Uttarakhand Jal Sansthan Tender
Download documents of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Pipe Line Project
Water Storage And Supply
Eprocure
Opening Date10 Mar 2025
Closing Date22 Mar 2025
Tender AmountRefer Documents
Costs
EMD
₹ 65,500Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UKJS_81341_1Bid Award Id
ViewTender No
2804/E-Nivida/2024-25 Dated 06.03.2025Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dismettling cement conc pavment as per technical specification
28.8
-
-
... More
Excavation of earth for pipe line in soil mixed shingle, bajri and boulder starta lift upto 1.5 m lead upto 30m, i/c reffling, watering, remain in if excavated earth into the trenches and removal of surplus earth upto a distance of 60m from trenches i/c supply of labour T&P etc. all complete
543.23
-
-
... More
Laying, jointing, fixing and testing of MSERW supply of materials pipe of following size, i/c weldeing with testing of pipe line complete.
100 mm dia 4.80 mm thick
1008
-
-
... More
Providing and fixing C.I/ D/F Sluice Valves comfirming to IS: 14846-2000 in position etc complete
100 mm
3
-
-
... More
Providing and fixing C.I/ air Valves comfirming to IS: 14846-2000 in position etc complete
80 mm
2
-
-
... More
Constructing masonary Chamber 1.2x1.2x1.00 cm inside in brick work in cement mortor 1:4
5
-
-
... More
Disposal of building rubbish/malba/similar unserviceable dismantled or waste materials by mechanical means, i/c loading, tranporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge beyond 50 m initial lead i/c all lifts
108.65
-
-
... More
Cartage of pipe from water work to site i/c loading /unloading all work
100 mm dia 4.80 mm thick
1
-
-
... More
Protection Work
Protection works @ 5% of the above items from sl1 1 to 7 and cartage of materials
R.R. 1:6
40.76
-
-
... More
R.R Dry
85.41
-
-
... More
Constt. Of Pump House 3.6 Mtr X 3.6 Mtr X 4.00 Mtr Complete Work as per Unit & Design and Drawing
Pump House 3.6x3.6x4.0
1
-
-
... More
Constt. Of Boundry Wall 30 mtr length for Pump House Complete Work as per Unit & Design and Drawing
Boundry Wall 30 mtr
1
-
-
... More
Constt. Of M.S Iron Gate 3.6 mtr Wide for Pump House Complete Work as per Unit & Design and Drawing
Iron Gate 3.6 Mtr Wide
1
-
-
... More
Constt. Of C.W.R 50.00 KL
Supply of all Materials, labour t&p etc and constt. Of R.C.C C.W.R of following capacity with MS ladder outside & inside of the tank, MS M.H Cover with locking arrangement, supply & fixing of chlorinator, cowl, outlet, over flow and washout pipes with necessary sluice valves, pipe pieces (i/c cost of materials) flowwring 0.60 M wide apron, painting with approved water profing with resilient acrylic polymer having Sun reflectivity Index (SRI) i/c supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 (Provided design & drawing i/c VAT)
50.00 KL
1
-
-
... More
Supply of FRP coated MS bucket type chlorinator of 25 ltr capacity with chlorination arrangement
1
-
-
... More
Protection Work
R.R. 1:6
21.95
-
-
... More
R.R Dry
45.99
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements