Uttarakhand Jal Sansthan Tender
View complete overview of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date15 Dec 2022
Closing Date26 Dec 2022
Tender AmountRefer Documents
Costs
EMD
₹ 48,500Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UKJS_52866_17Bid Award Id
ViewTender No
2881/Nivida Suchana/2022-23 dated 8.12.2022Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-Website
http://http://ujs.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
40 mm dia
640
-
-
50 mm dia
2000
-
-
Excavation of earth for pipe line in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T&P etc all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock
(Gravity Main & Distribution System)
Soil Mixed with boulder and bajari
976.37
-
-
Medium rock
325.46
-
-
Cartage of following sizes of G.M. valves/Air valve upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber
(Gravity Main & Distribution System)
a) G.M. Gate Valve IS 778 Class-1
50 mm dia
3
-
-
Supply of all materials, labours, T&P etc and construct gate valve chamber (0.60x0.60x0.75) as per type design complete.
3
-
-
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. (Gravity Main, Distribution System & Storage)
20.16
-
-
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete
(Gravity Main, Distribution System & Storage)
20.5
-
-
Supply of all materials, labour, T&P etc and construction of R.C.C. Sump / CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 .
2.0 KL cap.
1
-
-
10.0 KL cap.
1
-
-
Supply of FRP coated MS bucket type chlorinator of 25 ltr capacity with chlorination arrangements
1
-
-
Supply of all materials, labours, T&P etc and making ferrule connection to provide FHTC to the consumer under JJM complete (as per household survey)
8
-
-
Provision of unforeseen Items (Sign Board)
1
-
-
Cartage of Material from foot hill Kotdwar to Site Store at Road head by truck in Pucca & Kachcha Road & also including by head load & stacking of materials