bolts, screw, anchors, MS steel frame works and erection hooks etc) / As per Technical Specification(SECTION 13.4)

3500

-

-

... More
Structural Steel Works ( Not used )/ As per Technical Specification(SECTION B.14)

-

-

-

... More
Building & Architectural Works (Not Used)/ As per Technical Specification(SECTION B.15)

-

-

-

... More
Miscellaneous and Ancillary Works ( Not used)/ As per Technical Specification(SECTION B.16)

-

-

-

... More
Slope protection/ As per Technical Specification(SECTION B.17)

-

-

-

... More
Supply of 9 mm 4-strand Polypropylene (PP) Rope Gabions (UV stabilized)./ As per Technical Specification(SECTION 17.1)

800

-

-

... More
Supply and placing boulders of around 20 kg to 40 kg in weight and 150 mm to 300 mm in size in PP rope gabion box./ As per Technical Specification(SECTION 17.2)

200

-

-

... More
Supply of mechanically woven double twisted hexagonal gabions (Zn coated)./ As per Technical Specification(SECTION 17.3)

640

-

-

... More
Supply and placing boulders of around 20 kg to 40 kg in weight and 150 mm to 300 mm in size in gabion box./ As per Technical Specification(SECTION 17.4)

150

-

-

... More
Random Rubble Masonary Wall/ As per Technical Specification(SECTION 17.5)

-

-

-

... More
Wet R R Masonry/ As per Technical Specification(SECTION 17.5.1)

400

-

-

... More
Dry R R Masonry/ As per Technical Specification(SECTION 17.5.2)

300

-

-

... More
Rock paving in mortar/ As per Technical Specification(SECTION 17.6)

340

-

-

... More
Precast Concrete blocks/ As per Technical Specification(SECTION 17.7)

150

-

-

... More
Wattling Trenches/ As per Technical Specification(SECTION 17.8)

150

-

-

... More
Mulching / Plantation of Grass / Shrubs/ As per Technical Specification(SECTION 17.9)

100

-

-

... More
Jute Geo-Textiles/ As per Technical Specification(SECTION 17.10)

100

-

-

... More
Bally Benching/ As per Technical Specification(SECTION 17.11)

90

-

-

... More
Bamboo Piling/ As per Technical Specification(SECTION 17.12)

80

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.