Uttarakhand Jal Sansthan Tender

View complete overview of Uttarakhand UJS Tender

Uttarakhand Jal Sansthan - UJS Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date11 Nov 2024
Closing Date19 Nov 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Goom Ws Scheme

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Steel Reinforcement for RCC Work including straightening,cutting,bending,placing in position and binding all complete upto plinth level

0.37

-

-

... More
20 mm thick plaster 1:2 in cement sand mortar

10.8

-

-

... More
Coursed Rubble stone masonry in cement and local sand or bajri (1:4) in foundation and plinth including supply of material labour T & P etc. for proper completion of work.

8.1

-

-

... More
Hand Packed stone filling in back of walls including cost of materials, royality,T&P etc complete .

0.6

-

-

... More
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work.

3.6

-

-

... More
Supply, Carting , laying , jointing ,fixing ,and testing of G.I. screwed pipes with specials and fittings in trenches under ground, outside the building including cutting, threading etc. complete 1) 15mm dia

1890

-

-

... More
2) GI Pipe 20 mm dia

510

-

-

... More
3) GI Pipe 25mm dia

3660

-

-

... More
4) GI Pipe 32 mm dia

1080

-

-

... More
5) GI Pipe 40 mm dia

150

-

-

... More
Dismantaling of following dia screwed and socketed G.I Pipes,specials and fittings including taking out of dismantaled G.I pipes and specials from trenches and stcaking them properly with in 50 m but excluding the cost of earth work(Note :- This item shall be paid with the condition that the recoverd pipe from dismentaling is reusable) 1) 15mm dia

180

-

-

... More
2) GI Pipe 20 mm dia

180

-

-

... More
3) GI Pipe 25mm dia

120

-

-

... More
4) GI Pipe 32 mm dia

330

-

-

... More
5) GI Pipe 40 mm dia

270

-

-

... More
6) GI Pipe 50 mm dia

90

-

-

... More
7) GI Pipe 65 mm dia

30

-

-

... More
Carting ,Re- laying jointing (including cost of jointing materials like white lead, hemp and oil etc.) fixing and testing of M.S. galvanised screwed and socketed pipes (Medium quality), specials and fittings, including cutting and threading etc. complete. 1) 15mm dia

180

-

-

... More
2) GI Pipe 20 mm dia

180

-

-

... More
3) GI Pipe 25mm dia

120

-

-

... More
4) GI Pipe 32 mm dia

90

-

-

... More
5) GI Pipe 40 mm dia

120

-

-

... More
6) GI Pipe 50 mm dia

90

-

-

... More
7) GI Pipe 65 mm dia

30

-

-

... More
Excavation of pipeline trench in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m from trenches including supply of labour, T&P etc complete.Soil mixed with Boulder and bazari

2804.4

-

-

... More
Supply of all materials, labours, T&P. etc.and construct of sluuice valve/reflex valve chamber (450X450)as per type design complete.

4

-

-

... More
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work..

7.78

-

-

... More
R.R. stone masonry laid dry in foundation & plinth and including supply of material labour T & P etc. for proper completion of work.

7.2

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4(1 Cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size).

3.17

-

-

... More
House Hold Connection

62

-

-

... More
Construction of CWR

-

-

-

... More
Supply of all materials, labour T&Petc complete to construct Sump / CWR as per drawing includung cost of all pipes & fittings all complete Capacity of Sump/20.0 KL CWR

1

-

-

... More
Supply of all materials labour T&P etc and install chlorinating chamber as per type design and drawing complete including supply and installation of bucket type chlorinator of 25 liters capacity.

1

-

-

... More
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work...

8

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.6

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8(1 Cement : 4 coarse sand :8 graded stone aggregate 40 mm nominal size).

0.9

-

-

... More
Cartage of Materail

-

-

-

... More
Cartage of Cement from Tanakpur to site of work

22

-

-

... More
Cartage of Sand from Chalthi to site of work

67.88

-

-

... More
Cartage of Grit from Chalthi to site of work

142.2

-

-

... More
Cartage of GI Pipes from Tanakpur to site of work

164

-

-

... More
Cartage of Steel from Tanakpur to site to site of work

2.85

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.