Uttarakhand Jal Sansthan Tender
View complete overview of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Eprocure
Opening Date19 Nov 2022
Closing Date29 Nov 2022
Tender AmountRefer Documents
Costs
EMD
₹ 68,700Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UKJS_51764_8Bid Award Id
ViewTender No
2417/Nivida/2022-23/90 dated 9.11.2022Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-Website
http://http://ujs.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of SCC/Roughining Filter. As per Unit Estimate
1
-
-
Excavation in foundation for retaining &brest walls in all types of soil including all lead and disposal of surplus material as per direction of engineer-in-charge
18.42
-
-
Providing and placing of P.C.C grade M10 1:3:6 (Hand mixing) with cement sand and 20mm stone ballast including all material,labour,T&P etc. for proper completion of the work as per direction of Engineer in-charge.IN-up to plinth level work
2.04
-
-
Providing and placing of R.C.C grade M20 1:2:4 with cement sand and 20mm stone ballast including all material,labour,T&P etc. for the proper completion of the work as per direction of Engineer- in-charge.
5.61
-
-
Providing,Straightening,cutting,bending and placing of reinforcement steel in position including all labour and T&P involved in R.C.C. Work for proper completion of work as per direction of Engineer In-Charge up to plinth level work
4.4
-
-
Boulder filling/stone pitching in Source gadhera
16
-
-
Random Rubble stone masonary laid 1:6 Cement and sand mortar in breast walls retaining walls parapets scuppers etc including supply of all materials, labour and T&P and royalties etc. complete as per specification clauses 702,704,1202 & 1203 of MORD Specification.
6.75
-
-
Gravity Main:-
-
-
-
Excavation in ordinary soil (loam,clay,sand) for pipe line trenches including lift up to 1.5M and lead up to 30M with back filling,raming of excavated earth in the trenches
366.91
-
-
Providing of all materials Carting from site store to site of work, Laying & Jointing of G.I screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete. 40 mm dia.
200
-
-
50 mm dia.
250
-
-
65 mm dia
824
-
-
Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50m but excluding the cost of earth work (Note :- This item shall be paid with the condition that the recovered pipe from dismantling is reusable.)
40 mm dia.
300
-
-
50 mm dia
400
-
-
Carting of all materials from site store to site of work, Laying & Jointing of of old dismentaled G.I screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete.
40 mm dia.
300
-
-
50 mm dia
400
-
-
Supplying and fixing of following sizes of valves including carting the same upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and cost of earth work and construction of chamber
C.I Air Valve (Screwed)
15 mm dia
6
-
-
Distribution System:-
-
-
-
Excavation in ordinary soil (loam,clay,sand) for pipe line trenches including lift up to 1.5M and lead up to 30M with back filling,raming of excavated earth in the trenches
653.76
-
-
Providing of all materials Carting from site store to site of work, Laying & Jointing of G.I screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete. 15 mm dia
850
-
-
20 mm dia
750
-
-
25 mm dia
550
-
-
32 mm dia.
120
-
-
Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50m but excluding the cost of earth work (Note :- This item shall be paid with the condition that the recovered pipe from dismantling is reusable.)
25 mm dia
50
-
-
32 mm dia.
50
-
-
Carting of all materials from site store to site of work, Laying & Jointing of of old dismentaled G.I screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete.
25 mm dia
50
-
-
32 mm dia.
50
-
-
Supplying and fixing of following sizes of valves including carting the same upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and cost of earth work and construction of chamber
C.I Air Valve (Screwed)
15 mm dia
6
-
-
Miscellaneous Work:-
-
-
-
For Small CWRs in Rural Areas Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities ( in kiloliters ) with M.S. ladder outside & inside of the tank, M.S. M.H. cover with locking arrangement, supply and fixiing of outlet, inlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting on tank body vertical pipes, ladder, M.S. M.H. cover etc. complete with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2. The Cost of CWRs of corresponding capacities has been given in Rupees.
20 KL
1
-
-
Excavation in foundation for retaining breast wall etc in all type of soil and rocks including all lead lift and disposal of surplys material as per direction of enginee in charge.
63.44
-
-
Providing and placing of P.C.C grade M10 1:3:6 (Hand mixing) with cement sand and 20mm stone ballast including all material,labour,T&P etc. for proper completion of the work as per direction of Engineer in-charge.IN-up to plinth level work.
21.68
-
-
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 (Hand mixed)
2.68
-
-
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
116
-
-
Random Rubble stone masonary laid 1:6 c/s mortar including supply of all material, labour and T&P and royalties etc. required for proper completion of work as directed by Engineer in-charge.
74.4
-
-
Providing and placing of R.C.C grade M20 1:2:4 with cement sand and 20mm stone ballast including all material,labour,T&P etc. for the proper completion of the work as per direction of Engineer- in-charge.
0.24
-
-
Providing,Straightening,cutting,bending and placing of reinforcement steel in position including all labour and T&P involved in R.C.C. Work for proper completion of work as per direction of Engineer In-Charge
0.36
-
-
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I.staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.(As per Unit Estimate )
50
-
-
Supply and fixing, Carting of M.S.Gate 1.0mtr.X1.5mtr.
1
-
-
Cons.of valve chamber,with cover and locking (.60mmX.60mmX.40mm) as per Unit Estimate
1
-
-
Supply and fixing of bucket type chlorinator 10 Ltr capacity
1
-
-
Supplying and fixing of following sizes of valves including carting the same upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber.
20 mm Dia
3
-
-
25 mm Dia
1
-
-
32 mm Dia
1
-
-
40 mm Dia
1
-
-
Wall Painting And Slogans work At Diffrent location in Village
8
-
-
Site Clearance & Unforseen Item
15
-
-
Cartage of Material From Railhead to Site of work.