Opening Date3 Aug 2024
Closing Date17 Aug 2024
Tender Amount₹ 39,76,460 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar

2

3678

1839.46

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

203.36

32228

158.48

... More
Attending minor type of repair for full day by engaging and supplying one suitable plumber/painter 1st class/Mason 2nd class for carrying simple type of repairing of all work includind all T&P etc. complete required for proper completion of the work as per direction of I/C but excluding bcost of material (NSI)

2

1286

643

... More
Supply Helper/Mali/Labour (unskilled) for full day as per requirement for attending miscellaneous works as per direction of the Engineer In Charge for proper completion of the work in emergency with T&P as required

40

21160

529

... More
Hire charges of welding machine/gas cutter with single phase with welder, helper and electrodes etc. for repair and welding of gates, door, window etc. for 8 hrs. in a day complete with all material labour, T&P etc. required for proper completion of work. Including supply of all material labour T&P etc required for proper completion of the work.

20

22020

1101

... More
12 mm cement plaster of mix 1:6 (1 cement: 6 Fine sand) Including supply of all material labour T&P etc required for proper completion of the work.

287.3

85509

297.63

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Including supply of all material labour T&P etc required for proper completion of the work.

1781.27

212648

119.38

... More
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Hot finished welded type tubes. Including supply of all material labour T&P etc required for proper completion of the work.

60

10414

173.57

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.

41.75

9839

235.67

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) . Including supply of all material labour T&P etc required for proper completion of the work.

38.1

248150

6513.13

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominalsize derived from natural sources) . Including supply of all material labour T&P etc required for proper completion of the work.

41.4

291223

7034.38

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Mild steel and Medium Tensile steel bars. Including supply of all material labour T&P etc required for proper completion of the work.

17385.7

1662594

95.63

... More
Centering and shuttering including strutting Foundations, footings, bases of columns, roof, beams, coloum etc. for mass concrete etc. and removal of form for all heights Including supply of all material labour T&P etc required for proper completion of the work.

371

129898

350.13

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources). Including supply of all material labour T&P etc required for proper completion of the work.

12.76

103056

8076.56

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). Including supply of all material labour T&P etc required for proper completion of the work.

5.87

60301

10272.77

... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. : All works upto plinth level 5.33.1.1 concrete of M25 grade with minimum cement content of 330 kg /cum

69.45

589379

8486.38

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement: 4 coarse sand)

34.53

288089

8343.17

... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

28.73

54478

1896.21

... More
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.

8.4

11323

1348.04

... More
Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)

285

40866

143.39

... More
Engaging & operation of one no.Hydraulic excavator cum loader machine (preferably JCB)having capacity 75 BHP with one operator and one helper, including cost of fule lubricants and repair maintenance etc. for removal of slip/landslide/excavation in dry and wet condition, complete in all respect as per direction of I/C. Including supply of all material labour T&P etc required for proper completion of the work

14

15750

1125



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.