Uttarakhand Jal Sansthan Tender

View complete overview of Uttarakhand UJS Tender

Uttarakhand Jal Sansthan - UJS Tender

Works
Civil And Construction
Eprocure
Opening Date20 Sep 2022
Closing Date4 Oct 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and installation of bucket type chlorinator of 25 liters capacity including bleeching powder solution doser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh with locking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position.

2

-

-

... More
Supply and fixing of the Mechnical Type Bulk AMR Water Meter

1

-

-

... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock 1) Soil mixed with boulder and bajri

1202.85

-

-

... More
Soft soil

400.95

-

-

... More
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. G.I. Pipe Medium quality 1) 25 mm dia

3100

-

-

... More
2) 20 mm dia

1650

-

-

... More
3) 15 mm dia

200

-

-

... More
Cartage of following pipes, specials & fittings from Kotdwar to site store for proper completion of works. 1) 25 mm dia

3100

-

-

... More
2) 20 mm dia

1650

-

-

... More
3) 50 mm dia

200

-

-

... More
Supply and fixing of the following fittings including cartage of materials, labour and T&P etc. complete. 1) For 25 mm dia

2

-

-

... More
Supply of all materials, labour and T&P etc. and construct following valve chambers as per type design. Wheel Valve Chamber 45cm x 45cm size

2

-

-

... More
Providing Functional House hold tap Connection (FHTC) from exiting supply main to House hold including with Laying & Jointing of 15 mm G.I Pipe (Medium)line including Excavation of Earth work upto Requried depth , Plain Cement Concret etc, including all materials and Labours etc as per direction of Site Encharge for Proper completion of work.

7

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).

14.22

-

-

... More
RR stone masonary with 1:6 cement and sand mortar nearby sources and along the pipe line for proper completion of work.

79.87

-

-

... More
RR stone masonary laid in dry for proper completion of work along the pipe line.

75.54

-

-

... More
Testing of Pipe and other

3

-

-

... More
Godown and Hiring charges

3

-

-

... More
Advertisement board (SIZE 0.90 x 0.60 Mtr.)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.