Construction Of Head Race Tunnel Adits Surge Shaft Excavation Of Penstock Of Tiuni Plasu

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2. UNDER GROUND EXCAVATION In all classes of rocks /As per Technical Specification (SECTION B.3 )

-

-

-

... More
2.1) Adits, HRT, Pressure shaft,surge shaft in all classes of Rock/As per Technical Specification (3.8.1/3.8.2/3.15.1/3.15.2/3.15.3)

310000

-

-

... More
3. ROCK SUPPORTS FOR OPEN/SURFACE WORKS /As per Technical Specification (SECTION B.4 )

-

-

-

... More
3.1 ) Rock anchors (25mm dia.)cement grouted including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.2/4.10.1/4.10.2)

-

-

-

... More
3.1.1 Length up to 6 m

2500

-

-

... More
3.1.2 Length more than 6 m

1500

-

-

... More
3.2) Rock anchors (32mm dia.)cement grouted including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.2/4.10.1/4.10.2)

-

-

-

... More
3.2.1 Length up to 6 m

2500

-

-

... More
3.2.2 Length more than 6 m

1500

-

-

... More
3.3) Rock bolts(25mm dia) ( Resin end anchorage and cement grouted) including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.3/4.10.1/4.10.2)

-

-

-

... More
3.3.1 Length up to 6 m

2500

-

-

... More
3.3.2 Length more than 6 m

1500

-

-

... More
3.4) Rock bolts(32mm dia) ( Resin end anchorage and cement grouted) including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.3/4.10.1/4.10.2)

-

-

-

... More
3.4.1 Length up to 6 m

2500

-

-

... More
3.4.2 Length more than 6 m

1500

-

-

... More
3.5) Rock Bolt / Rock Anchor Extensions into Concrete (4.5.7/4.10.2)

1

-

-

... More
3.6) Self Drilling Anchor R25 including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect/As per Technical Specification (4.5.8/4.10.1/4.10.2)

-

-

-

... More
3.6.1 Length up to 6 m

100

-

-

... More
3.6.2 Length more than 6 m

100

-

-

... More
3.7) Self Drilling Anchor R32 including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect/As per Technical Specification (4.5.8/4.10.1/4.10.2)

-

-

-

... More
3.7.1 Length up to 6 m

100

-

-

... More
3.7.2 Length more than 6 m

100

-

-

... More
3.8) Chain link fabric /As per Technical Specification (4.7.1/4.10.4.1)

100

-

-

... More
3.9) Welded wire mesh /As per Technical Specification (4.7.2/4.10.4.2)

100

-

-

... More
4. ROCK SUPPORTS FOR UNDERGROUND WORKS /As per Technical Specification (SECTION B.4 )

-

-

-

... More
4.1) Rock anchors (25mm dia.) cement grouted including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect/As per Technical Specification (4.5.2/4.10.1/4.10.2)

-

-

-

... More
4.1.1 Length up to 6 m

8000

-

-

... More
4.1.2 Length more than 6 m

6000

-

-

... More
4.2) Rock anchors (32 mm dia.) cement grouted including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect/As per Technical Specification (4.5.2/4.10.1/4.10.2)

-

-

-

... More
4.2.1 Length up to 6 m

6000

-

-

... More
4.2.2 Length more than 6 m

4000

-

-

... More
4.3) Rock bolts(25mm dia)( Resin end anchorage and cement grouted) .including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.3/4.10.1/4.10.2)

-

-

-

... More
4.3.1 Length up to 6 m

8000

-

-

... More
4.3.2 Length more than 6 m

6000

-

-

... More
4.4) Rock bolts(32mm dia)( Resin end anchorage and cement grouted) .including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect /As per Technical Specification (4.5.3/4.10.1/4.10.2)

-

-

-

... More
4.4.1 Length up to 6 m

5000

-

-

... More
4.4.2 Length more than 6 m

4000

-

-

... More
4.5) Rock Bolt / Rock Anchor Extensions into Concrete (4.5.7/4.10.2)

1

-

-

... More
4.6) Self Drilling Anchor R25 including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect/As per Technical Specification (4.5.8/4.10.1/4.10.2)

-

-

-

... More
4.6.1 Length up to 6 m

200

-

-

... More
4.6.2 Length more than 6 m

100

-

-

... More
4.7) Self Drilling Anchor R32 including cost of drilling holes,grouting materials,other materials,labour,T&P,completed in all respect/As per Technical Specification (4.5.8/4.10.1/4.10.2)

-

-

-

... More
4.7.1 Length up to 6 m

100

-

-

... More
4.7.2 Length more than 6 m

100

-

-

... More
4.8) Chain link fabric /As per Technical Specification (4.7.1/4.10.4.1)

50

-

-

... More
4.9) Welded wire mesh /As per Technical Specification (4.7.2/4.10.4.2)

50

-

-

... More
4.10) Permanent Steel support in Adits,HRT,Surge shaft, Pressure shaft and all type of underground works /As per Technical Specification (4.8/4.10.5.1)-Steel Ribs

781

-

-

... More
4.11) Lattice Girders /As per Technical Specification (4.8.2/4.10.5.1)

213

-

-

... More
4.12) Steel Lagging/As per Technical Specification (4.8.4/4.10.5.2)

10

-

-

... More
4.13) Precast Reinforced Concrete lagging /As per Technical Specification (4.8.4/4.10.5.2)

1489

-

-

... More
4.14) Forepoling using Reinforcement Bars/As per Technical Specification (4.9.1/4.10.6)

64

-

-

... More
4.15) Pipe Roofing using Reinforcement Bars and Structural Steel/As per Technical Specification (4.9.2/4.10.6.3)

-

-

-

... More
4.15.1 50 Dia. Medium MS pipe

250

-

-

... More
4.15.2 75 Dia. Medium MS pipe

250

-

-

... More
5. SHOTCRETE/As per Technical Specification (B.5)

-

-

-

... More
5.1) OPEN/SURFACE WORKS

-

-

-

... More
5.1.1) Plain shotcrete /As per Technical Specification(5.1 to 5.17)

1500

-

-

... More
5.1.2) Steel fibre reinforced shotcrete (SFRS) including steel fibre /As per Technical Specification (5.1 to 5.17)

1200

-

-

... More
5.2) UNDERGROUND WORKS

-

-

-

... More
5.2.1) Plain shotcrete /As per Technical Specification(5.1 to 5.17)

1500

-

-

... More
5.2.2) Steel fibre reinforced shotcrete (SFRS) /As per Technical Specification (5.1 to 5.17)

1000

-

-

... More
6. FILL,BACKFILL,RIPRAP AND PITCHING/As per Technical Specification (SECTION B.6)

-

-

-

... More
6.1) Random backfill including cost of backfill materials,labour and T&P complete in all respect/As per Technical Specification (6.3/6.10/6.11)

200

-

-

... More
6.2) Compacted backfill including cost of backfill materials,labour and T&P complete in all respect/As per Technical Specification (6.3/6.10/6.11)

1000

-

-

... More
6.3) Stone pitching /As per Technical Specification (6.6/6.10/6.11)

100

-

-

... More
7. DRILLING AND GROUTING /As per Technical Specification (SECTION B.-7)

-

-

-

... More
7.1) Drilling for Contact/consolidation grouting including labour and T&P complete in all respect/As per Technical Specification (7.8.2.1/7.9.1/7.9.2/7.9.3/7.9.4/7.9.5/7.9.6)

1800

-

-

... More
7.2) Grouting operation for contact/consolidation grouting including labour and T&P complete in all respect (Shifting of Equipments)/As per Technical Specification (7.8.2.1/7.9.1/7.9.2/7.9.3/7.9.4/7.9.5/7.9.6)

400

-

-

... More
7.3) Grouting materials for consolidation including cost of cement,sand,admixtures,micro/ultra fine cement and bentonite as per design mix/As per Technical Specification (7.6/7.7/7.9.1/7.9.6) (1 Bag = 50kg of Cement)

10000

-

-

... More
7.4) Drilling of drainage hole/probe hole 76mm dia. /As per Technical Specification (7.8.2.1/7.9.9)

300

-

-

... More
7.5) Drilling of drainage hole/probe hole 38mm dia. /As per Technical Specification (7.8.2.1/7.9.9)

200

-

-

... More
7.6) Perforated PVC pipes 50mm dia. for drainage

170

-

-

... More
7.7) Drilling of Exploratory Holes / Instrumentation/ Check holes etc. /As per Technical Specification (7.8.2.2)

-

-

-

... More
7.7.1) Drilling Nx/Hx size exploratory hole with core recovery /As per Technical Specification (7.8.2.2/7.9.10)

80

-

-

... More
7.7.2) Drilling Nx/Hx size exploratory hole without core recovery /As per Technical Specification (7.8.2.2/7.9.10)

100

-

-

... More
7.7.3) Embedded pipes & fittings /As per Technical Specification (7.4.4/7.9.13)

220

-

-

... More
8. CONCRETE WORK in lining of Tunnels, Shaft, Galleries , backfill concrete , second stage work etc(including cost of dewatering,formwork ,cement,sand,admixtures,micro/ultra fine cement, air entraining agent,Super plasticizer and bentonite as per design mix etc.)/As per Technical Specification (9.5/9.16.3/9.17.3.1/9.17.3.2) (SECTION B.9)

-

-

-

... More
8.1) Concrete of grade M15/A40 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)

24000

-

-

... More
8.2) Concrete of grade M20/A20 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)

5600

-

-

... More
8.3) Concrete of grade M25/ A20 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)

25000

-

-

... More
8.4) Concrete of grade M25/ A40 /As per Technical Specification (9.5/9.16.1/9.16.2/9.17)

500

-

-

... More
8.5) Concrete of grade M35 /A20 /As per Technical Specification (9.5/9.16.1/9.16.2/9.16.10/9.17)

100

-

-

... More
8.6) Back fill concrete of grade M15/A20 /As per Technical Specification (9.5/9.16.4/9.17.4/9.17.5)

3000

-

-

... More
9. REINFORCING STEEL /As per Technical Specification (SECTION B.11)

-

-

-

... More
9.1) Providing, fabricating and placing in position HYSD reinforcement steel for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, binding with 1.25mm diameter annealed steel wire, welding wherever required, including cost of all materials, machinery, labour, complete and as directed with all leads and lifts. /As per Technical Specification (11/11.12)

513

-

-

... More
9.2) Providing and fixing Couplers of 32mm dia and more including cost of all materials,labour,T&P etc for proper completion of work/As per Technical Specification (11.7/11.12)

1000

-

-

... More
10. WATERSTOPS /As per Technical Specification (SECTION B.12)

-

-

-

... More
10.1) PVC water stops 300 mm wide /As per Technical Specification (12.5.1/12.7)

50

-

-

... More
10.2) PVC water stops 150mm wide /As per Technical Specification (12.5.1/12.7)

50

-

-

... More
10.3) Bituminous coating /As per Technical Specification (12.5.5/12.7)

20

-

-

... More
11. METAL WORKS /As per Technical Specification (SECTION B.13)

-

-

-

... More
11.1) Embedded Metal Works, Miscellaneous steel sections including frames, gratings, covers,climbing irons (rungs) etc /As per Technical Specification (13.7.2/13.7.3/13.7.6/13.9.3/13.9.4/13.9.6)

3500

-

-

... More
11.2) Hand rails/Railing /Ladders /As per Technical Specification (13.7.4/13.7.5/13.7.6/13.9.5/13.9.6)

476

-

-

... More
11.3) Erection of Metal works supplied by others /As per Technical Specification (13.8/13.9.10)

50

-

-

... More
11.4) Air vent pipe /As per Technical Specification(13.7.2/13.9.3)

100

-

-

... More
12. MISCELLANEOUS AND ANCILLARY WORKS, SLOPE PROTECTION /As per Technical Specification (SECTION B.15 & B16)

-

-

-

... More
12.1) Gabions/Wire crate with boulders filling /As per Technical Specification (16.3/16.8.2/16.8.3)

400

-

-

... More
12.2) PVC pipes including all labour and T&P required for proper completion/As per Technical Specification (15.5/15.7.5)

-

-

-

... More
12.2.1) 75mm nominal dia. /As per Technical Specification (15.5/15.7.5)

300

-

-

... More
12.2.2)100mm nominal dia./As per Technical Specification (15.5/15.7.5)

300

-

-

... More
12.2.3)150mm nominal dia./As per Technical Specification (15.5/15.7.5)

300

-

-

... More
12.3) Random rubble masonry (wet) /As per Technical Specification (16.4.1/16.8.4)

400

-

-

... More
12.4) Random rubble masonry (dry) /As per Technical Specification (16.4.2/16.8.5)

300

-

-

... More
12.5) Providing and Fixing gun metal NRV (Non Return Valve) of approved quality (screwed end) of 50 mm.As per Technical Specification (15.5)

20

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.