Uttarakhand Jal Sansthan Tender

View complete overview of Uttarakhand UJS Tender

Uttarakhand Jal Sansthan - UJS Tender

Works
Civil And Construction
Pipe Line Project
Water Storage And Supply
Eprocure
Opening Date14 Oct 2023
Closing Date26 Oct 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Provision of Roughening filter cum collecting chamber including supply of all material, labour, T&P etc complete. as per design.

1

-

-

... More
Protection work nearby along the pipe line for proper completion of work. RRSM Laid in 1:6

1.06

-

-

... More
RRSM Laid dry

1.22

-

-

... More
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 17.50 KL

1

-

-

... More
Protection work nearby along the pipe line for proper completion of work. RRSM Laid in 1:6

2.4

-

-

... More
RRSM Laid dry

2.76

-

-

... More
Supply and installation of bucket type chlorinator of 25 liters capacity including bleeching powder solution doser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh with locking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position.(including GST 18.00 %)

1

-

-

... More
SUPPLY MAIN

-

-

-

... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. From trenches including supply of labour,T&P.etc complete.Assuming that 70% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock. Earth & Boulders

838.35

-

-

... More
Medium Rock

279.45

-

-

... More
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. 32 mm dia

2970

-

-

... More
40 mm dia

480

-

-

... More
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. Complete Wheel valves G.M. Gate Valve IS 778 Class-I 32 mm dia

4

-

-

... More
40 mm dia

1

-

-

... More
High head Cast Iron air Valve IS 778 Class-I 50 mm dia 15 mm (T.P.-10kg/Sqcm)

1

-

-

... More
Supply of all materials,labours ,T.&P. etc.and construct Wheel/Gate valve chamber as per design complete.

5

-

-

... More
Supply of all materials,labours ,T.&P. etc.and construct air valve chamber as per design complete.

1

-

-

... More
Supply of all materials,labours ,T.&P. etc.and construct air BPT chamber as per design complete.

1

-

-

... More
Protection work nearby along the pipe line for proper completion of work. RRSM Laid in 1:6

12.4

-

-

... More
RRSM Laid dry

14.29

-

-

... More
Cartage of following pipes, specials & fittings from Rishikesh to site store for proper completion of works.distance upto 260.00 km pakka road & 2.00 km by head load (Including GST 18.00%)

115.75

-

-

... More
DISTRIBUTION SYSTEM

-

-

-

... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 70% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock. Earth & Boulders

3609.77

-

-

... More
Medium Rock

1203.26

-

-

... More
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. 20 mm dia

3620

-

-

... More
25 mm dia

3145

-

-

... More
32 mm dia

6620

-

-

... More
40 mm dia

1470

-

-

... More
Supply of the following fittings including cartage of materials,labours ,T.&P. etc. Complete. G.M. Gate Valve IS 778 Class-I 25 mm dia

2

-

-

... More
32 mm dia

2

-

-

... More
40 mm dia

1

-

-

... More
Supply of all materials,labours ,T.&P. etc.and construct Wheel/Gate valve chamber as per type design complete.

5

-

-

... More
Provision for Cutting of C.C. Kharanja

25.2

-

-

... More
Reinstatement of of C.C. Kharanja

25.2

-

-

... More
Protection work nearby along the pipe line for proper completion of work. RRSM Laid in 1:6

47.06

-

-

... More
RRSM Laid dry

54.23

-

-

... More
Provision for balance FHTC

10

-

-

... More
Cartage of following pipes, specials & fittings from Rishikesh to site store for proper completion of works.distance upto 260.00 km pakka road & 2.00 km by head load (Including GST 18.00%)

413.05

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.