Uttarakhand Jal Sansthan Tender
View complete overview of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date11 Nov 2024
Closing Date19 Nov 2024
Tender AmountRefer Documents
Costs
EMD
₹ 57,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Mulakot Laggabham Ws Scheme
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UKJS_77709_7Tender No
1318/Nivida/80 Dated 21-10-2024Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-Website
http://http://ujs.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Steel Reinforcement for RCC Work including straightening,cutting,bending,placing in position and binding all complete upto plinth level
0.37
-
-
... More
20 mm thick plaster 1:2 in cement sand mortar
9
-
-
... More
Coursed Rubble stone masonry in cement and local sand or bajri (1:4) in foundation and plinth including supply of material labour T & P etc. for proper completion of work.
6.75
-
-
... More
Hand Packed stone filling in back of walls including cost of materials, royality,T&P etc complete .
4.65
-
-
... More
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work.
3.6
-
-
... More
Supply, Carting , laying , jointing ,fixing ,and testing of G.I. screwed pipes with specials and fittings in trenches under ground, outside the building including cutting, threading etc. complete
1) 15mm dia
2550
-
-
... More
2) GI Pipe 20 mm dia
360
-
-
... More
3) GI Pipe 25mm dia
2550
-
-
... More
4) GI Pipe 32 mm dia
1020
-
-
... More
Dismantaling of following dia screwed and socketed G.I Pipes,specials and fittings including taking out of dismantaled G.I pipes and specials from trenches and stcaking them properly with in 50 m but excluding the cost of earth work(Note :- This item shall be paid with the condition that the recoverd pipe from dismentaling is reusable) 1) 15mm dia
30
-
-
... More
2) GI Pipe 20 mm dia
90
-
-
... More
3) GI Pipe 25mm dia
120
-
-
... More
4) GI Pipe 32 mm dia
360
-
-
... More
Carting ,Re- laying jointing (including cost of jointing materials like white lead, hemp and oil etc.) fixing and testing of M.S. galvanised screwed and socketed pipes (Medium quality), specials and fittings, including cutting and threading etc. complete. 1) 15mm dia
30
-
-
... More
2) GI Pipe 20 mm dia
90
-
-
... More
3) GI Pipe 25mm dia
120
-
-
... More
4) GI Pipe 32 mm dia
360
-
-
... More
Excavation of pipeline trench in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m from trenches including supply of labour, T&P etc complete.Soil mixed with Boulder and bazari
1593.1
-
-
... More
Supply of all materials, labours, T&P. etc.and construct of sluuice valve/reflex valve chamber (450X450)as per type design complete.
1
-
-
... More
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work..
15.19
-
-
... More
R.R. stone masonry laid dry in foundation & plinth and including supply of material labour T & P etc. for proper completion of work.
11.94
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4(1 Cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size).
1.78
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8(1 Cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size).
1.44
-
-
... More
House Hold Connection
62
-
-
... More
Construction of 05 KL and 7.5 KL CWR
-
-
-
... More
Supply of all materials, labour T&Petc complete to construct Sump / CWR as per drawing includung cost of all pipes & fittings all complete Capacity of Sump/ 05 KL CWR
1
-
-
... More
Supply of all materials, labour T&Petc complete to construct Sump / CWR as per drawing includung cost of all pipes & fittings all complete Capacity of Sump/7.5 KL CWR
1
-
-
... More
Supply of all materials labour T&P etc and install chlorinating chamber as per type design and drawing complete including supply and installation of bucket type chlorinator of 25 liters capacity.
2
-
-
... More
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work...
5
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
1.2
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8(1 Cement : 4 coarse sand :8 graded stone aggregate 40 mm nominal size).
1.8
-
-
... More
Cartage of Materail
-
-
-
... More
Cartage of Cement from Tanakpur to site of work
17
-
-
... More
Cartage of Sand from Chalthi to site of work
40.48
-
-
... More
Cartage of Grit from Chalthi to site of work
106
-
-
... More
Cartage of GI Pipes from Tanakpur to site of work
131
-
-
... More
Cartage of Steel from Tanakpur to site to site of work
2.45
-
-