Uttarakhand Jal Sansthan Tender
View complete overview of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Eprocure
Opening Date8 Nov 2022
Closing Date21 Nov 2022
Tender AmountRefer Documents
Costs
EMD
₹ 2,00,800Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UKJS_51385_5Bid Award Id
ViewTender No
351/Vividh/2022-23 dated 2.11.2022Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-Website
http://http://ujs.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Roughening Filter cum Collecting Chamber including supply of all material, labour, T&P etc complete
1
-
-
... More
Protection work nearby along the pipe line for proper completion of work.
RRSM Laid in 1:6
1.02
-
-
... More
RRSM Laid dry
1.19
-
-
... More
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2
17.50 KL
1
-
-
... More
Supply and installation of bucket type chlorinator of 25 liters capacity including bleeching powder solution doser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh with locking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position.
1
-
-
... More
Protection work nearby along the pipe line for proper completion of work.
RRSM Laid in 1:6
2.57
-
-
... More
RRSM Laid dry
2.99
-
-
... More
SUPPLY MAIN
-
-
-
... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 70% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock.
Soil Mixed With Boulders & Bajri
1207.71
-
-
... More
Soft Rock
402.57
-
-
... More
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.
G.I. Pipe Medium quality 25 mm dia
4970
-
-
... More
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. Complete
Gate valves (Class-I)as per I S 788/1997 15 mm dia (T.P.-10 kg/Sqcm)
1
-
-
... More
25 mm dia
6
-
-
... More
Supply of all materials,labours ,T.&P. etc.and construct Wheel/Gate valve chamber as per type design complete.
6
-
-
... More
Supply of all materials,labours ,T.&P. etc.and construct Air valve chamber as per type design complete.
1
-
-
... More
Supply of all materials,labours ,T.&P. etc.and construct BPT Chamber as per type design complete.
3
-
-
... More
Protection work nearby along the pipe line for proper completion of work.
RRSM Laid in 1:6
16.58
-
-
... More
RRSM Laid dry
19.32
-
-
... More
Cartage of following pipes, specials & fittings from Rishikesh to site store for proper completion of works.distance upto 252.00 km pakka road & 2.50 km by head load (Including GST 18.00%)
126.81
-
-
... More
DISTRIBUTION SYSTEM
-
-
-
... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 70% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock.
Soil Mixed With Boulders & Bajri
2036.34
-
-
... More
Soft Rock
678.78
-
-
... More
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.
G.I. Pipe Medium quality
32 mm dia
1470
-
-
... More
40 mm dia
3910
-
-
... More
50 mm dia
3000
-
-
... More
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. Complete
Gate valves (Class-I)as per I S 788/1997 32 mm dia
1
-
-
... More
40 mm dia
1
-
-
... More
50 mm dia
1
-
-
... More
Supply of all materials,labours ,T.&P. etc.and construct Wheel/Gate valve chamber as per type design complete.
3
-
-
... More
Protection work nearby along the pipe line for proper completion of work.
RRSM Laid in 1:6
35.52
-
-
... More
RRSM Laid dry
41.38
-
-
... More
Cartage of following pipes, specials & fittings from Rishikesh to site store for proper completion of works.distance upto 252.00 km pakka road & 2.50 km by head load (Including GST 18.00%)
356.76
-
-
... More
DISTRIBUTION SYSTEM
-
-
-
... More
Testing of Pipe
4
-
-