Uttarakhand Jal Sansthan Tender
View complete overview of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Eprocure
Opening Date29 Nov 2022
Closing Date9 Dec 2022
Tender AmountRefer Documents
Costs
EMD
₹ 1,64,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UKJS_52122_1Bid Award Id
ViewTender No
1422/E-Nivida/2022-23 Dated 24.11.2022Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 .
12.50 KL
2
-
-
20.00 KL
1
-
-
Supply and fixing of Bucket type chlorinator of 25 Liter capacity at top of all service reservoirs.
3
-
-
Dismantling of bridle c.c path inside the village and streat including disposal as per requirement in direction of engneer-in-charge
0.24
-
-
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.
G.I. Medium quality
15mm dia
100
-
-
20mm dia
800
-
-
25mm dia
11600
-
-
32mm dia
6600
-
-
Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50.00m but excluding the cost of earth work
20mm dia
250
-
-
25mm dia
250
-
-
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. From trenches including supply of labour,T&P.etc complete. Assuming that 90% pipe line is laid in trenches ,it is estimated that 75% excavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock
Soil mixed with boulder and bajri
3175.2
-
-
Soft rock
882
-
-
Relaying of dismantled G.I.Pipe in true alignment in trenches including supply of all materials,labour,T&P etc. complete.
20mm dia
250
-
-
25mm dia
250
-
-
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. complete
Gate valves (Class-I)as per I S 788/1997
20mm dia
1
-
-
25mm dia
2
-
-
32mm dia
2
-
-
Supply of all materials,labours ,T.&P. etc.and construct Wheel valve chamber as per type design complete
2
-
-
Excavation in ordinary soil mixed with shingle, boulder requiring special T&P like pickaxe, crowbar etc. for foundation including lift upto 1.5 m. and Lead upto 30 m. Including refilling, watering, ramming of excavated earth into the trenches or space between the sides of foundation trenches or in to the plinth and removal and disposal of surplus earth upto a distance of 60 m. from trenches nearby sources, along the pipe line and around the C.W.R.
25.11
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
2.25
-
-
RR stone masonary with 1:6 cement and sand mortar nearby sources and along the pipe line for proper completion of work.
22.5
-
-
RR stone masonary laid in dry for proper completion of work along the pipe line.
42.45
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements